- 103.Consideration of Mayor's opinion on the Yokohama BAY Factory Project, Sanyu Plant Service Co., Ltd.
Here's the text.
103.Consideration of Mayor's opinion on the Yokohama BAY Factory Project, Sanyu Plant Service Co., Ltd.
Last Updated January 25, 2024
Consideration Mayor's Opinion Statement
Please see the following PDF file for consideration mayor opinion statement pertaining to Sanyu Plant Service Co., Ltd. Yokohama BAY Factory Project.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Consideration Mayor's Opinion Statement
Main part
Main part (batch version) (PDF: 4,498KB)
- Cover, First, Table of Contents
- Chapter 1 Overview of Business Plans
- 1.1 Overview of Business Plan
- 1.2 Purpose and necessity of the project
- 1.3 Contents of Business Plan
- (1) Location and area of the planned site
- (2) Land Use Plan
- (3) Architectural Plan
- (4) Plant equipment plan
- (5) Water use plan
- (6) Operation plan
- (7) Greening plan
- (8) Carry-in/out vehicle plan
- (9) Waste treatment plan
- (10) Plans for disaster prevention, etc.
- (11) Construction plan
- (12) Business schedule plan
- (13) Background of the business and background of planning
- (14) Concept of Avoiding and Reducing Environmental Impacts
- Chapter 2 Contents of consideration based on consideration guidelines
- 2.1 Contents of consideration that we examined environmental information and consideration mayor statement of position comprehensively and changed
- 2.2 Overview of Environmental Information
- 2.3 Opinion of the mayor listed in consideration mayor statement of position and opinion of company
Materials
Document (batch version) (PDF: 17,494KB)
- Chapter 1 Copy of Mayor's Statement of Position
- Chapter 2, Class 2 Business Judgment Report
- 2.1 Approach to the criteria in Article 15, Paragraph 1 of the Yokohama City Environmental Impact Assessment Ordinance Enforcement Regulations
- 2.1.1 Dioxin concentrations in smoke-washed water at the current factory
- 2.1.2 Emissions and gas concentrations of exhaust gas at the current and new plants
- 2.1.3 Forecast of Air Quality
- 2.1.4 Consideration of liquefaction
- 2.1 Approach to the criteria in Article 15, Paragraph 1 of the Yokohama City Environmental Impact Assessment Ordinance Enforcement Regulations
Remarks
- The figure below the map posted in the PDF file was created by processing the 50,000th 1 topographic map, 25,000th 1 topographic map, electronic topographic map 25,000 and electronic topographic map (tile) issued by the Geographical Survey Institute. is. (Approval number R 3JHf 42)
- If a third party duplicates further, it must be approved by the Director of the Geographical Survey Institute.
Status of Procedures
Please refer to “103. Sanyu Plant Service Co., Ltd. Yokohama BAY Plant Project Environmental Impact Assessment Procedure” for the status of this project.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 616-979-998