Menu

Close

Here's the text.

66.Post-Survey survey results on Sotetsu and JR direct lines (Part 3 during construction)

Last Updated February 28, 2019

Post-Survey Report (Part 3 during construction)

Please see the following PDF file for the post-survey report on the Sotetsu-JR direct line (part 3 during construction).
In addition, texts, photographs, figures, etc. in PDF files are subject to copyright.
Unless permitted by copyright law, such as "reproduction for personal use" or "quotation", copying or diverting without permission is prohibited.

Main part

  • CHAPTER 1 Business Plan
  • Chapter 2 Items of post-survey on Target Projects
  • Chapter 3 Results of Ex-post Investigation
    • 3.1 Progress of construction and post-survey
    • 3.2 Outline of ex-post survey results
    • 3.3 Results of ex-post investigation
      • 3.3.1 Land subsidence
      • 3.3.2 Water elephant (underground water level and spring water flow rate)
      • 3.3.3 Waste and generated soil
  • Chapter 4 Implementation Status of Environmental Conservation Measures

Procedure Status

Please refer to “66. Sotetsu-JR Direct Line Environmental Impact Assessment Procedure” for the status of procedures for this project.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Environmental Impact Assessment Division, Environmental Planning Bureau Policy Coordination Department

Phone: 045-671-2495

Phone: 045-671-2495

Fax: 045-663-7831

Email address: ks-eikyohyoka@city.yokohama.jp

Return to the previous page

Page ID: 911-702-760

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews