Menu

Close

Here's the text.

About suspension of operation due to trouble of municipal Subway Green Line Line

Last Updated August 11, 2020

Press release materials

August 11, 2020

Transportation Bureau Electricity Division

Kazuhiro Fukushima

Phone number: 045-671-3139

Fax: 045-550-4157


 Today, during a patrol inspection of the Green Line, we discovered damage to the overhead parts (line disconnection of the connector connecting the trolley lines), and suspended the operation of the entire Green Line from 0:27 pm for temporary treatment.
 After completing the provisional procedure and confirming safety, the operation resumed at 1:49 pm
 We apologize for any inconvenience caused by the suspension of driving. .

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Electricity Division, Technology Management Department, Transportation Bureau

Telephone: 045-671-3139

Telephone: 045-671-3139

Fax: 045-550-4157

Email address: kt-denki@city.yokohama.jp

Return to the previous page

Page ID: 751-786-835

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews