Menu

Close

  1. Yokohama-shi Top Page
  2. Business
  3. Menu by field
  4. Water supply
  5. Water supply equipment construction
  6. About water supply use subscription fee and fee related to water supply equipment construction

Here's the text.

About water supply use subscription fee and fee related to water supply equipment construction

It is information about "water supply use subscription fee", "design examination fee, completion inspection fee" and "construction cost" related to application for water supply equipment construction.

Last Updated October 5, 2022

1 Water use subscription fee

The water supply subscription fee is for those who newly use the water supply to bear a part of the cost required for expansion and maintenance of water supply facilities for the purpose of fairness of the burden between new and current water users. is.

Water usage subscription fee is required in the following cases:

  1. When applying for water supply equipment construction to use a new water supply. (New construction)
  2. When applying for water supply equipment construction to increase the caliber of the water meter or increase the number of uses. (Remodeling work)

Water usage subscription amount

[New construction]
The amount listed below according to the diameter of the meter.
However, the diameter of the meter to be installed is 25 mm or less, and the water supply system for detached houses and apartments for general life (excluding store parts of apartment houses, multi-purpose buildings, offices, etc.) is 82,500 yen. . (

Notice regarding the application of 10% consumption tax (PDF: 210KB)

Applicable from October 1, 2019
Meter caliber

Per meter
Amount of water subscription fee (including tax)

13mm.20mm.25mm165,000 yen
40mm1,402,500 yen
50mm2,145,000 yen
75mm5,115,000 yen
100mm8,745,000 yen
150mm19,800,000 yen
200mm44,550,000 yen
250mm79,200,000 yen
300mm132,000,000 yen

Case 1
82,500 yen when building a detached house that installs a water meter with a diameter of 20 mm in new construction
Case 2
82,500 yen x 10 = 825,000 yen when building a new apartment house with a diameter of 20 mm is installed.
[Remodeling work]
When increasing the diameter of the meter, the difference between the amount according to the diameter of the meter before and after remodeling.

2 Design Examination Fees and Completion Inspection Fees

When performing new construction or remodeling of water supply equipment, Water Works Bureau is required to undergo a design review before construction work and a completion inspection after construction work. Fees vary depending on the diameter of the water supply pipe.

Fees

Design review fee and completion inspection fee (per case)
Diameter of water supply pipeDesign review feeCompletion inspection feeTotal
50mm or less4,300 yen6,200 yen10,500 yen
75mm or more19,600 yen15,700 yen35,300 yen

3 Construction costs

Construction costs may be incurred when drilling public roads during water supply equipment construction or when Water Works Bureau employees operate valves.
The amount varies depending on the construction content, so please contact the water supply equipment construction reception desk for specific breakdowns.
Contact: Water supply construction reception center

For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.

Water Works Bureau Customer Service Center

Telephone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Water Works Bureau Water Supply Service Department Water Supply Maintenance Division

Telephone: 045-671-3069

Telephone: 045-671-3069

Fax: 045-212-1167

Email address: su-kyusuiiji@city.yokohama.lg.jp

Return to the previous page

Page ID: 558-291-884

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews