Menu

Close

  1. Yokohama-shi Top Page
  2. Business
  3. Menu by field
  4. Water supply
  5. Water supply equipment construction
  6. Water service subscription fee and fees related to water supply equipment construction

Here's the text.

Water service subscription fee and fees related to water supply equipment construction

It is information about "water supply subscription fee", "design examination fee, completion inspection fee" and "construction cost" related to application for water supply equipment construction.

Last Updated October 5, 2022

1 Water service subscription fee

The water use subscription fee is to have people who newly use the water supply to bear part of the cost required for the expansion and maintenance of water supply facilities for the purpose of equalizing the burden between new and current water users. .

Water usage subscription fee is required in the following cases:

  1. When applying for water supply equipment construction to use a new water supply. (New construction work)
  2. When applying for water supply equipment construction to increase the diameter of the water meter or increase the number of used. (Remodeling work)

Water service subscription amount

[New construction work]
The amount listed below according to the diameter of the meter.
However, 82,500 yen is for water supply equipment of detached houses and apartment houses (excluding store parts of apartment houses, multi-family buildings, offices, etc.) for general living, 82,500 yen will be charged. . (

Notice Concerning the 10% consumption tax (PDF: 210KB)

Effective from October 1, 2019
Meter diameter

Per meter
Amount of water service subscription fee (including tax)

13mm.20mm.25mm165,000 yen
40mm1,402,500 yen
50mm2,145,000 yen
75mm5,115,000 yen
100mm8,745,000 yen
150mm19,800,000 yen
200mm44,550,000 yen
250mm79,200,000 yen
300mm132,000,000 yen

Case 1 >>
82,500 yen when constructing a detached house with a water meter with a diameter of 20 mm is installed.
Case 2 >>
82,500 yen x 10 = 825,000 yen when constructing a 10 apartment house with a water meter with a diameter of 20 mm.
[Remodeling work]
When increasing the diameter of the meter is increased, the difference between the amount according to the diameter of the meter before and after the remodeling.

2 Design review fee and completion inspection fee

When new construction or remodeling of water supply equipment, Water Works Bureau is required to undergo a design review before the construction work and a completion inspection after the construction. Fees vary depending on the diameter of the water supply pipe.

Fees for commissions

Design review fee and completion inspection fee (per case)
Water pipe diameterDesign review feeCompletion inspection feeTotal
50 mm or less4,300 yen6,200 yen10,500 yen
75 mm or more19,600 yen15,700 yen35,300 yen

3 Construction costs

Construction costs may be incurred when excavating public roads or when Water Works Bureau employees operate valves during water supply equipment construction.
The amount varies depending on the construction content, so please contact the water supply equipment construction reception desk for a specific breakdown.
For inquiries, please contact: Water supply construction reception center

For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.

Water Works Bureau Customer Service Center

Phone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Water Works Bureau Water Supply Service Dept.

Phone: 045-671-3069

Phone: 045-671-3069

Fax: 045-212-1167

Email address: su-kyusuiiji@city.yokohama.jp

Return to the previous page

Page ID: 558-291-884

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews