Menu

Close

Here's the text.

66.Post-survey results report on the Sotetsu and JR Direct Lines (Part 5 under construction)

Last Updated February 28, 2019

Post-Survey Results Report (Part 5 during construction)

Please see the following PDF file for the Sotetsu / JR Direct Line Ex-post Survey Results Report (Part 5 during construction).
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.

Main part

  • Chapter 1 Business Plan
  • Chapter 2 Items of post-survey on target projects
  • Chapter 3 Results of Post-Survey
    • 3.1 Progress of construction and post-survey
    • 3.2 Overview of Post-Survey Results
    • 3.3 Results of ex-post investigation
      • 3.3.1 Water pollution
      • 3.3.2 Land subsidence
      • 3.3.2 Water elephants (river form, flow rate)
      • 3.3.4 Water elephants (underground water level and flow rate of spring water)
      • 3.3.5 Waste and generated soil
  • Chapter 4 Implementation Status of Measures for Environmental Conservation

Status of Procedures

For the status of the procedure of this project, please refer to “66. Sotetsu / JR Direct Line Environmental Impact Assessment Procedure”.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau

Telephone: 045-671-2495

Telephone: 045-671-2495

Fax: 045-663-7831

Email address: mk-eikyohyoka@city.yokohama.lg.jp

Return to the previous page

Page ID: 307-443-079

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews