Here's the text.
Septic tank notification
Last Updated January 22, 2025
Notice
- Partial amendments to the Septic Tanks Law Enforcement Detailed Regulations (Opinion Submission Period: December 20, Reiwa 6-January 20, Reiwa 7)
For detailsAbout revision of Septic Tank Law enforcement detailed regulations, permission office work handling summary such as Yokohama-shi septic tank cleaning business, business standard such as Yokohama-shi septic tank cleaning business and Yokohama-shi septic tank instruction standardPlease check it out.
*Opinion submission period has ended (January 21, 2025)
Contents
- 1.Flow of installation
- 2.Procedures for installation
- 3.Procedure for completion of construction
- 4.Procedure for Start of Use
- 5.Procedure for Change
- 6.Submission of maintenance status report
- 7.Procedures for suspension, resumption and abolition
- 8.Inquiries and various notification submission destinations
Preliminary confirmation regarding septic tank installation
The installation of septic tanks in the sewerage treatment area is not permitted in principle by law and regulations.
Please confirm in advance whether applicable place is outside processing area from Yokohama-shi administrative map reporting system (outside site).
In addition, in the treatment area, if it is necessary to install a septic tank, such as when the front road is a private road and the sewer pipe is undeveloped, etc.
Please talk with sewer River Bureau Sewer Management Division (Phone: 045-671-2829) beforehand.
In addition, please confirm whether setting place does not correspond to urbanization adjustment area from Yokohama-shi administrative map information system (outside site) when we install building (including restroom ridge). If applicable, please consult with the Housing and Architecture Bureau Adjustment Area Division (Phone: 045-671-4521) in advance.
About septic tank setting of Motoichi, we instruct according to Yokohama-shi septic tank instruction standard (PDF: 845KB).
When installing a new septic tank, please read it carefully and prepare each document.
In Motoichi, we adopt prior examination system to perform procedure of septic tank setting before building confirmation application and, in
Notification to the public health center director from the building supervisor or designated confirmation inspection organization pursuant to the provisions of Article 93, Paragraph 5 of the Building Standards Act upon examination of this document,
And the opinion from the director of the public health center according to the provisions of Article 93, Paragraph 6 of the Building Standards Act to the building supervisor or the designated confirmation inspection organization shall be replaced.
1.Flow of installation
Flow until the start of use of septic tanks
※For installation work, please ask a contractor who has registered the septic tank construction business in Kanagawa Prefecture or has reported the special septic tank construction business.
We can confirm list of septic tank construction business registration supplier in HP (outside site) of Kanagawa construction industry section.
Please refer to Kanagawa construction industry section about special septic tank construction company.
2.Application for installation
- The procedure for setting up a septic tank includes the procedure for setting up a septic tank with a building confirmation (hereinafter referred to as the “joint application procedure”).
There is a separate application septic tank installation procedure without building confirmation (hereinafter referred to as "separate application procedure").
When installing, prepare the following documents in the prescribed number of copies.
(In the case of electronic application, 1 copy)
Joint application procedure (when a building confirmation application is involved)
Please submit septic tank setting plan (three copies) before applying for building confirmation.
Septic tank setting plan (word: 20KB)
Septic tank setting plan (PDF: 12KB)
Septic tank setting plan (entry example) (PDF: 421KB)Separate application procedure (if you do not have a building confirmation application)
Please submit septic tank setting registration form (2 copies) before setting up septic tank.
Septic tank installation registration form (word: 18KB)
Septic tank installation registration form (PDF: 195KB)
Septic tank installation registration form (Entry example) (PDF: 230KB)
→ Click here for submission by the electronic application system (outside site)
attached documents (required)
Septic tank structure diagram (joint application procedure: 3 copies, separate application procedure: 2 copies)
In the case of a type certified septic tank based on the Septic Tanks Law or a type certified septic tank based on the Building Standards Law,
Please attach a copy of the certificate.
In the case of advanced treatment type septic tank, please attach a copy of the rating report.Guide map (Joint application procedure: 1 copy, separate application procedure: 2 copies)
Please fill in the direction, road, target building, etc.Layout plan, building floor plan (joint application procedure: 1 copy, separate application procedure: 2 copies)
Please fill in the position of the septic tank and the introduction / drainage system.
Please fill in the dimensions, scale and floor area on each floor plan.
Fill in the drainage system from each sewage generation point (each toilet, each washroom, etc.) to flowing into the septic tank.Septic tank style end record (joint application procedure: 1 copy, separate application procedure: 1 copy)
After confirming the site, fill in the type of discharge facility and the distinction between public and private sectors.
Septic tank style end record (word: 18KB)
Septic tank style end record (PDF: 47KB)
Septic tank style end record (entry example) (PDF: 220KB)
※ Yokohama City does not allow release by underground penetration.- Septic tank statutory inspection application form (joint application procedure: 1 copy, separate application procedure: 1 copy)
Please attach application about water quality to prescribe in septic tank law Article 7.
Septic tank legal inspection application (word: 16KB)
Septic tank legal inspection application (PDF: 57KB)
attached documents (as appropriate)
- Notes on maintenance (coordinated application procedure: 3 copies, separate application procedure: 2 copies)
For buildings such as apartment houses and rental buildings, please submit a memorandum to clarify management responsibilities.
Memorandum on Maintenance (Word: 18KB)
Memorandum on Maintenance (PDF: 183KB)
- Personnel report (coordinated application procedure: 3 copies, separate application procedure: 2 copies)
Attach if it includes construction uses that calculate the number of workers to be processed based on the number of workers and the number of employees.
Personnel report (Example of preparation) (PDF: 163KB)
- Design Statement and Processing Process Diagram (co-application procedure: 3 copies, separate application procedure: 2 copies)
Please attach it if there are more than 51 tanks.
- Bottom Reinforcing Diagram (co-application procedure: 3 copies, separate application procedure: 2 copies)
Please attach it if there are more than 51 tanks.
※ In the name column of the above documents, please indicate the installer of the septic tank installation registration form or the septic tank installation plan.
Notes
- When submitting application documents for septic tank installation, the person in charge may be absent, so please make a reservation in advance.
For reservations, please call the Business Waste Management Section Treatment Facility Guidance Section (Phone: 045-671-2547). - If the number of persons subject to treatment exceeds 500 (200 in designated areas), in addition to the procedures set forth above, the Company shall apply.
Procedures for specific facilities stipulated in the Water Pollution Control Law are required.Notification Form under the Water Pollution Control LawPlease prepare the documents from the page. - When using drainage facilities and land owned by others for the end of the water, obtain consent for use to prevent trouble.
- Other documents and detailsYokohama-shi septic tank instruction standard (PDF: 845KB)You have you confirm, and please refer to business waste measures section processing facility guidance person in charge.
3.Procedure for completion of construction
When the installation work of the septic tank is completed, please submit a copy of the certificate of the septic tank facility engineer supervised by registration form, who completed the septic tank construction work.
Completed septic tank construction registration form (word: 20KB)
Completed septic tank construction registration form (PDF: 62KB)
→ Click here for submission by the electronic application system (outside site)
4.Procedure for Start of Use
Please submit septic tank use start report within 30 days after use start.
Septic tank use start report (word: 20KB)
Septic tank use start report (PDF: 13KB)
Septic tank use start report (entry example) (PDF: 394KB)
→ Click here for submission by the electronic application system (outside site)
5.Procedure for Change
Septic tank change registration form (Article 5, Paragraph 1 of the Septic Tanks Act)
When change of structure of septic tank or change of scale (change of treatment method, change of the person targeted for treatment or change of daily average sewage more than 10%), please submit.
Septic tank change registration form (word: 18KB)
Septic tank change registration form (PDF: 199KB)
→ Click here for submission by the electronic application system (outside site)Change of septic tank installation notification items registration form (Article 3, Paragraph 2 of the Enforcement Regulations of the Septic Tank Law)
When change (installer, builder, septic tank) other than the above occurs, please submit.
Change of septic tank installation notification items registration form (word: 19KB)
Septic tank installation notification items change registration form (PDF: 6KB)
→ Click here for submission by the electronic application system (outside site)- Report of septic tank manager change (Article 10-2, Paragraph 3 of the Septic Tanks Act, Article 4, Paragraph 3 of the Septic Tanks Act Enforcement Detailed Regulations)
When septic tank manager changes (built-for-sale house or other sale, formation of Residential Association, etc.), person who became new septic tank manager must submit within 30 days.
In the case of a corporation, the septic tank manager is regarded as a corporation. If there is no change in the corporation, notification accompanying the name change of the representative is not required. - Septic tank manager change report (word: 19KB)
Septic tank manager change report (PDF: 7KB)
→ Electronic application system (outside site)Click here for submission. Report of septic tank technology manager change (Article 10-2, Paragraph 2 of the Septic Tanks Act, Article 4, Paragraph 2 of the Septic Tanks Act Enforcement Detailed Regulations)
If you change the technical manager, please submit it within 30 days.
Septic tank technology manager change report (word: 20KB)
Septic tank technology manager change report (PDF: 13KB)
→ Click here for submission by the electronic application system (outside site)
6.Submission of maintenance status report
The manager of the deemed septic tank (single treatment septic tank) with more than 201 people to be treated and the combined septic tank with more than 51 people to be treated is the previous year (from April 1 of the previous year to March 31 of that year) Please state the maintenance status in the septic tank maintenance status report and submit it by June 30 every year.
Septic tank maintenance status report (word: 30KB)
Septic tank maintenance status report (PDF: 95KB)
Septic tank maintenance status report (Excel: 24KB)
→ Click here for submission by the electronic application system (outside site)
7.Procedures for suspension, resumption and abolition
- Procedures for suspension (Article 11-2, Paragraph 1 of the Septic Tanks Act, Article 9-3 of the Enforcement Regulations of the Septic Tanks Act related to the Ministry of the Environment)
When we suspend use of septic tank, we can submit septic tank use suspension registration form.
In that case, please submit it together with the cleaning record.
Septic tank use suspension registration form (word: 17KB)
Septic tank use suspension registration form (PDF: 199KB)
→ Electronic application system (outside site)Click here for submission.
- Procedures for reopening (Article 11-2, Paragraph 2 of the Septic Tanks Act, Article 9-4 of the Enforcement Regulations of the Septic Tanks Act related to the Ministry of the Environment)
When we resume use of septic tank which performed suspension procedure, please submit septic tank use resumption registration form within 30 days from day when we resumed.
Resuming use of septic tanks registration form (word: 17KB)
Resuming use of septic tanks registration form (PDF: 230KB)
→ Electronic application system (outside site)Click here for submission.
- Procedures for abolition of use (Article 11-3 of the Septic Tanks Act, Article 9-5 of the Enforcement Regulations of the Septic Tanks Act related to the Ministry of the Environment)
When septic tank manager abolishes use of septic tank, please submit septic tank use abolition registration form within 30 days.
Also,Yokohama-shi septic tank cleaning business permission supplierAsk cleaning to perform disinfection so that hygiene problems do not occur.
Use of septic tanks registration form (word: 17KB)
Use of septic tanks registration form (PDF: 174KB)
Septic tank use abolition registration form (Entry example) (PDF: 96KB)
→ Electronic application system (outside site)Click here for submission.
8.Submission method and destination
[electronic application system]
Yokohama-shi electronic application, report system (outside site)
[mail, next agency]
〒231-0005
23rd floor of 10 City Hall at 6-50 Honcho, Naka-ku, Yokohama City
Resources and Waste Recycling Bureau Business Waste Management Section Treatment Facility Supervisor
[Phone / FAX]
Telephone: 045-671-2547
FAX: 045-663-0125
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Resources and Waste Recycling Bureau Business Waste Management Department Business Waste Management Section
Telephone: 045-671-2547
Telephone: 045-671-2547
Fax: 045-663-0125
Email address: sj-jokaso@city.yokohama.lg.jp
Page ID: 698-398-029