Administration of drainage facilities
Last Updated January 10, 2019
1 attached documents of the application for confirmation of drainage facilities
The books to be attached to thePublic Works Office of each ward are generally as follows. For details, please read "Yokohama City Drainage Equipment Handbook (2006 revised edition)" (P2-1, etc.) carefully.
(1) Based on drainage area and drainage population
Attachments | Scale | Classification | ||
---|---|---|---|---|
Drainage population Less than 1,000 | Drainage population More than 1,000 people | |||
Wastewater area Less than 400 square meters | Wastewater area 400 square meters or more Wastewater area Less than 1500 square meters | Wastewater area 1500 square meters or more | ||
Schematic sketch (Guidelines) | Appropriate ("Koban" (police box), school, etc.)) | Required | Required | Required |
Layout plan (plan) | In principle, 1/400 or more | Required | Required | Required |
Longitudinal View | The side is the same as the layout drawing. The length is more than 10 times the width. | Required | Required | Required |
Wastewater area Block plan | According to the layout drawing. | Not required | Required | Required |
Calculation table for area etc. | Not applicable | Not required | Required | Not required |
Flow flow table | Not applicable | Not required | Not required | Required |
(2) In the case of installation of underground drainage tanks
(1) Detailed view of the underground drainage tank (floor plan, longitudinal view)
(3) When the installation location is related to development activities
(1) A copy of the drainage area division plan attached at the time of discussions on development activities, etc.
2 Those that can omit the application procedure for confirmation of drainage facilities, etc.
If any of the following apply, you do not need a plan confirmation application procedure.
- When adding or renovating drainage facilities less than 3 meters
However, construction work to convert a toilet into a flush toilet in the treatment area (hereinafter referred to as “wash toilet remodeling work”) In addition, septic tank new construction, human waste septic tank abolition work, expansion or remodeling of drainage facilities with abatement facility installation work require a plan confirmation application. - When the existing drainage system is temporarily connected to connect with public sewerage work (including private road measures contracted sewerage works)
3 Installation classification of application for confirmation of plan confirmation of drainage facilities
The setting categories of the plan confirmation application are generally as follows. For details, please read the Yokohama City Drainage Equipment Handbook (P2-2, etc.) well.
Category (name) | Details of construction | ||
---|---|---|---|
1 | Drainage facilities New construction, expansion, renovation | Construction, expansion and renovation of drainage facilities (Limited to cases where new construction and remodeling of flush toilets, abolition or new human waste septic tanks, the placement of underground drainage tanks, detoxification facilities, etc.) | |
2 | Remodeling of flush toilets | Work to convert the Kumitori toilet into a flush toilet and drainage construction work performed at the same time | |
3 | Abolition of human waste septic tank | Drainage facilities associated with the work of abolishing the human waste septic tank and discharge it directly. | |
4 | New flush toilet | New construction of drainage facilities accompanying the construction of flush toilets (limited to cases where there is no installation of underground drainage tanks and abatement facilities, etc.) | |
5 | Construction of new septic tanks | Drainage construction associated with the construction of a new septic tank (limited to general sewers where the end of the stream is dark) | |
6 | Abatement facilities, etc. | Installation of abatement facilities | Based on the Sewerage Law (site of the Ministry of Land, Infrastructure, Transport and Tourism) (outside site) and the Yokohama City Sewerage Ordinance, drainage construction to be performed at a business establishment that has set up specific facilities and abatement facilities or a newly established business establishment (the end of the flow is public sewerage Only in the case.) |
Construction of underground drainage tanks | New construction of underground drainage tanks and drainage facilities to be performed at the same time (limited to public sewers or general sewers in the dark) | ||
New flush toilets in areas where community-based septic tanks are used | housing complex (limited to public sewers or general sewers in the dark) |
4 Procedures for changing the application for confirmation of plans for drainage facilities
If it becomes necessary to change the drainage compartment or drainage system after receiving confirmation, create a new plan confirmation application form, fill in the remarks column with the original confirmation number and the reason for the change, and apply for the original plan confirmation application You have to get confirmation again with a duplicate copy of the letter.
However, other minor changes can be substituted by correcting the duplicate items of the plan confirmation application.
5 Precautions associated with submitting a plan confirmation application for drainage facilities
Regarding the connection and mounting pipes, consult with Public Works Office in advance before applying for confirmation of drainage equipment plan.
- When the connection masu on public roads is required.
- When the existing mounting pipe is repaired or insufficient diameter.
- When installing a connection masu on a public road.
- When connecting and mounting pipe is newly installed.
6 Completed construction of drainage facilities attached documents in registration form
The books attached to "Drainage Equipment (wash toilet remodeling) Construction Completion registration form" are as follows.
- Schematic diagram (guide map) in the vicinity of the plan confirmation application
- In principle, layout plan of 1/400 or more (floor plan)