Operation of drainage facilities
Last Updated January 10, 2019
1 attached documents of application for confirmation of plans for drainage facilities
The books attached to the “Application for Confirmation of Drainage Equipment (Remodeling of Washing Toilet) Plan” submitted to the Public Works Office in each ward are as follows. In addition, about the details, please read "Yokohama-shi drainage equipment handbook (2006 revised version)" (P2-1, etc.).
(1) Based on the drainage area and the drainage population
Attachments | Scale | Category | ||
---|---|---|---|---|
Drainage population Less than 1,000 people | Drainage population More than 1,000 people | |||
Wastewater area Less than 400 square meters | Wastewater area More than 400 square meters Wastewater area Less than 1500 square meters | Wastewater area More than 1500 square meters | ||
A sketch of the neighborhood (Guide map) | Optionally (specify directions from nearby general landmarks (bus stops, bridges, "Koban" (police box), schools, etc.)) | Required | Required | Required |
Layout plan (floor plan) | In principle, at least 1/400 | Required | Required | Required |
Longitudinal section | The side is the same as the layout drawing. Vertical length is more than 10 times horizontal | Required | Required | Required |
Wastewater area Block split floor plan | According to the layout drawing. | Not required | Required | Required |
Calculation table for area, etc. | Not applicable | Not required | Required | Not required |
Flow rate table | Not applicable | Not required | Not required | Required |
(2) In case of installation of underground drainage tanks
(1) In addition to the classification, detailed structural drawings of the underground drainage tank (floor plan, longitudinal section)
(3) When the installation location is related to development activities, etc.
(1) In addition to the classification, a copy of the drainage area division floor plan attached at the time of consultation on development activities, etc.
2 Those that can omit the procedure for applying for confirmation of plans for drainage facilities, etc.
If any of the following applies, you do not need to apply for a plan confirmation.
- When adding or renovating drainage facilities less than 3 meters
However, construction work to convert the toilet into a flush toilet in the treatment area (hereinafter referred to as “wash toilet remodeling work”) In addition, expansion or renovation of drainage facilities associated with septic tank new construction, night soil septic tank abolition construction, abatement facility installation construction require a plan confirmation application. - When connecting existing drainage facilities temporarily with public sewerage works (including private road contracted sewerage works)
3 Installation category of application for confirmation of plans for drainage facilities, etc.
The installation categories of the plan confirmation application are as follows. In addition, about the details, please read Yokohama-shi drainage system handbook (P2-2) well.
Installation category (name) | Details of construction | ||
---|---|---|---|
1 | Drainage facilities New construction, expansion, renovation | New construction, expansion and renovation of drainage facilities (Limited to cases where new and remodeling of flush toilets, abolition and new construction of human waste septic tanks, installation of underground drainage tanks, abatement facilities, etc.) | |
2 | Remodeling of flush toilets | Work to convert the pumping toilet into a flush toilet and drainage work to be performed at the same time. | |
3 | Abolition of human waste septic tank | Drainage construction work associated with the construction of abolishing the human waste septic tank and releasing it directly | |
4 | New flush toilets | New construction of drainage facilities accompanying the construction of new flush toilets (only when there is no installation of underground drainage tanks, abatement facilities, etc.) | |
5 | New construction of septic tanks | Drainage construction associated with the construction of a new septic tank (limited to general sewerage with a dark end) | |
6 | Abatement facilities and others | Installation of abatement facilities | Based on the Sewerage Law (site of the Ministry of Land, Infrastructure, Transport and Tourism) (outside site) and the Yokohama City Sewerage Ordinance, drainage construction work to be performed at establishments that have specific facilities and abatement facilities or newly established establishments (the end of the water is public sewerage) Limited to.) |
New construction of underground drainage tanks | New construction of underground drainage tanks and drainage construction to be performed at the same time (limited to cases where the end of the drain is a public sewer or a general sewer in dark) | ||
New construction of flush toilets in areas using shared septic tanks | In housing complex, etc., drainage works associated with the construction of new flush toilets in areas with regional joint septic tanks (limited to public sewers or dark general sewers) |
4 Procedures for changing the application for confirmation of plans for drainage facilities, etc.
If it becomes necessary to change the drainage section or drainage system after receiving the confirmation, a new plan confirmation application will be created, the original confirmation number and the reason for the change will be entered in the remarks column, and the original plan confirmation application You must receive confirmation again with a duplicate of the application.
However, other minor changes can be replaced by correcting the duplicate copy of the plan confirmation application.
5 Precautions for submitting a plan confirmation application for drainage facilities, etc.
If any of the following matters apply for connection and installation pipes, consult with Public Works Office in advance before applying for confirmation of drainage plans.
- If the connection on a public road is required.
- In case of repair of existing mounting pipes or insufficient pipe diameter.
- When installing a connection on a public road.
- When connecting and installing a new mounting pipe.
6 Completed construction of drainage facilities, etc. attached documents in registration form
The following books are attached to “registration form, completed construction of drainage facilities (remodeling of flush toilets)”.
- A sketch (guidance map) near the same as a plan confirmation application
- As a general rule, a layout plan of 1/400 or more (floor plan)
Inquiries to this page