Menu

Close

Here's the text.

Daikoku-cho Industrial Park Building Agreement

Last Updated April 1, 2024

Image of the district where prior consultation is requested
Preliminary consultation request district map (including building agreement area)

Prior consultation request district Site excluded from prior consultation request district

  • Prior consultation request If there is a building plan on the site in the area, please contact the Steering Committee in advance.
  • Please contact the Urban Development Bureau Minatomirai / Toshin Nagawa Coastal Promotion Division (045-671-3857) for contact information of the Steering Committee.
  • Please note that for adjacent land, we may join a building agreement in the future.
  • Authorized Building Agreement Area Map (PDF: 62KB)
    Detailed map of the building agreement area and adjacent land (land for those who do not agree with the agreement)
  • Building agreement (PDF: 179KB)
    ※Please be sure to check with each steering committee regarding the handling of agreement standards.
  • Overview of Restrictions (Excerpt from Agreement)
    (structure)
    Article 6 The main structural part of the building shall be made of non-combustible materials such as steel structures and reinforced concrete structures. Provided, however, that this shall not apply to storerooms and other attached buildings whose total area of the building is within 20 m2.
    (Retreatment of exterior walls)
    Article 7 The distance from the outer wall of the building or the pillar in place of this to the road boundary shall be 10 m or more facing the city road Oguro Line, and 5 m or more facing other roads.
    (Building equipment)
    Article 8 Equipment necessary to prevent pollution caused by noise, vibration, sewage, waste liquid, soot, dust, gas, odor, etc. shall be provided on the site.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Development Bureau Central Revitalization Promotion Department Minatomirai and Toshin Nagawa Coastal Promotion Division

Telephone: 045-671-3857

Telephone: 045-671-3857

Fax: 045-651-3164

Email address: tb-mmhigashikanarin@city.yokohama.jp

Return to the previous page

Page ID: 543-054-367

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews