Menu

Close

Here's the text.

Application documents list

Last Updated March 1, 2024

Water supply equipment construction application style

Water supply equipment construction application style
Application formExcel versionPDF version
Water supply equipment construction application / enforcement approval applicationExcel (Excel: 76KB)PDF(PDF:515KB)
Notification of water supply equipment construction design change (construction cancellation, application cancellation)Excel (Excel: 36KB)PDF(PDF:225KB)
Water supply equipment construction completion notificationExcel (Excel: 75KB)PDF(PDF:490KB)
Design drawings and completed drawingsExcel (Excel: 774KB)PDF(PDF:92KB)

List of forms

List of forms
List of forms

No.1_Each house meter reading application pertaining to apartment house of water supply equipment directly connected to water receiving tank _ No. 1 style (PDF: 691KB)

No.2_Each house meter conformity certificate _ No. 3 style (PDF: 675KB)
No.3_Construction proxy/agent Selection (Change) Notification _ No. 4 style (PDF: 674KB)

No.4_Notification of Selection (Change) of contact person _ No. 5 style (PDF: 674KB)

No.5_Users (planned) of apartment houses _ No. 6 style (PDF: 64KB)

No.6_Unlocking method of locking device pertaining to apartment house with locking device (change of unlocking method) registration form_ No.7 style (PDF: 756KB)

No.7_Each house meter transfer application form _ No. 8 style (PDF: 734KB)

No.8_ registration form_ No.9 style (PDF: 736KB)

No.9_Each house meter reading cancellation / cancellation notice pertaining to apartment house of water supply equipment directly connected to water receiving tank _ No. 10 style (PDF: 249KB)

No.10_Each house meter reading applicant succession notification pertaining to apartment house of water supply equipment directly connected to water receiving tank _ No. 11 style (PDF: 249KB)

No.11_Water Supply Equipment Cleaning Water Supply Declaration _ No. 12 style (PDF: 674KB)

No.12_Notification of selection (change) in charge of management of intensive meter reading equipment _ No. 18 Form (PDF: 674KB)

No.13_Preliminary survey result report on rehabilitation work of water supply equipment (PDF: 63KB)

No.14_Rehabilitation Construction Enforcement Plan (PDF: 120KB)

No.15_ Planned Water Consumption Application Form (PDF: 61KB)

No.16_ Water supply equipment owner change notification_ twelfth style (PDF: 236KB)

No.17_Notification of change in the owner of the service pipe in residential land (PDF: 71KB)

No.18_registration form pertaining to not submitted a building confirmation certificate (PDF: 102KB)

No.19_ Water Supply Application Form (new construction, etc.) No. 8 style (PDF: 88KB)

No.20_ Water Supply Application Form (Resumption) No. 8 Style 2 (PDF: 80KB)

No.21_Notification of water supply equipment stop (discontinuation) _ No. 9 style (PDF: 82KB)

No.22_ Land Use consent form / branch consent form (PDF: 39KB)

No.24_ Road Drilling Application Procedure Application Form (PDF: 48KB)

No.25_ Road excavation site due to water supply equipment construction Road surface restoration work pledge (PDF: 80KB)
No.26_ parallel private pipe transfer application form in road (for new construction) _ No. 1 style (PDF: 62KB)

No.27_Confirmation letter on the transfer of private pipes in the road _ No. 2 style (PDF: 72KB)

No.28_ Private road (land) private use / use consent form _ No. 9 style (PDF: 166KB)

No.29_ Private Pipe Management Confirmation Form on Public Road (PDF: 73KB)

No.30_Application for water supply plans for construction and other purposes (PDF: 65KB)

No.31_ Condition of Conditions (PDF: 185KB)

No.32_ Hydraulic Calculation Confirmation Form (PDF: 115KB)

No.33_ Water supply equipment construction applicant change registration form (PDF: 100KB)

No.34_ Water pressure survey request form (PDF: 213KB)

No.35_List of people who use apartments (planned) (for new direct water supply new construction) (PDF: 850KB)
No.36_user list of apartment buildings (for switching water supply directly connected to existing buildings) (PDF: 117KB)

No.37_ Transfer application for meter, etc. for each house meter (for switching water supply directly connected to existing buildings) (PDF: 129KB)

No.38_Meter Deposit Form (for switching water supply directly connected to existing buildings) (PDF: 73KB)
No.39_meter installation registration form (for switching water supply directly connected to existing buildings) (PDF: 128KB)
No.40_Application for Deduction of Enrollment Fees (PDF: 90KB)
No.41_Water supply application according to the provisions of Article 35-2, Paragraph 1 of the Yokohama City Water Supply Ordinance _ No. 15 Style 2 (PDF: 584KB)

No.42_ Water supply facilities associated with development activities and consultation application (PDF: 89KB)

No.43_Water supply equipment construction (repair work) registration form (PDF: 85KB)

No.44_Reception tank facility summary book_ No. 1 style (PDF: 286KB)

No.45_Notification of Dismissal (Change) of Delegation Contract Contractor <Reference> (PDF: 59KB)

No.46_Pledge (removal within 90 days) due to postponement of payment of water use subscription fee (PDF: 69KB)

No.47_ Direct connection switching pledge (removal of centralized meter reading board) <Reference> (PDF: 45KB)

No.48_Pledge Switching Direct Connection <Reference> (PDF: 40KB)

No.49_Reason for Special Application (PDF: 89KB)

No.50_Water plumbing status check sheet for apartment houses (for new construction and switching directly water supply) (PDF: 71KB)

No.51_ Water supply pipe status check sheet (confirmation notification) for meter reading of each house related to an apartment house of water supply equipment directly connected to the receiving tank (PDF: 213KB)

No.52_Written oath pertaining to installation of water supply connected sprinkler equipment (PDF: 94KB)

No.53_Water supply equipment construction record photo (PDF: 318KB)

No.54_Written pledge pertaining to direct water supply to the elevated water tank (PDF: 136KB)

No.55_Road Occupation Procedure Delegation Form (PDF: 233KB)
No.56_Road excavation site with water supply equipment construction Road surface restoration work enforcer confirmation letter (PDF: 72KB)

No.57_ Road excavation site due to water supply equipment construction Road surface restoration work notice (PDF: 105KB)

No.58_Unlocking method of locking device pertaining to apartment house with locking device (change of unlocking method) registration form (PDF: 217KB)
No.59 Designated water supply equipment construction company designation application (when there are five or more establishments at the time of update) (PDF: 204KB)
No.60 Designated water supply equipment construction company designation application (when there are three or more establishments at the time of new designation application) (PDF: 248KB)
No.61 Notification of selection (change) person in charge of contact regarding pressure booster water supply equipment No. 1 style (PDF: 96KB)

For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.

Water Works Bureau Customer Service Center

Phone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Water Works Bureau Water Supply Service Dept.

Phone: 045-671-3069

Phone: 045-671-3069

Fax: 045-212-1167

Email address: su-kyusuiiji@city.yokohama.jp

Return to the previous page

Page ID: 930-697-752

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews