- Yokohama-shi Top Page
- Business
- Menu by field
- Roads and rivers
- Rivers
- To businesses (River Management Division)
- About setting of rainwater runoff control facility
Here's the text.
About setting of rainwater runoff control facility
Last Updated August 22, 2024
From September 1, 2004, regulations about title of "the regulations about adjustment of Yokohama-shi development business" were enforced.
We show procedure document of rainwater runoff control facility to prescribe in regulations Article 18 Clause 2 fifth as follows.
Standards for Rainwater Runoff Control Facilities
[Standards] of No. 5 (rainwater runoff control facility) of Section 3 of Part 2, Chapter 2, "Procedures for Development Projects" of "Ordinance on Coordination of Yokohama City Development Projects" (hereinafter, [Standards]) ) It is as follows.
(1) [Standards] Rainwater runoff control facilities
It is standard of rainwater runoff control facility of guide of "the regulations about adjustment of Yokohama-shi development business".
(2) [Standards] Town name display of rainwater runoff control facility installation release area
In each ward town name display, if it is described as (part), detailed confirmation is required because the boundary of the installation exclusion area is divided by the town area. Please check separately at the counter in charge of consultation and guidance in the River Management Division.
(3) Rainwater runoff control facility installation release area map
In addition, setting may be exempted in area where rainwater runoff control facility is installed in land readjustment project enforcement area even in setting area. In this case, as well, please check the details at the window of the River Management Division Consultation and Guidance Section.
(4) Rainfall to be planned
"[Standards] 2 (4) C" The 30-year probability of 10-minute unit rainfall calculated from the probability rainfall intensity formula, and the 10-year probability of 10-minute unit rainfall are as follows.
- 30-year probability 10-minute unit rainfall (PDF: 1,053KB)
- 10-year probability 10-minute unit rainfall (PDF: 1,022KB)
(5) Converted storage amount of rainwater infiltration masu and rainwater infiltration pipes
"[Standards] The conversion storage amount of rainwater infiltration masu and rainwater infiltration pipes in 2 (8) shall be calculated as the sum of the standard infiltration amount (calculated by the formula below) and the amount of voids in accordance with the installation standard.
Qf=ko×Kf×1hr×C1×C2
- Qf: Standard penetration of installation facilities (m3/individual)
- ko: Soil saturated permeable coefficient (m / hr) (For the time being, it can be 0.05m / hr in calculating.)
- Kf: Permeable penetration of installation facilities (m2)
- C1: Impact factor (underground water level) 0.9
- C2: Impact coefficient (clozed) 0.9
Use the following results for the conversion storage amount of rainwater infiltration masu and rainwater infiltration pipes calculated by the above formula as ko = 0.05m / hr.
In addition, please see the following for the full text as for "guide of the regulations about adjustment of Yokohama-shi development business".
(Inquiries regarding development consultation: 045-671-2898)
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Sewer River Bureau River Department River Management Division Consultation and Guidance
Telephone: 045-671-2898
Telephone: 045-671-2898
Fax: 045-664-5873
Email address: gk-ike@city.yokohama.lg.jp
Page ID: 274-213-495