For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.
Water Works Bureau Customer Service Center
Telephone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.
Here's the text.
Last Updated July 16, 2024
To everyone who downloads water supply equipment construction design and construction guidelines
Water supply equipment construction design and construction guidelines have been partially revised. (Applicable from April 1, 2024)
Please refer to the following table for details.
※With the enforcement of laws and regulations related to the development of related laws and regulations to strengthen the functions of related administrations such as health hygiene
From April 1, 2024, administrative work related to water supply maintenance and management was transferred from the Ministry of Health, Labour and Welfare to the Ministry of Land, Infrastructure, Transport and Tourism and the Ministry of the Environment.
This design and construction guideline states "Ministry of Health, Labour and Welfare (Ministry of Health, Labor and Welfare)", and those related to water quality and hygiene are "Ministry of the Environment (Ministry of the Environment)".
For other items, please read "Ministry of Land, Infrastructure, Transport and Tourism (Ministry of Land, Infrastructure, Transport and Tourism)".
New and old comparison table (PDF: 818KB) Page subject to revision (PDF: 1,223KB)
― | Name | Contents | Download |
---|---|---|---|
Cover, Table of Contents, References | ― | ― | |
Chapter 1 | General Rules | General rules of water supply equipment construction design and construction guidelines, definition of terms, etc. | |
Chapter 2 | Structure and Materials | Structure and materials of water supply equipment | |
Chapter 3 | Basic plan of water supply equipment | Basic survey, determination of water supply method, determination of planned amount of water used, determination of water pipe diameter, etc. | |
Chapter 4 | Creation of water supply equipment construction design drawings and completed drawings | Concept, standard for drawing creation, drawing creation when laying S50 ductile cast iron pipes and road parallel pipes with a diameter of 75 mm or more (including private roads) | |
Chapter 5 | Construction application and procedures | Water supply equipment construction application, notification of completion, design change, change of applicant, etc., various permission relations, transfer of private pipes, standard of construction record photos | |
Chapter 6 | Construction of water supply equipment | Coordination to the manager, branching of water supply equipment, burial depth and private use position of water supply pipes, clarification of water supply pipes, installation of valves, installation of water meters, soil construction, removal of plumbing, water supply equipment, water Safety and hygiene measures | |
Chapter 7 | Inspection | Inspection performed by chief engineer, inspection performed by manager, pass / fail of inspection, delivery to water supply equipment owner | |
Reference | ― | Reference Materials | |
Full text | ― | Summary |
Water Works Bureau Customer Service Center
Telephone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Water Works Bureau Water Supply Service Department Water Supply Maintenance Division
Telephone: 045-671-3069
Telephone: 045-671-3069
Fax: 045-212-1167
Email address: su-kyusuiiji@city.yokohama.lg.jp
Page ID: 888-768-532