Operation of drainage facilities

Last Updated January 10, 2019

1 attached documents of application for confirmation of plans for drainage facilities

The books attached to the “Application for Confirmation of Drainage Equipment (Remodeling of Washing Toilet) Plan” submitted to the Public Works Office in each ward are as follows. In addition, about the details, please read "Yokohama-shi drainage equipment handbook (2006 revised version)" (P2-1, etc.).

(1) Based on the drainage area and the drainage population

attached documents of the application form for confirmation of plans for drainage facilities
AttachmentsScaleCategory
Drainage population
Less than 1,000 people
Drainage population
More than 1,000 people
Wastewater area
Less than 400 square meters
Wastewater area
More than 400 square meters
Wastewater area
Less than 1500 square meters
Wastewater area
More than 1500 square meters
A sketch of the neighborhood
(Guide map)
Optionally (specify directions from nearby general landmarks (bus stops, bridges, "Koban" (police box), schools, etc.))RequiredRequiredRequired
Layout plan (floor plan)In principle, at least 1/400RequiredRequiredRequired
Longitudinal sectionThe side is the same as the layout drawing.
Vertical length is more than 10 times horizontal
RequiredRequiredRequired
Wastewater area
Block split floor plan
According to the layout drawing.Not requiredRequiredRequired
Calculation table for area, etc.Not applicableNot requiredRequiredNot required
Flow rate tableNot applicableNot requiredNot requiredRequired

(2) In case of installation of underground drainage tanks

(1) In addition to the classification, detailed structural drawings of the underground drainage tank (floor plan, longitudinal section)

(3) When the installation location is related to development activities, etc.

(1) In addition to the classification, a copy of the drainage area division floor plan attached at the time of consultation on development activities, etc.

2 Those that can omit the procedure for applying for confirmation of plans for drainage facilities, etc.

If any of the following applies, you do not need to apply for a plan confirmation.

  • When adding or renovating drainage facilities less than 3 meters
    However, construction work to convert the toilet into a flush toilet in the treatment area (hereinafter referred to as “wash toilet remodeling work”) In addition, expansion or renovation of drainage facilities associated with septic tank new construction, night soil septic tank abolition construction, abatement facility installation construction require a plan confirmation application.
  • When connecting existing drainage facilities temporarily with public sewerage works (including private road contracted sewerage works)

3 Installation category of application for confirmation of plans for drainage facilities, etc.

The installation categories of the plan confirmation application are as follows. In addition, about the details, please read Yokohama-shi drainage system handbook (P2-2) well.

Installation category of plan confirmation application
Installation category (name)Details of construction
Drainage facilities
New construction, expansion, renovation
New construction, expansion and renovation of drainage facilities
(Limited to cases where new and remodeling of flush toilets, abolition and new construction of human waste septic tanks, installation of underground drainage tanks, abatement facilities, etc.)
Remodeling of flush toiletsWork to convert the pumping toilet into a flush toilet and drainage work to be performed at the same time.
Abolition of human waste septic tankDrainage construction work associated with the construction of abolishing the human waste septic tank and releasing it directly
New flush toiletsNew construction of drainage facilities accompanying the construction of new flush toilets (only when there is no installation of underground drainage tanks, abatement facilities, etc.)
New construction of septic tanksDrainage construction associated with the construction of a new septic tank (limited to general sewerage with a dark end)
Abatement facilities and othersInstallation of abatement facilitiesBased on the Sewerage Law (site of the Ministry of Land, Infrastructure, Transport and Tourism) (outside site) and the Yokohama City Sewerage Ordinance, drainage construction work to be performed at establishments that have specific facilities and abatement facilities or newly established establishments (the end of the water is public sewerage) Limited to.)
New construction of underground drainage tanksNew construction of underground drainage tanks and drainage construction to be performed at the same time (limited to cases where the end of the drain is a public sewer or a general sewer in dark)
New construction of flush toilets in areas using shared septic tanksIn housing complex, etc., drainage works associated with the construction of new flush toilets in areas with regional joint septic tanks (limited to public sewers or dark general sewers)

4 Procedures for changing the application for confirmation of plans for drainage facilities, etc.

If it becomes necessary to change the drainage section or drainage system after receiving the confirmation, a new plan confirmation application will be created, the original confirmation number and the reason for the change will be entered in the remarks column, and the original plan confirmation application You must receive confirmation again with a duplicate of the application.
However, other minor changes can be replaced by correcting the duplicate copy of the plan confirmation application.

5 Precautions for submitting a plan confirmation application for drainage facilities, etc.

If any of the following matters apply for connection and installation pipes, consult with Public Works Office in advance before applying for confirmation of drainage plans.

  • If the connection on a public road is required.
  • In case of repair of existing mounting pipes or insufficient pipe diameter.
  • When installing a connection on a public road.
  • When connecting and installing a new mounting pipe.

6 Completed construction of drainage facilities, etc. attached documents in registration form

The following books are attached to “registration form, completed construction of drainage facilities (remodeling of flush toilets)”.

  1. A sketch (guidance map) near the same as a plan confirmation application
  2. As a general rule, a layout plan of 1/400 or more (floor plan)

Inquiries to this page

Kohoku Ward Port North Public Works Office

Telephone: 045-531-7361

Telephone: 045-531-7361