Menu

Close

  1. Yokohama-shi Top Page
  2. Lifestyle and procedures
  3. Community Development and Environment
  4. Roads
  5. Planning, Planning, etc.
  6. Redevelopment of roads around Minato Odori Avenue and Yokohama Culture Gymnasium

Here's the text.

Redevelopment of roads around Minato Odori Avenue and Yokohama Culture Gymnasium

Last Updated March 22, 2023

Project outline of redevelopment of roads around Minato Odori Avenue and Yokohama Culture Gymnasium

In both the Kannai side area and the Seki outer area, large-scale facilities will continue to be located for the realization of "international industry-academia collaboration" and "sightseeing and attracting customers", and it is expected that the number of visitors will create further bustle in the area. . The "Minato Odori Avenue" and "Access Line to Yokohama Culture Gymnasium" facing these large-scale facilities are one continuous line, and improve the integrity between the Kannai area and the outside of the Kannai area, along with the green axis connecting Odori Park and Nihon Odori Avenue.
On the other hand, at present, the road is wide and parking on the street is conspicuous, the existing bicycle pedestrian path is narrow, and considering the future increase in visitors, pedestrian pools are not enough at intersections. . For this reason, the existing road space will be rehabilitated based on the roadside use situation, such as by narrowing the width of the roadway and expanding the pedestrian / bicycle traffic space, and strengthening and expanding the safe and comfortable pedestrian network. We will strive to create continuous bustle.
Business Overview (June 2022) (PDF: 2,668KB)

Scope of redevelopment of roads around Minato Odori Avenue and Yokohama Culture Gymnasium
Review of roads around Minato Odori Avenue and Yokohama Culture Gymnasium

①Conducting social experiments

<Fiscal Years 4/5>
Currently, we are conducting discussions on road utilization, organizing issues, and forming a road utilization main, on how to use it in the expanded sidewalk space in the future, mainly by roadside people.
In Reiwa 4 and 5 years of Reiwa, from September 26, 2022 to December 28, 2023, in order to set up a stagnant space at Kannai Station South Exit Plaza and conduct a demonstration experiment on road utilization with roadside people. During period, we carry out road utilization experiment "Mikke Minabun 2" until.
During the experiment period, we will also hold events in cooperation with people along the road, so please come and visit us. ※A kitchen car is scheduled to open.
Road utilization experiment "Mikkeru Minabun 2" (PDF: 1,968KB)
 [1st event: October 22nd (Sat), (Sun)] (PDF:535KB)
 [The 2nd event: December 5 (Mon.) to 11 (Sun)] (PDF:760KB)

<FY2020>
We conducted social experiments such as regulating a part of the roadway and expanding the sidewalk from November 9 to November 30, 2020, and verified the flow of people and cars and the utilization of roadsides. Thank you for your understanding and cooperation during the experimental period.
We have compiled the experiment results, so please download it below and see it.
About result of road utilization experiment "Mikkeru Minabun" (PDF: 941KB)

(Reference) Press release materials for the experiment

②Minabun NEWS

While listening to the opinions of roadside people and users, we inform you of the progress in the form of news in order to reflect it in the design as a fun street on foot.
The materials can be downloaded from the link below.

※ The FY2021 Road Utilization Experiment was canceled due to the extension of the state of emergency due to the spread of COVID-19.

③About local briefing session

A local briefing session was held on the following schedule.
The materials can be downloaded from the link below.

④Town development in the area around Kannai Station

We have formulated the town development policy for the area around Kannai Station, "Kannai Station Area Concept Plan" for the area around Kannai Station, and are promoting community development with the theme of "international industry-academia collaboration" and "tourism and attracting customers".
For more information, please refer to the link below.
Town development around Kannai Station

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

①About 3 and 4, Urban Development Bureau Regeneration Division

Phone: 045-671-3963

Phone: 045-671-3963

Fax: 045-664-3551

Email address: tb-tosai@city.yokohama.jp

②Urban Development Bureau Urban Design Office

Phone: 045-671-2023

Phone: 045-671-2023

Fax: 045-664-4539

Email address: tb-toshidesign@city.yokohama.jp

①Road and Highway Bureau Planning Division

Phone: 045-671-2779

Phone: 045-671-2779

Fax: 045-651-6527

Email address: do-kikaku@city.yokohama.jp

Return to the previous page

Page ID: 146-318-814

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews