Menu

Close

Here's the text.

Totsuka Station West Exit 3rd district

Last update date November 7, 2022

Current Status and Issues ・Policy of District Planning ・Town development plan ・Totsuka Station Area Maintenance Project ・About city-owned land utilization

Notice

Outline of district

Totsuka Station West Exit District 3 is located about 200 meters southwest of JR and Yokohama Municipal Subway Totsuka Station. It is positioned in the "Urban Planning Master Plan and Totsuka Ward Plan" aims to accumulate diverse functions such as business, commerce and culture.
A shopping district is formed around Asahicho Street, which connects Totsuka Station, and is adjacent to the Kashiogawa Promenade, which is popular as a walking space in the area, and the second-class urban redevelopment project area in West Exit No. 1 District of Totsuka Station.
From such location conditions, we will make the most of the charm of the shopping district, create a friendly and lively neighborhood, improve traffic access to connect to Totsuka Station and its surroundings, and provide a comfortable and safe walking space. For the purpose of creating attractive cityscapes, we are promoting town development by city planning.

Image of West Exit, Totsuka Station (February 2012)
Overview of West Exit Totsuka Station (February 2012)

District 3


About 50 years have passed since the city planning decision of the land readjustment project in 1962, the project has not been started, and the level of infrastructure maintenance is lower than in the surrounding area, There are issues in disaster prevention due to In addition, aging buildings and vacant stores are conspicuous due to recent changes in social conditions and development around the district.
Therefore, based on the status of maintenance of the urban infrastructure and the maintenance method, the land readjustment project enforcement area was reviewed, and the land readjustment project enforcement area was canceled on March 25, 2009 to promote town development utilizing the city planning. We decide city planning.

Totsuka Station Area Urban Development Project Area Map(Image: 236KB)
Click on the figure to enlarge it.

Details of decision and change of area
Details of decision and change of area
Type II Urban Redevelopment Project in West Exit District 1 Totsuka Station
H6.10Area based on city planning decision
Central Land Readjustment Project in front of Tozuka Station
S37.3Initial area based on city planning decision
S54.6Deleted part due to city planning change
H6.10Deleted part due to city planning change
H14.3Transferred part due to city planning change
Totsuka Station West Exit District Third District Plan
H21.3Transferred portion by city planning decision

Land Use Policy

  • Utilizing existing commercial agglomeration, we will aim to form a harmonious urban area where commercial functions and functions such as business and housing coexist.
  • The roadside along Asahicho Street restricts the use of houses in low-rise buildings and ensures continuity of bustle.

Development policy for district facilities

  • We are planning a division road A connecting National Highway No. 1 and Totsuka Station.
  • We connect division road B to division road A and plan improvement of vehicle access to this area.
  • For the northern part of Asahicho Street and Library Street, we will maintain a community zone with a pedestrian coexistence function.

Maintenance policy such as buildings

  • We limit use of building and limit form design such as buildings.

Policy of District Planning(Image: 237KB)
Click on the figure to enlarge it.



Legend
Area of city planning and
District maintenance planning area
The ground
Ward
Ghost
Installation
For
Position
Place
Divided roadBlocked road A
・Width 9-11m wide
・Extended about 360m
Blocked road B
・7m wide
・Extended about 200m
Community
Zone
Asahicho Street North
・6m wide
・Extended about 60m
Library Street north
・4.5m wide
・Extended about 60m

※When we perform construction of building, construction of public establishment, change of use such as buildings, change of form or design such as buildings, change of division character of land in area of this district, to Yokohama City Notification is necessary.

In Yokohama-shi, as town development plan, we establish main road width about road except district facility and ask for retreat (setback) at the time of rebuilding.

Town development plan(Image: 117KB)
Click on the figure to enlarge it.



In the third district adjacent to the Totsuka Station West Exit No. 1 District Type 2 Urban Redevelopment Project, we are promoting the development of roads (tentative name: outer roads) that form the framework of the area, and the Kashio River Promenade.

[Business Overview]
Business NameTotsuka Station Area Maintenance Project
Effective periodFY16-8 (planned)
EnforcerYokohama-shi
Operating expensesApprox. 1.5 billion yen
District facilitiesBlocked road AAbout 370 meters in length
Width 9 to 11 meters
Blocked road BAbout 210 meters in length
7 meters wide
Conditions before and after maintenance
Before maintenance

Image before maintenance

Image before maintenance (Road B)


 

Arrow


After maintenance

Image after maintenance

Image after maintenance (Road B)


 About utilization of municipal ownership land in the third district, proposal book (PDF: 1,510KB) is submitted in 2013 from "Yokohama-shi Totsuka Station West Exit third district municipal land utilization study meeting" led by local representative Was.
 After that, we talked with private companies (PDF: 341KB) for the purpose of recruiting businesses for the purpose of solving local issues (realizing the contents of the proposals), and based on the results, We carried out opinion solicitation (PDF: 208KB).
 In 2015, the prospective business was determined by a problem-solving type open call for participants (PDF: 1,446KB), and maintenance was completed in 2021.

About examination of municipal ownership land utilization(Image: 62KB)
Click on the figure to enlarge it.



Overview
 Summary of municipal land subject to consideration
 NameArea (m2)Restricted Areas
Old bus centerApprox. 1,420Commercial area
Next to the old bus centerAbout 280Commercial area
Provisional bicycle parking lotsApprox. 840Neighboring commercial areas

Status after maintenance
Before maintenance

①Old bus center

①Aerial photograph of the old bus center


②Next to the old bus center

②Photo next to the old bus center


③Provisional bicycle parking lots

③Photo of Interim bicycle parking lots

 

Downward arrow

Same left

After maintenance

Airline after maintenance of the old bus center

After maintenance of the old bus center

After parking lot maintenance




 

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Urban Development Division, Urban Development Bureau Urban Development Department

Phone: 045-671-4009

Phone: 045-671-4009

Fax: 045-664-7694

Email address: tb-seibisuishin@city.yokohama.jp

Return to the previous page

Page ID: 964-599-431

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews