Menu

Close

  1. Yokohama-shi Top Page
  2. Business
  3. Support for SMEs
  4. Management Support
  5. Support for capital investment
  6. Photovoltaic power generation introduction support subsidy

Here's the text.

Photovoltaic power generation introduction support subsidy

To achieve carbon neutrality, we will support the introduction of solar power generation facilities implemented by SMEs in Yokohama City. In addition, this subsidy can be used in conjunction with the “2024 Kanagawa Self-consumption Renewable Energy Introduction Cost Subsidy (External Site)” implemented in Kanagawa Prefecture. .

Last Updated November 11, 2024

Notice

The grant application amount as of today on November 11 is 32.1 million yen. (Budget amount: 40 million yen)
The grant application amount as of today on October 17 is 24.3 million yen. (Budget amount: 40 million yen)
The application deadline for granting this grant is November 29, and the performance report deadline is January 31, 2025.
In addition, it takes about one month from the grant application to the grant decision.
Construction starts before the grant is decided will not be accepted, so please check the construction period before applying.
May 20 We have started accepting applications for solar power generation introduction support subsidies.
May 8 We announced about solar power generation introduction support subsidy.
Applications for grants will be accepted from 10:00 on Monday, May 20 to Friday, November 29.
This grant will be accepted on a first-come, first-served basis, and will be closed when the budget amount is reached.

Unauthorized receipt of grants is a crime!

If a fact, false, or injustice that does not meet the grant requirements are discovered after the grant is issued, the applicant will be requested to return the grant already issued.
In addition, as there is a possibility of becoming a crime under criminal law, please check the requirements for recruitment guidance and apply appropriately.

Contents

Recruitment information and flyers

A variety of conditions must be met in order to receive the grant. Please be sure to check the recruitment guide and make sure that the requirements are met before applying.

Overview of System

Grant amount and maximum amount of grant

Grant amount and maximum amount of grant
  Grant amount Maximum amount
When installing solar power generation and storage systems at the same time Amount obtained by multiplying the power generation output by 100,000 yen per kW Up to 5 million yen
When introducing only solar power generation Amount obtained by multiplying the power generation output by 80,000 yen per kW Up to 4 million yen

 If the upper limit exceeds the subsidized expenses (when using the prefectural subsidy together, the amount deducted from the subsidy amount), the subsidized expenses will be the upper limit.

Budget amount

 40 million yen

Major requirements for grants

Major requirements for grants

Requirements for Grantees

 The conditions must be met according to the classification of the introduction method.
 For details, please refer to the Application Guide (P.6 to 8).

※ Small and medium-sized enterprises are corporations or sole proprietors who meet any of the "capital amount or total investment" or "number of employees who always use" as defined in Article 2, Paragraph 1 of the Basic Act on Small and Medium Enterprises listed in the table below. Refer to
Industry Amount of common stock or total amount of investment Employees who always use it
① Manufacturing, construction, transportation, and other industries (excluding 2-4) ¥300 million or less 300 or less
② Wholesale business 100 million yen or less 100 or less
③ Service industry 50 million yen or less 100 or less
④ Food and beverage service business, retail business 50 million yen or less 50 or less

Corporations other than the Companies Act (general incorporated associations, public interest incorporated foundations, general incorporated foundations, public interest incorporated foundations, medical corporations, school corporations, religious corporations, social welfare corporations, agricultural cooperatives, NPO corporations, cooperatives, commercial and industrial cooperatives, Business cooperatives, business cooperatives, business cooperative small associations, etc.) are not eligible.

For details, please refer to the website of the Small and Medium Enterprise Agency and the Ministry of Internal Affairs and Communications “Japan Standard Industrial Classification”.
Small and Medium Enterprise Agency: Definitions of SMEs and Small Businesses

Conditions of equipment to be subsidized

Introduces solar power generation equipment and power storage systems that meet the conditions for each equipment.
※Photovoltaic power generation facilities are subject to self-consumption, and facilities for the purpose of selling electricity are not eligible.

※For details, please refer to the application guide (P.9 to 10).

Flow of Application ★This is a procedure for Yokohama City.

Flow of Grant Application
Flow of application (photovoltaic power generation introduction support subsidy)

①Grant application
 
★Sending a notice of grant grant decision
 
②Introduction of equipment
(Introduction after the date of grant decision)
 
③Submission of Grant Performance Report
 
★Sending notification of subsidy grant amount confirmation
 
⑥Submission of invoice
 
★Transfer of Grants

About grant grant application

Submission deadline

Friday, November 29, 2024

Submission method

Log in to the Yokohama City Electronic Application System from the button below and apply.

Grant application
Grant Application Form

※When you use Yokohama-shi electronic application system for the first time, please complete "new registration (registration as company)" of user beforehand.
 In addition, you can also use the GBiz ID.
 Please be sure to register in the name of the corporation or business operator you are applying for.

Documents to be submitted

Please refer to the application guide (P. 11 to 12) for submitted documents and examples.
Please make sure that you have all the submitted documents at hand before applying.

Click here to download the attached materials.

Documents required to be submitted by all business operators

 If you do not use the electronic application system, please download the style and create it.
  When applying from the electronic application system, it is not necessary to create it because it is directly entered into the WEB form.

Documents to be submitted as necessary

 It is necessary when introducing by lease or PPA.

 Necessary when the owner of the facility where the subsidized facilities are installed is different from the facility user.
 ※Please consult with the person in charge of Yokohama before applying.

Documents to change the grant decision contents of the grant or cancel the grant business

 After receiving the grant grant decision letter of advice, please submit when you change the contents or cancel the grant business.
 ※Please consult with Yokohama City representative before submitting.

Introduction of equipment

Procedure 3 Complete all delivery and construction by the time you apply for the performance report, and complete the payment of the full price.
Depending on the equipment, it may take a schedule until the delivery date, so contracts and orders before the grant is decided are accepted.
However, please note that there is a possibility that it will not be issued after examination.
In addition, please be sure to install equipment and start construction after the date of grant.

Submission of Grant Results Report

Reporting deadline

Friday, January 31, 2025
Applications will be concentrated just before the deadline, so please do not wait for the reporting deadline and apply within 2 weeks after the installation and payment of the equipment is completed.

Submission method

After completing the delivery and construction of the equipment and completing the full payment, enter the necessary items from the "Parent Power Generation Introduction Support Subsidy Performance Report Input Form".

Documents to be submitted

Please refer to the Application Guide (P.18) for documents to be submitted. Please make sure that you have all the submitted documents at hand before applying.

Submission of invoice

Final submission deadline

Friday, February 28, 2025
In principle, the invoice must be submitted within one week after receiving the grant amount confirmation letter.
When you receive the delivery amount confirmation letter, please submit without waiting for the final submission deadline.

Submission method, etc.

Please confirm the documents required for submission and the submission method in the guidance enclosed when sending the grant amount confirmation letter.

About transfer of grant

After Yokohama City receives the appropriate "Grant Invoice", the grant will be transferred to your designated account in about one month.

Contact information

In charge of solar power generation introduction support subsidy in Economic Affairs Bureau Manufacturing Support Division, Yokohama City
Telephone: 045-671-3489 (Reception hours/9: 00-17: 00 * 12: 00-13: 00 and excluding Saturdays, Sundays and holidays)
Email address: ke-yci@city.yokohama.jp

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Manufacturing Support Division, Small and Medium Enterprise Fisheries Promotion Department, Economic Affairs Bureau

Telephone: 045-671-3489 (Reception hours/9: 00-17: 00 * 12: 00-13: 00 and excluding Saturdays, Sundays and holidays)

Telephone: 045-671-3489 (Reception hours/9: 00-17: 00 * 12: 00-13: 00 and excluding Saturdays, Sundays and holidays)

Email address: ke-yci@city.yokohama.jp

Return to the previous page

Page ID: 645-742-554

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews