- About sewerage system usage fee
- General sewage system usage fee
- Public bath sewage system usage fee
- Additional sewerage fee
- Reduction Certification System
- When draining well water, rainwater utilization water, building spring water, etc.
- Temporary use of public sewers
- When not using public sewers (sewage pipes, confluence pipes)
- When starting the use of public sewers
- Penalties
About sewerage system usage fee
The sewerage fee is borne by everyone who uses the public sewerage as an expense to clean sewage.
Normally, the amount of water used by meter reading of the water meter is calculated as the amount of sewage discharged, and the sewerage usage fee is calculated.
In addition, when draining well water, rainwater use water, building spring water, and rainwater / spring water associated with civil engineering / construction work to the public sewer, it is necessary to pay the sewerage usage fee.
General sewage system usage fee
It is the fee for use pertaining to sewage of home and establishment using public sewer.
<Example of calculation>
Sewerage usage fee (excluding tax) in case of discharge (2 months) 30m3
118 yen (amount per 1m3 of 21 to 40m3) x 30m3-1,020 yen = 2,520 yen
Emissions (2 months) | Per 1m3 | Calculation formula |
---|---|---|
0~16㎥ | - | 1,260 yen (basic amount) |
17~20㎥ | 20 yen | 20 yen x water volume +940 yen |
21~40㎥ | 118 yen | 118 yen x water volume -1,020 yen |
41~60㎥ | 173 yen | 173 yen x water volume -3,220 yen |
61~100㎥ | 234 yen | 234 yen x water volume -6,880 yen |
101~200㎥ | 264 yen | 264 yen x water volume -9,880 yen |
201~400㎥ | 299 yen | 299 yen x water volume -16,880 yen |
401~1,000㎥ | 341 yen | 341 yen x water volume -33,680 yen |
1,001~2,000㎥ | 389 yen | 389 yen x water volume -81,680 yen |
2,001~4,000㎥ | 416 yen | 416 yen x water volume -135,680 yen |
4,001㎥~ | 472 yen | 472 yen x water volume -359,680 yen |
Emissions (1 month) | Per 1m3 | Calculation formula |
---|---|---|
0~8㎥ | - | 630 yen (basic amount) |
9~10㎥ | 20 yen | 20 yen x water volume + 470 yen |
11~20㎥ | 118 yen | 118 yen x water volume -510 yen |
21~30㎥ | 173 yen | 173 yen x water volume -1,610 yen |
31~50㎥ | 234 yen | 234 yen x water volume -3,440 yen |
51~100㎥ | 264 yen | 264 yen x water volume -4,940 yen |
101~200㎥ | 299 yen | 299 yen x water volume -8,440 yen |
201~500㎥ | 341 yen | 341 yen x water volume -16,840 yen |
501~1,000㎥ | 389 yen | 389 yen x water volume -40,840 yen |
1,001~2,000㎥ | 416 yen | 416 yen x water volume -67,840 yen |
2,001㎥~ | 472 yen | 472 yen x water volume -179,840 yen |
※This is the amount excluding tax. (The consumption tax and local consumption tax equivalent will be added separately to this amount.)
Public bath sewage system usage fee
Based on the provisions of Article 4 of the Price Control Ordinance, this is the usage fee for sewage from public baths subject to the control amount of bathing fees.
Emissions |
Amount |
---|---|
Per 1 m3 of emissions per month | 11 yen |
※This is the amount excluding tax. (The consumption tax and local consumption tax equivalent will be added separately to this amount.)
Additional sewerage fee
It is applied to establishments that discharge a certain concentration of wastewater, and is a water quality usage fee to be paid in addition to the general sewage sewerage usage fee.
In addition, the fee for use is calculated based on the sewage concentration (F).
Subject of additional sewerage usage fee and calculation method
Subject to additional sewerage usage fee
Wastewater
Business sites with emissions exceeding 500m3 per month
Water quality
- BOD: Excess amount when exceeding 300 mg / l
- SS ・ ・ ・ ・ ・ ・ ・ ・ Excess amount when exceeding 300 mg / l
- Normal hexane extract content (limited to the content of flora and fauna oils and fats): Excess amount when it exceeds 30 mg / l
Calculation method of additional sewerage usage fee
Calculation of "sewage concentration"
F=B+1.7S+1.4N
F: Concentration of sewage
B: Excess amount when the BOD of sewage exceeds 300 mg / l
S: Excess amount when the SS of sewage exceeds 300 mg / l
N: Excess when the Normal hexane extract content of sewage exceeds 30 mg / l (limited to animal and vegetable oils and fats) exceeds 30 mg / l
Additional sewerage usage fee unit price
Concentration of sewage (F) | Per 1m3 | Concentration of sewage (F) | Per 1m3 |
---|---|---|---|
Up to 500 | 40 yen | More than 4,000 to 4,500 | 700 yen |
More than 500 up to 1,000 | 125 yen | More than 4,500 to 5,000 | 785 yen |
More than 1,000 to 1,500 | 205 yen | More than 5,000 to 5,500 | 865 yen |
More than 1,500 to 2,000 | 290 yen | More than 5,500 to 6,000 | 950 yen |
More than 2,000 to 2,500 | 370 yen | More than 6,000 to 6,500 | 1,030 yen |
More than 2,500 to 3,000 | 455 yen | More than 6,500 to 7,000 | 1,115 yen |
More than 3,000 to 3,500 | 535 yen | From 7,000 to 7,500 | 1,195 yen |
More than 3,500 to 4,000 | 620 yen | More than 7,500 | 1,280 yen |
※This is the amount excluding tax. (The consumption tax and local consumption tax equivalent will be added separately to this amount.)
Reduction Certification System
Normally, the sewerage usage fee is calculated using the amount of water used as the amount of sewage discharged, but if the amount of water used and the amount of sewage discharged are significantly different due to business activities of factories and offices, etc. You may be able to reduce the amount of sewage discharge.
There are certain conditions to reduce the amount of wastewater discharged. For detailed contents and requirements, please check the "Information on Reduction Certification System" and consult with the General Affairs Department Accounting Section of the Sewerage River Bureau before reporting.
In the case of a declaration without prior consultation, we may not be able to accept it.
(Reference) Yokohama-shi sewer regulations Article 19 Clause 2, Clause 3 (outside site)
Guidance of weight loss certification system (PDF: 237KB)
Sewage discharge certification report (Excel: 15KB)
Sewage discharge calculation sheet (Excel: 62KB)
Reference examples such as drawings (PDF: 2,073KB)
Replenishment / Water Consumption Report after weight loss certification (Excel: 30KB)
When draining well water, rainwater utilization water, building spring water, etc.
When discharging well water (including groundwater such as hot spring water), rainwater reused in toilets, and spring water (building spring water) from underground structures to public sewers, it is necessary to apply for the “Public Sewer Use registration form” and pay the sewerage usage fee. Please be sure to contact the Accounting Section of the General Affairs Department River Bureau.
Public sewer use start (cancellation, abolition) registration form (Excel: 18KB)
Sewage discharge certification report (Excel: 15KB)
Water consumption report after certification (Excel: 44KB)
Guidance of sewer usage fee calculation basics change report after authorization (Excel: 15KB)
Temporary use of public sewers
Procedures for temporary use of public sewer and reception desks such as applications are as follows.
- About application for permission of temporary use and completion report
Public Works Office, each district
- About drainage report by temporary use and sewerage usage fee
General Affairs Department Accounting Division, River Bureau
Procedures such as temporary use permission application of public sewer
When we use public sewer temporarily to perform the following drainage, it is necessary to submit "public sewer temporary use permission application" beforehand to each ward Public Works Office having jurisdiction over place to use sewer and receive permission . Please refer to each ward Public Works Office about form of permission application.
- Spring water, rainwater, construction drainage associated with civil engineering, construction work, etc. (when spring water and rainwater are equipped with a kettle and pump is used)
- Drainage from temporary toilets and hand-washing areas installed in temporary offices
- Accumulated water from caretaker holes for telegraph telephone, electricity, gas, etc.
- Other wastewater from construction
- Public sewer temporary use permission application
- Estimated Emissions Statement
- Public sewer temporary drainage completion report
(Reference) Yokohama-shi sewer regulations Article 17 Clause 3 (outside site)
Procedures for reporting the amount of wastewater required for temporary use of public sewers
When reporting the amount of wastewater, please use the following form and send it to the General Affairs Department Accounting Section of the Sewerage River Bureau by e-mail or fax by the specified date every month. If you have any questions about how to fill out the report or the sewerage fee, please contact the General Affairs Department Accounting Section of the Sewerage River Bureau.
Public sewer temporary use report (including entry example) (Excel: 34KB)
When not using public sewers (sewage pipes, confluence pipes)
If tap water is used and the used water does not flow into the public sewer (sewage pipe, confluence pipe), it may not be subject to collection of sewerage usage fees. For more information, please contact General Affairs Department Accounting Division, Sewerage River Bureau.
Separated sewer and combined sewer
In the public sewerage system in Yokohama City, rainwater from rainfall and sewage discharged from homes etc. flow into separate drain pipes (rainwater pipes, sewage pipes), and only sewage is treated at the water reclamation center. There is a "junction sewer" in which rainwater and sewage flow into one drainage pipe (junction pipe) and all are treated at the water reclamation center.
If the used water flows into the sewage pipe or confluence pipe even a little, a sewerage fee will be charged.
There are rainwater pipes and sewage pipes, and only sewage is treated at the water reclamation center.
Rainwater and sewage flow into the confluence pipe and are all treated at the water reclamation center.
Water taps that may not be using public sewers
- Water faucets for temporary construction work
- Water faucet for construction
- Water taps in fields, etc.
For taps that meet the following conditions, those that meet the following conditions may not be eligible for sewerage usage fees.
Areas that use diverted sewers
- It is not paved, and all water such as watering penetrates into the ground.
- Although paved, water such as watering flows into rainwater pipes from gutters.
※In areas where diverted sewers are used, it is necessary not to flow into sewage pipes.
Areas that use combined sewers
- It is not paved, and all water such as watering penetrates into the ground.
※In areas where the combined sewer is used, it is necessary not to flow into the confluence pipe.
From the public sewer ledger map "Daichan Map" (outside site) about whether the tap used belongs to the area where the diverted sewer system is used or the area where the combined sewer system is used. You.
When starting the use of public sewers (sewage pipes, confluence pipes)
In the following cases, it is necessary to submit "public sewer use start registration form".
- When abolishing septic tanks and toilets and connecting to public sewers (sewage pipes, confluence pipes)
- When diverting a tap (water tap, etc.) that is not connected to the public sewer (sewage pipe, confluence pipe) and connecting to the public sewer (sewage pipe, confluence pipe)
However, when a tap is newly established and connected to a public sewer (sewage pipe, confluence pipe), it is assumed that there was a notification of "Public sewer use start registration form" according to the provisions of Article 17, Paragraph 2 of the Yokohama City Sewerage Ordinance. You do not need to submit it.
Public sewer use start (cancellation, abolition) registration form (Excel: 12KB)
Please be careful!
- If a public sewer connection construction applicant or a sewer user does not submit a "public sewer use start registration form", he / she may be fined 50,000 yen or less.
- Construction such as new construction of drainage facilities, remodeling of toilets to flush toilets, etc. are designated by the mayor“Yokohama City Drainage Equipment Designated Construction Shop”Otherwise, you can't do it. For detailsPage "Confirmation of drainage plans"Please check it out.
(Reference) Yokohama-shi sewer regulations Article 45 (outside site)
This report is different from the notification of the start of use of public sewerage based on Article 11-2 of the Sewerage Law, which is necessary when removing sewage of a certain amount of water and water quality or when setting up specific facilities. About notice of use of public sewer based on law, please see page of "to all of factories, business establishments using public sewer: duty of report" in detail.
Penalties
Anyone who has escaped the collection of sewerage usage fees due to fraud or other misconduct will be punished with a fine of less than five times the amount exempted from collection.
(Reference) Yokohama-shi sewer regulations Article 46 (outside site)
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
General Affairs Department Accounting Division, River Bureau
Telephone: 045-671-2826
Telephone: 045-671-2826
Fax: 045-663-0132
Email address: gk-shiyou@city.yokohama.lg.jp
Page ID: 738-466-533