Menu

Close

Here's the text.

Electronic Delivery Guidelines, Standards, etc. of Yokohama City (old version)

Last update date April 1, 2023

Application of the old standards

 Here, the old standards for electronic delivery are posted. "Please consult with the work or construction department about the propriety of application.

Guidelines and standards

Civil engineering section
NameDate of FormulationDownload
Digital Photo Management Information StandardsJune, 2011
(Applied on H23.10)

Full text (PDF: 370KB)

Procedures for electronic delivery of completed construction documents [Civil Engineering]June, 2011
(Applied on H23.10)

Full text (PDF: 1,328KB)

Operation Guidelines for Electronic Delivery, etc. [Civil Engineering]June, 2011
(Applied on H23.10)

Full text (PDF: 2,163KB)

Electronic delivery guidelines for design work, etc. (draft) [Civil Engineering]February, 2010

Full text (PDF: 305KB)

Electronic Delivery Operation Guidelines (Draft) [Business]June, 2011
(Applied on H23.10)

Full text (PDF: 1,436KB)

CAD drafting standard (draft) [Civil engineering]February, 2010

Full text (PDF: 141KB)

Operation Guidelines for CAD drafting standards (draft) [Civil Engineering]June, 2011
(Applied on H23.10)

Full text (PDF: 1,448KB)


Telecommunications
NameDate of FormulationDownload
Procedure for electronic delivery of completed construction documents [Telecommunications equipment]June, 2011
(Applied on H23.10)

Full text (PDF: 1,396KB)

Operating Guidelines for Electronic Delivery, etc. [Construction of Telecommunications Equipment]June, 2012

Full text (PDF: 2,173KB)

Electronic delivery guidelines for design work, etc. [Telecommunications equipment]June, 2011
(Applied on H23.10)

Full text (PDF: 1,129KB)

Electronic Delivery Operation Guidelines [Telecommunications Equipment Business]June, 2012

Full text (PDF: 1,338KB)

CAD Drawing Standards [Telecommunications Equipment]June, 2011
(Applied on H23.10)

Full text (PDF: 1,152KB)

Operation Guidelines for CAD drafting standards [Telecommunications equipment]June, 2013
(Applied on H25.10)

Full text (PDF: 979KB)

Please refer to the Civil Engineering section for the digital photo management information standard.

Machinery and Equipment
NameDate of FormulationDownload

Procedure for electronic delivery of completed construction documents (draft) [Mechanical equipment construction]

June, 2013
(Applied on H25.10)

Full text (PDF: 1,844KB)

Electronic Delivery Operation Guidelines (Draft) [Mechanical Equipment Construction]June, 2013
(Applied on H25.10)

Full text (PDF: 2,140KB)

Electronic delivery guidelines for design work, etc. (Draft) [Mechanical Equipment Construction]June, 2013
(Applied on H25.10)

Full text (PDF: 1,388KB)

Electronic Delivery Operation Guidelines (Draft) [Mechanical Equipment Construction Business]June, 2013
(Applied on H25.10)

Full text (PDF: 1,385KB)

CAD drafting standard (draft) [Mechanical equipment construction]June, 2013
(Applied on H25.10)

Full text (PDF: 959KB)

Operation Guidelines for CAD drafting standards (draft) [Mechanical and Equipment Construction]June, 2013
(Applied on H25.10)

Full text (PDF: 1,180KB)

Please refer to the Civil Engineering section for the digital photo management information standard.

Architecture and Equipment
NameDate of FormulationDownload
Electronic delivery guidelines for completed construction documents (draft) [Building and Building Equipment]June, 2013
(Applied on H25.10)

Full text (PDF: 448KB)

Electronic delivery guidelines for design work, etc. [Building and Building Equipment]June, 2013
(Applied on H25.10)

Full text (PDF: 370KB)

Electronic Delivery Operation Guidelines [Building and Construction Equipment]June, 2013
(Applied on H25.10)

Full text (PDF: 680KB)

Electronic Delivery Operation Guidelines [Building and Building Equipment Business]June, 2013
(Applied on H25.10)

Full text (PDF: 549KB)

Please refer to the Civil Engineering section for the digital photo management information standard.

Geological and soil surveys and surveys
NameDate of FormulationDownload
Electronic Delivery Operation Guidelines (Draft) [Geological and Soil Survey]

June, 2013
(Applied on H25.10)

Full text (PDF: 1,883KB)

Electronic Delivery Operation Guidelines (draft) [Surveying]

June, 2011
(Applied on H23.10)

Full text (PDF: 1,683KB)

Please refer to the Civil Engineering section for the digital photo management information standard.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Finance Bureau Facility Management Promotion Office

Phone: 045-671-4084

Phone: 045-671-4084

Fax: 045-651-7599

Email address: za-cals@city.yokohama.jp

Return to the previous page

Page ID: 195-456-790

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews