Menu

Close

Here's the text.

Appointment and dismissal of chief engineer

Last Updated November 30, 2022

When appointing or dismissing the chief engineer of water supply equipment construction, please perform the procedure as described below.

Method of Procedure

Please apply from the following Yokohama City Electronic Application and Notification System.
Please note that this system requires you to log in to the system after registering as a member (free) before proceeding.
If you are using for the first time, please access from the link below, select "New Registration" at the top right of the page, log in after registering as a member, and start the procedure.

Click here for the procedure! → Notification of appointment and dismissal of water supply equipment construction chief engineer (outside site)

Notes

  1. When appointing and dismissing the chief engineer of the water supply equipment construction, please notify us without delay. (Article 25-4 of the Water Supply Act)
  2. If the chief engineer is missing, a new chief engineer shall be appointed within two weeks from the date on which the event occurred (Article 21-2 of the Water Supply Law Enforcement Regulations), or if a new appointment cannot be made, Please complete the abolition / suspension procedure.
    For details, please refer to "Abolition, suspension, and resumption of business."
  3. When report of 2 mentioned above is not submitted, please be careful as it is targeted for cancellation of designation of water supply equipment construction company by rule of 11 of Water Supply Act Article 25.

Inquiries to this page

Water Works Bureau Water Supply Service Department Water Supply Maintenance Division

Telephone: 045-671-3069

Telephone: 045-671-3069

Fax: 045-212-1167

Email address: su-kyusuiiji@city.yokohama.lg.jp

Return to the previous page

Page ID: 918-145-433

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews