- Yokohama-shi Top Page
- Living and Procedures
- Community Development and Environment
- Environmental Conservation
- Environmental Conservation Initiatives
- Environmental assessment
- Business in Yokohama City
- 71.Procedures for environmental impact assessment on the Sotetsu and Tokyu Direct Lines
- 71.Post-survey results report on the Sotetsu-Tokyu Direct Line (Part 6 under construction)
Here's the text.
71.Post-survey results report on the Sotetsu-Tokyu Direct Line (Part 6 under construction)
Last Updated March 25, 2020
Post-Survey Results Report (Part 6 under construction)
Please see the following PDF file for the Sotetsu / Tokyu Direct Line Ex-post Survey Results Report (Part 6 during construction).
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Main part
Sotetsu / Tokyu Direct Line Post-Survey Results Report (Part 6 during construction) (PDF: 3,806KB)
- Chapter 1 Plans for Target Businesses
- 1.1 Name of business operator, name of representative and location of main office
- 1.2 Name of the target business
- 1.3 Type and scale of the target business
- 1.4 Target project implementation area
- 1.5 Overview of the Target Business
- 1.6 The conductor and trustee of the post-survey
- Chapter 2 Results of Post-Survey
- 2.1 Items and methods of post-survey described in the post-survey plan
- 2.2 Period and timing of post-survey
- 2.3 Overview of the results of the post-survey
- 2.4 Results of ex-post investigation
- 2.4.1 Land subsidence
- 2.4.2 Water level of groundwater
- 2.4.3 By-products associated with construction work
- 2.4.4 Implementation status of environmental conservation measures (out of post-survey items)
- 2.5 Consideration of post-survey results
- 2.5.1 Land subsidence
- 2.5.2 Water level of groundwater
- 2.5.3 By-products associated with construction work
- 2.6 If new measures are taken to protect the environment, the results of such measures, predictions, evaluations, or results of ex-post investigation
- 2.6.1 Land subsidence
- 2.6.2 Water level of groundwater
- Chapter 3 Response to Opinions submitted in the Environmental Impact Assessment Procedure
Remarks
- The map used in the PDF file is a copy of the electronic topographic map 25000 issued by the Geographical Survey Institute with the approval of the Director. (Approval No. 28 Jogaku, No. 689)
- If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.
Status of Procedures
For the status of the procedure of this project, please refer to “71. Sotetsu / Tokyu Direct Line Environmental Impact Assessment Procedure”.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 916-417-227