The flushing work is carried out at a designated construction shop in Yokohama.

If drainage facilities are not installed based on laws and regulations, not only will the maintenance and management of public sewers be hindered, but everyone will also be damaged, so flushing work will be designated as drainage facilities in Yokohama City. You can only do it by a construction shop.

Drainage facilities designated construction shops are also introduced in the Yokohama City Pipe Works Cooperative (outside site). (Tel: 045-681-6631)

Meeting, quotation and contract

After receiving an explanation of the details of the construction, check the construction cost, construction time, whether or not subsidies or loans are used, etc. before contracting.

Examples of construction work

  • Installation of drainage pipes from drains in toilets, kitchens, bathrooms, etc.
  • Installation of rainwater pipes until rainwater connection
  • Collect, clean, disinfect, and backfill waste from septic tanks (toilet tanks)
  • Install a toilet bowl and a water tank, and piping the water supply pipe (in the case of a toilet)

From construction contract to payment

Flow diagram from construction contract to payment

Inquiries to this page

Kohoku Ward Port North Public Works Office

Telephone: 045-531-7361

Telephone: 045-531-7361

Fax: 045-531-9699

Email address: ko-doboku@city.yokohama.lg.jp

Return to the previous page

Page ID: 907-311-180

Menu of ward

  • LINE
  • Twitter
  • Facebook
  • YouTube