71.Post-survey results report on the Sotetsu-Tokyu Direct Line (Part 1 under construction)
Last Updated February 28, 2019
Post-Survey Results Report (Part 1 during construction)
Please see the following PDF file for the Sotetsu / Tokyu Direct Line Ex-post Survey Results Report (Part 1 during construction).
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Main part
Sotetsu / Tokyu Direct Line Post-Survey Results Report (Part 1 during construction) (PDF: 1,659KB)
- Chapter 1 Plans for Target Businesses
- Chapter 2 Results of Post-Survey
- 2.1 Items and methods of post-survey described in the post-survey plan
- 2.2 Period and timing of post-survey
- 2.3 Overview of the results of the post-survey
- 2.4 Results of ex-post investigation
- 2.4.1 Land subsidence
- 2.4.2 Water elephants (underground water level and flow rate of spring water)
- 2.4.3 Waste and generated soil
- 2.5 Forecast results, environmental conservation targets and measures for environmental conservation
- 2.5.1 Land subsidence
- 2.5.2 Water elephants (underground water level and flow rate of spring water)
- 2.5.3 Waste and generated soil
- 2.5.4 Implementation status for environmental conservation (out of post-survey items)
- 2.6 Consideration of post-survey results
- 2.6.1 Land subsidence
- 2.6.2 Water elephants (underground water level and flow rate of spring water)
- 2.6.3 Waste and generated soil
- 2.7 If new measures are taken to protect the environment, the results of such measures, predictions, evaluations, or results of ex-post investigation
- Chapter 3 Response to Opinions submitted in the Environmental Impact Assessment Procedure
Status of Procedures
For the status of the procedure of this project, please refer to “71. Sotetsu / Tokyu Direct Line Environmental Impact Assessment Procedure”.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 505-440-824