Menu

Close

Here's the text.

West Exit District 3 of Totsuka Station

Last Updated November 7, 2022

Current status and issues of the district ・Policy for District Planning ・Town development plan ・Totsuka Station Area Maintenance Project ・About municipal ownership land utilization

Notice

Overview of the District

Totsuka Station West Exit District 3 is located approximately 200 meters southwest of JR and Yokohama Municipal Subway Totsuka Station, and is positioned in the area around Totsuka Station, which aims to integrate various functions such as business, commerce and culture under the City Planning Master Plan and Totsuka Ward Plan.
A shopping street is formed around Asahicho Street, which connects to Totsuka Station, and is adjacent to the Kashio River Promenade, which is popular as a local walking space, and the Totsuka Station West Exit Type 1 Urban Redevelopment Project Area.
Under these location conditions, we will make the most of the charm of the shopping district, create a friendly and lively neighborhood, improve traffic access to connect with Totsuka Station and its surroundings, and attractive with comfortable and safe walking space. For the purpose of creating an attractive cityscape, we are promoting town development based on city planning.

Image of West Exit, Totsuka Station (February 2012)
West Exit View of Totsuka Station (February 2012)

District 3


In this area, about 50 years have passed since the project was not started since the city planning decision of the land readjustment project in 1962, and the level of infrastructure development is lower than that of the surrounding area, There is a problem in disaster prevention due to houses. In addition, aging buildings and vacant stores are conspicuous due to changes in social conditions in recent years and development around the district.
Therefore, based on the maintenance status of urban infrastructure and the maintenance method, the land readjustment project enforcement area was canceled on March 25, 2009 to review the land readjustment project enforcement area and promote town development utilizing city planning. We decide city planning.

Totsuka Station Area Urban Development Project Area Map(Image: 236KB)
Click the figure to enlarge it.

Determination and Change of Area
Determination and Change of Area
Totsuka Station West Exit Type 1 Urban Redevelopment Project
H6.10Area based on city planning decision
Tozuka Ekimae District Central Land Readjustment Project
S37.3Initial area based on city planning decision
S54.6Deleted portion due to city planning change
H6.10Deleted portion due to city planning change
H14.3Transfer part due to city planning change
Totsuka Station West Exit District 3 District Planning
H21.3Transfer part based on city planning decision

Land Use Policy

  • Utilizing existing commercial agglomeration, we will aim to create a harmonious urban area where commercial functions and functions such as business and housing coexist.
  • The roadside of Asahicho-dori restricts the use of houses in the low-rise buildings and ensures the continuity of bustle.

Development policy for district facilities

  • We are planning a division road A that connects National Route 1 and Totsuka Station.
  • We connect division road B to division road A and plan improvement of vehicle access to this area.
  • For the northern part of Asahicho Street and Library Street, we will maintain a community zone with a pedestrian coexistence function.

Maintenance policy for buildings, etc.

  • Restrictions on the use of buildings and restrictions on form designs such as buildings.

Policy for District Planning(Image: 237KB)
Click the figure to enlarge it.



Legend
Area of city planning and
District maintenance plan area
Land
Ward
Applied
Set up
No
Rank
HOME
Divided roadsDivided road A
・Width 9 to 11m
・Approximately 360m in length
Divided road B
・Width 7m
・Approximately 200m in length
Community
Zone
Asahicho-dori north
・Width 6m
・Approximately 60m in length
North of library street
・Width 4.5m
・Approximately 60m in length

※When we perform building of building, construction of public establishment, change of use such as buildings, change of form or design such as buildings, change of parcel trait of land in area of this district, to Yokohama-shi Notification is required.

In Yokohama City, as a town development plan, the main road width is determined for roads other than district facilities, and we ask for retreat (setback) at the time of rebuilding.

Town development plan(Image: 117KB)
Click the figure to enlarge it.



In the third district adjacent to the Type 2 Urban Redevelopment Project in the West Exit District 1 of Totsuka Station, we are promoting the development of roads that serve as regional frameworks (provisional name: outer roads) and the development of the Kashio River Promenade integrally with the outer roads.

Overview of Business
Business nameTotsuka Station Area Maintenance Project
Effective periodFY2016-Reiwa 8 (planned)
EnforcerYokohama-shi
Operating expensesApprox. ¥1.5 billion
District facilitiesDivided road AApproximately 370 meters in length
Width 9 to 11 meters
Divided road BApproximately 210 meters in length
Width 7 meters
Status before and after maintenance
Before maintenance

Image before maintenance

Image before maintenance (Road B)


 

Arrow


After maintenance

Images after maintenance

Image after maintenance (Road B)


 About utilization of municipal ownership land in the third district, proposal book (PDF: 1,510KB) was submitted in 2013 from "Totsuka Station West Exit third district municipal land utilization examination meeting" led by local representative Was.
 After that, we talked with private companies (PDF: 341KB) for the purpose of recruiting businesses for the purpose of solving local issues (realization of proposals), and about the business policy (draft) created based on the results , Opinion solicitation (PDF: 208KB) was implemented.
 In 2015, the project planner was determined by a problem-solving open call for participants (PDF: 1,446KB), and maintenance was completed in 2021.

About examination of municipal ownership land utilization(Image: 62KB)
Click the figure to enlarge it.



Overview
 Overview of municipal land to be considered
 NameArea (m2)Restricted areas
Old bus centerApprox. 1,420Commercial areas
Next to the old bus centerAbout 280Commercial areas
Provisional bicycle parking lotsApprox. 840Neighboring commercial areas

Status after maintenance
Before maintenance

①Old bus center

①Aerial photograph of the old bus center


②Next to the old bus center

②Photo next to the old bus center


③Provisional bicycle parking lots

③Photographs of provisional bicycle parking lots

 

Downward arrow

The same left

After maintenance

After the maintenance of the old bus center

After maintenance of the old bus center

After parking lot maintenance




 

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Development Promotion Division, Urban Development Bureau Urban Development Department

Telephone: 045-671-4009

Telephone: 045-671-4009

Fax: 045-664-7694

Email address: tb-seibisuishin@city.yokohama.lg.jp

Return to the previous page

Page ID: 964-599-431

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews