It is the top of this page

About authorization of plan of earthquake-resistant repair of building

Last update date June 22, 2020

About urgent correspondence to affect new coronavirus infectious disease

With emergency declaration, we assume receptionist by mail about application procedure from the viewpoint of prevention of infection spread for the time being.

Please refer for consultation over telephone. Reference: 045-671-2928

  • When you come to window, I would like cooperation in disinfection of finger with wearing and alcohol antiseptic solution of mask.
  • You may have to wait outside work room to avoid "closeness" and state of "crowd" when window was crowded. As we invite in turn, I apologize for the inconvenience, but I would like cooperation.

In Yokohama-shi, we perform authorization of "plan of earthquake-resistant repair of building" based on law (called "law" as follows.) Article 17 Paragraph 3 about promotion of earthquake-resistant repair of building. When we receive authorization, there are relaxation and special measures of regulations of Building Standard Act. In addition, evaluation of third party is necessary for seismic strengthening plan on receiving authorization.

Summary of system

Object of authorization

From now on earthquake-resistant building which we repair

Merit by authorization

Relaxation of limit to affect ki*fu*kaku

When we receive authorization of plan as thing adapting to standard to advocate in earthquake-resistant repair promotion law Article 17 Paragraph 3 first, No. 2 and No. 3,

By the enlargement, reconstruction, repair of large scale, wood block-like spare no of large scale, we do not receive retroactivity application of ki*fu*kakujikou except earthquake proofing relations regulations.

Relaxation of limit to affect fireproof building

When we receive authorization of plan as thing adapting to standard to advocate in earthquake-resistant repair promotion law Article 17 Paragraph 3 first, No. 2 and No. 4,

By pillar, new establishment and pillar of wall, wood block-like spare no of beam, we do not receive application of regulations of Building Standard Act to modify fireproof building.

Relaxation of limit to affect floor area ratio

When we receive authorization of plan as thing adapting to standard to advocate in earthquake-resistant repair promotion law Article 17 Paragraph 3 first, No. 2 and No. 5,

In the case of the enlargement, we do not receive application of regulations of Building Standard Act to affect floor area ratio.

Relaxation of limit to affect coverage ratio

When we receive authorization of plan as thing adapting to standard to advocate in earthquake-resistant repair promotion law Article 17 Paragraph 3 first, No. 2 and No. 6,

In the case of the enlargement, we do not receive application of regulations of Building Standard Act to affect coverage ratio.


※When we receive authorization of plan when plan of earthquake-resistant repair needs notice of building certification or plan, grant of comfirmed proof is considered that there was.


Application method

At first, please perform prior consultation. We inform about documents necessary for authorization.

Afterwards, you attach required documents to authorized application, and please submit to building Disaster Prevention Section.

Procedure flow

Style to affect certification application

Fee

Free of charge


System summary, related rule

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Housing and Architecture Bureau Planning architecture Disaster Prevention Section

Telephone: 045-671-2928

Telephone: 045-671-2928

Fax: 045-663-3255

E-Mail address [email protected]

Return to the previous page

Page ID: 699-046-361

We come back to the top