Consent and consultation of public facilities (drainage facilities related to public sewerage) associated with development projects

Last Updated November 7, 2024

 Consent and consultation of public facilities (drainage facilities related to public sewerage) accompanying development projects is based on the City Planning Act and the ordinance on coordination of Yokohama City Development Project (hereinafter referred to as the adjustment ordinance). This is a procedure to consult with the facility manager (public sewer manager) and obtain consent.
 In order to apply for a development permit based on Article 29 of the City Planning Act, a written consent based on the results of this consultation is required.

 This consultation does not include discussions on public sewerage facilities established by anyone other than public sewerage managers along with road business, river business, harbor business, park business, land readjustment, redevelopment, prefectural housing complex, etc.

Flow of Procedure

 Consultation application forms based on Article 32 of the City Planning Act and the Adjustment Ordinance Article 6 and Article 18 will be accepted after the day following the expiration of the inspection period prescribed in Article 13, Paragraph 3 of the Adjustment Ordinance. . In addition, when we correspond to development business where re-opinion was submitted or specific large-scale development business, we will accept after the end of discussion with the mayor based on adjustment regulations Article 16.
 For more information, please check the Housing and Architecture Bureau Residential Land Examination Department Residential Land Examination Division website.

Facilities subject to consultation

 Drainage facilities to be discussed are the following related to public sewerage.

 1 Existing public sewerage facilities to be discharged
    To ensure that drainage from the development project area does not cause flood damage in the area around the discharge destination, the drainage capacity of existing public sewerage facilities that will be connected to the existing public sewerage facilities so that drainage from the development project area does not cause flood damage in the area around the discharge destination.
   It is necessary to investigate and confirm. For more information, please refer to the following link.
    Guide for development permission under the City Planning Act (Technical Standards Chapter 5 “12 Installation Standards for Reservoirs, etc.”)

 2 Attributed sewerage facilities
    When the road in the development project area belongs to Yokohama City, the drainage facility newly established under the attribution road will be the attribution sewerage facility to which it belongs.

 3 Drainage facilities
    According to the Sewerage Law, drainage pipes, drains, and other drainage facilities necessary to allow sewage from land and buildings in drainage areas to flow into public sewers.
   Drainage facilities are referred to as drainage facilities and are distinguished from drainage facilities, which is a general term for drainage pipes. In addition, as the scope of drainage facilities, indoor emissions
   Water pipes are not covered, so please refer to “Chapter 1 Section 2 Drainage Equipment” in the Yokohama City Drainage Equipment Handbook for details.

Contact point and contact information for consultation

[Window]
  Sewer Management Division Development Coordinator, Sewerage River Bureau 27th floor south side of City Hall

   ※The window for small-scale development (developed area of less than 0.1 ha) will be Public Works Office in each district.
    However, "when the newly established sewerage facility belongs to Yokohama City" or "when the existing public sewerage facility is paid off"
    Sewer Management Division will be the window. If you are unable to make a decision, please contact us.

[Response items at the counter]
  Basically, please come to the window in the morning.
    ※In the afternoon, please note that the window will be absent due to "examination work in the office" or "on-site inspection work accompanying the completion of Kaihatsu Kohji".
 
 1 Morning window
   ・General questions, inquiries, and consultations related to sewerage installed in connection with development projects
   ・Prior consultation on consultation documents
   ・Acceptance of application for consultation documents (until 11:30)

 2 afternoon window
   ・Consultation on consultation documents after application (after application, please come after adjusting the date and time of meeting with the person in charge of consultation)  
  
   ※Determination of the person in charge of consultation
    The person in charge of the consultation will decide after the application is accepted (after the required documents has accepted the consultation proposal).
    Please note that detailed consultations cannot be made until the person in charge of the consultation is determined.
   (General consultation is available.)

[Contact]
  045-671-2833   ※For specific detailed questions and consultations, please come to the counter.

[E-mail address]
  gk-haisuikyougi@city.yokohama.jp
    ※Application documents cannot be submitted by e-mail. Please bring the required number of copies to the counter.
    ※Items determined by the person in charge will be able to provide simple consultation by e-mail.
     In that case, please use the above address.
    ※Printing as application documents such as documents and drawings of electronic files is not performed in this section. Documents to be submitted after consultation is finalized.
     Please submit a printed copy.

Overview of the Consultation

 This consultation is a consultation pertaining to drainage facilities related to public sewerage in the "Consent / Consultation on Public Facilities, etc." which is a book required for a development permit application. We discuss that drainage facilities targeted for discussion meet standard that Yokohama-shi established based on purpose of Town Planning and Zoning Act and adjustment regulations. Before consultation, be sure to check the standards set in Yokohama City and understand the contents. The outline of the discussion is as follows.

[Main items to be discussed]
 1 consistency with the Yokohama City Public Sewerage Plan
    Refer to the "Yokohama City Drainage Block Drawing Plan Floor Plan" and set the connection destination for rainwater drainage in the development project.
    (In the diversion area, the connection destination for sewage drainage is also set.)

 2 Confirm the drainage capacity of existing public sewerage facilities that will be connected to the wastewater.
    Existing public sewerage facilities that will be connected to the planned sewage volume based on the water collection area and the drainage area of existing public sewerage facilities by the development project.
   Confirm that it has drainage capacity. If it does not meet the standards, rainwater drainage should be installed in the development project area.
   It is necessary to install retarding ponds for temporary storage.
    This item will be an important item that affects the entire development project plan, so please check before deciding the detailed layout of drainage facilities.
   Also, if you have any concerns about the confirmation method, etc., please consult in advance.

 3 Coordination with rainwater runoff control facilities installed based on the adjustment regulations
    When setting up retarding ponds, coordination with rainwater runoff control facilities (Sewer River Bureau River Management Division guidance) to be installed based on the adjustment regulations is necessary.
   Sir.
   When we install rainwater runoff control facility based on the regulations, we can use facility as retarding pond.

 4 Drainage plan within the project area
  (1) Place the drainage equipment necessary to properly drain the sewage in the set water collection area.
  (2) When installing retarding ponds, etc., install drainage equipment so that sewage does not enter.
  (3) If you belong to a road in the development project area, the drainage system located under the road will be a public sewer, so according to the standards of the public sewer.
     It is necessary to design and construct.
  (4) Plan the drainage system with reference to the drainage system handbook and place it appropriately. (Indoor drainage facilities are not included in the drainage facilities.)
    ※The drainage facilities to be placed in this consultation do not guarantee the confirmation of drainage to be carried out in each ward Public Works Office.
     After this consultation and consent, be sure to coordinate with each ward Public Works Office and apply for separate drainage confirmation.
     As a result, if the layout of the drainage system is modified, it is necessary to change this consultation.
  (5) If there is an existing public sewerage facility in the development project area and it is necessary to replace or remove the facility, the facility with the Sewer Management Division administrator in advance.
     You need to pay for it.

[Standards set by Yokohama City]
 1 Guide to Development Permits under the City Planning Act ※Link to page of Housing and Architecture Bureau Residential Land Examination Department Residential Land Examination Division
 2 Guide of the regulations about adjustment of Yokohama-shi development business ※Link to page of Housing and Architecture Bureau Residential Land Examination Department Residential Land Examination Division

Style required for consultation

At the stage of consultation, download the style according to the applicable laws and regulations from the list below and apply.
When submitting the initial consultation documents, please bind them to a flat file.

[Consultation with public sewer manager based on the City Planning Act]
 A list of required attached books is listed on the back of each form.
 1 Initial consultation style (word: 23KB) (submission: 2 copies, copy of applicant: 1 copy)
 2 Change consultation style (word: 23KB) (submission: 2 copies, copy of applicant: 1 copy)
 3 Change notification style (word: 17KB) (submission: 3 copies)

[Consultation with public sewer managers other than the City Planning Act]
 A list of required attached books is listed on the back of each form.
 4 Initial consultation style (word: 22KB) (submission: 2 copies, copy of applicant: 1 copy)
 5 Change consultation style (word: 23KB) (submission: 2 copies, copy of applicant: 1 copy)
 6 Change notification style (word: 17KB) (submission: 3 copies)

[Ordinance Article 18 Clause 2 sixth related style about adjustment of Yokohama-shi development business]
 7 Application Form for Consent Standards for Development Project Plan (submitted at the same time as Form 4 above)
 8 Notification of completion of construction related to development projects (submitted to Sewer Management Division Development Coordinator upon completion of construction)
  Style publication page: Format and description example of regulations about adjustment of Yokohama-shi development business  ※Link to page of Housing and Architecture Bureau Residential Land Examination Department Residential Land Examination Division

[Ordinance Article 6 related style about adjustment of Yokohama-shi development business]
 9 Consultation application on Article 6 of the Ordinance on Coordination of Development Projects (submitted at the same time as the 4th style above)
 10 Notification of completion of construction related to consultation on Article 6 of the Ordinance on Coordination of Development Projects (submitted to Sewer Management Division Development Coordinator upon completion of construction)
  Style publication page: Format and description example of regulations about adjustment of Yokohama-shi development business  ※Link to page of Housing and Architecture Bureau Residential Land Examination Department Residential Land Examination Division

[Other procedures]
 11 Request for management succession of sewerage facilities, etc. associated with development activities (word: 25KB) (when there is a sewerage facility belonging to)
 12 Payment application for public sewer facilities (word: 14KB)
 13 Payment application for public sewerage facilities (with attribution facilities) (word: 14KB)
 14 List of belonging facilities (Excel: 12KB)
 15 Notification of withdrawal of consultation due to development activities (word: 17KB)
 16 Yu Suichi Ledger (infiltration facility) (word: 17KB)
 17 Request for drainage screening related to development projects less than 1,000 m2 (word: 32KB) [for each ward Public Works Office window]
 18 Request for drainage screening (change) for development projects less than 1,000 m2 (word: 29KB) [for each ward Public Works Office window]

Downloading materials related to sewerage facilities

 About various documents about sewer facility, please download from this, and please read.

 1 Yokohama-shi sewer design standard figure (tube)  ※Link to page of sewer River Bureau Technical Management Division
 2 Yokohama City Drainage Equipment Handbook  ※Link to the page of Sewer Management Division Drainage Equipment
 3 Yokohama City Sewerage Design Guidelines (Tube Edition) / Commentary ※Link to page of sewer River Bureau Technical Management Division
 4 Figure of public sewer ledger (outside site)  ※Link to the Daichan Map page
 5 Figure of public sewage service start area (outside site)  ※Link to the Daichan Map page
 6 Rainwater infiltration masu installation standards and infiltration facility installation judgment map  ※Link to page of sewer River Bureau management promotion section

 

Other materials

 1 Yokohama City Drainage Discharge Plan Floor Plan
    You can browse and obtain it at the "Yokohama Building Information Center" on the second floor of the city hall.
    Contact: Sewerage River Bureau Management Promotion Section (Planning charge) (045-671-2838)

 2 Yokohama City Sewerage Seismic Design Guidelines (tube)
    Contact: River Bureau Technical Management Division (in charge of civil engineering) (045-671-3530)

Inquiries to this page

Sewer Management Division Development Coordinator, Sewerage Pipeline Department, River Bureau

Telephone: 045-671-2833

Telephone: 045-671-2833

Fax: 045-641-5330

Email address: gk-haisuikyougi@city.yokohama.jp

Return to the previous page

Page ID: 593-870-727

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews