- 103.Sanyu Plant Service Yokohama BAY Plant Project Environmental Impact Assessment Procedure
- 103.Plan stage consideration book for the Yokohama BAY Plant Project, Sanyu Plant Service Co., Ltd.
Here's the text.
103.Plan stage consideration book for the Yokohama BAY Plant Project, Sanyu Plant Service Co., Ltd.
Last Updated January 25, 2023
Plan Stage Consideration
Please see the following PDF file for the planning stage consideration book related to the Yokohama BAY Factory Project.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Plan Stage Consideration
Plan stage consideration book (lump version) (PDF: 25,136KB)
- Cover, First, Table of Contents
- Chapter 1 Overview of Business Plans
- 1.1 Overview of Business Plan
- 1.2 Purpose and necessity of the project
- 1.3 Contents of Business Plan
- (1) Location and area of the planned site
- (2) Land Use Plan
- (3) Architectural Plan
- (4) Plant equipment plan
- (5) Water use plan
- (6) Operation plan
- (7) Greening plan
- (8) Carry-in/out vehicle plan
- (9) Waste treatment plan
- (10) Plans for disaster prevention, etc.
- (11) Construction plan
- (12) Business schedule plan
- (13) Background of the business and background of planning
- (14) Concept of Avoiding and Reducing Environmental Impacts
- Chapter 2 Overview of Regions and Regional Characteristics
- 2.1 Setting of surveyed areas, etc.
- 2.2 Regional overview
- (1) Weather conditions
- (2) Topography, geology, and ground conditions
- (3) Water Cycle
- (4) Plants and Animals
- (5) Status of farmland
- (6) Population and Industry Situation
- (7) Land Use
- (8) Transportation and Transportation
- (9) Status of Public Facilities, etc.
- (10) Status of Cultural Properties, etc.
- (11) Pollution, etc.
- (12) Situation of Disasters
- (13) Status of Waste
- (14) Status of laws and regulations
- 2.3 Regional characteristics of surveyed areas, etc.
- (1) Overview
- (2) Environmental Characteristics by Item
- Chapter 3 Contents of consideration at the planning stage based on consideration guidelines
- Materials
- 1.Overview of High-level Plans
- 2.Glossary
Remarks
- The figure below the map posted in the PDF file was created by processing the 50,000th 1 topographic map, 25,000th 1 topographic map, electronic topographic map 25,000 and electronic topographic map (tile) issued by the Geographical Survey Institute. is. (Approval number R 3JHf 42)
- If a third party duplicates further, it must be approved by the Director of the Geographical Survey Institute.
Status of Procedures
Please refer to “103. Sanyu Plant Service Co., Ltd. Yokohama BAY Plant Project Environmental Impact Assessment Procedure” for the status of this project.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 814-551-472