Suehiro Factory Park Building Agreement

Last update date April 1, 2024

Image of the district where prior consultation is requested
Preliminary consultation request district map (including building agreement area)

Prior consultation request district Site excluded from prior consultation request district

  • Prior consultation request If there is a building plan on the site in the area, please contact the Steering Committee in advance.
  • Please contact the Urban Development Bureau Minatomirai / Toshin Nagawa Coastal Promotion Division (045-671-3857) for contact information of the Steering Committee.
  • Please note that for adjacent land, we may join a building agreement in the future.
  • Overview of Restrictions (Excerpt from Agreement)
    (Use)
    Article 6 Buildings in the agreement area shall be used for the purposes listed in the following items, and shall conform to the "Ordinance on Regulations on Buildings in Branch Areas in Yokohama Port Harbor Area" or the mayor based on the ordinance Must be specifically recognized.
    (1) A company engaged in research and development-type manufacturing, facilities for research or production.
    (2) Bioindustry and bioindustry support industries for research or production purposes
    (Main Structure)
    Article 7 The main structural parts of the building shall be made of non-combustible materials. Provided, however, that this shall not apply to storerooms and other attached buildings whose total area of the building is within 20 square meters.
    (site)
    Article 8 On the site of the building, green spaces must be set up according to the standards listed in the following items, and they must work to manage them well.
    (1) Depending on the area of the site of the building, a green space of the area of the following ratio shall be installed.
    Oh, when area of site of building is more than 2,000 square meters, more than 20/100 of the area
    When area of site of i building is less than 2,000 square meters, and more than 1,000 square meters, more than 17/100 of the area
    If the area of the site of the building is less than 1,000 square meters, more than 10/100 of the area
    (2) Road where site of building contacts (limited to thing in agreement area. The same shall apply hereinafter. ) And the area shown in the area map must be a green zone. Provided, however, that this shall not apply to the approach road to the site. In addition, the green area set up in accordance with the provisions of this item shall be included in the green area of the preceding item.
    2. Those that can be installed in the green space shown in the preceding paragraph shall be as follows.
    (1) Gate wall, gate
    (2) Monument
    (3) National flag and company flag tower
    (4) Sewage manholes, water and gas facilities
    (5) Telephone pole
    (6) Streetlights
    (7) Signboards for the company name of the location company with a site area of 2 square meters or less for installation
    (8) Similar to the preceding items, those that have been approved by the Steering Committee stipulated in Article 12 as those that can be installed in green spaces.
    3 Those installed in accordance with the provisions of the preceding paragraph shall be included in the green space of Paragraph 1, Item 1.
    When installing a fence on the 4 road boundary side, it shall be provided on the site side along the green belt shown in the area map.
    (Location of exterior walls, etc. of buildings)
    Article 9 The distance from the outer wall of the building or the surface of the pillar in place of this to the road boundary shall be at least 3 meters for a width of 11 meters road, and at least 1 meter for other roads and corner cuts. Must.
    (Design)
    Article 10 The design of the building must strive to harmonize with the surrounding environment. .
    (Pollution prevention equipment)
    Article 11 Necessary facilities shall be provided on the premises to prevent pollution caused by noise, vibration, sewage, waste liquid, smoke, dust, gas, odor, etc.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Development Bureau Central Revitalization Promotion Department Minatomirai and Toshin Nagawa Coastal Promotion Division

Telephone: 045-671-3857

Telephone: 045-671-3857

Fax: 045-651-3164

Email address: tb-mmhigashikanarin@city.yokohama.jp

Return to the previous page

Page ID: 697-729-812

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews