Menu

Close

Here's the text.

71.Post-survey results report on the Sotetsu-Tokyu Direct Line (Part 8 under construction)

Last Updated April 15, 2022

Post-Survey Results Report (Part 8 under construction)

Please see the following PDF file for the Sotetsu / Tokyu Direct Line Ex-post Survey Results Report (Part 8 during construction).
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.

Main part

  • Chapter 1 Plans for Target Businesses
    • 1.1 Name of business operator, name of representative and location of main office
    • 1.2 Name of the target business
    • 1.3 Type and scale of the target business
    • 1.4 Target project implementation area
    • 1.5 Overview of the Target Business
    • 1.6 The conductor and trustee of the post-survey
  • Chapter 2 Results of Post-Survey
    • 2.1 Items and methods of post-survey described in the post-survey plan
    • 2.2 Period and timing of post-survey
    • 2.3 Overview of the results of the post-survey
    • 2.4 Results of ex-post investigation
      • 2.4.1 Land subsidence
      • 2.4.2 Water level of groundwater
      • 2.4.3 By-products associated with construction work
      • 2.4.4 Implementation status of environmental conservation measures (out of post-survey items)
    • 2.5 Consideration of post-survey results
      • 2.5.1 Land subsidence
      • 2.5.2 Water level of groundwater
      • 2.5.3 By-products associated with construction work
    • 2.6 If new measures are taken to protect the environment, the results of such measures, predictions, evaluations, or results of ex-post investigation
      • 2.6.1 Land subsidence
      • 2.6.2 Water level of groundwater
  • Chapter 3 Response to Opinions submitted in the Environmental Impact Assessment Procedure

Remarks

  • The map used in the PDF file is a copy of the electronic topographic map 25000 issued by the Geographical Survey Institute with the approval of the Director. (Approved by the Geospatial Information Authority of Japan based on the Survey Method (Reproduction) R3JHf348)
  • If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.

Status of Procedures

For the status of the procedure of this project, please refer to “71. Sotetsu / Tokyu Direct Line Environmental Impact Assessment Procedure”.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau

Telephone: 045-671-2495

Telephone: 045-671-2495

Fax: 045-663-7831

Email address: mk-eikyohyoka@city.yokohama.lg.jp

Return to the previous page

Page ID: 640-496-774

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews