Menu

Close

Here's the text.

4 Construction-related standards and styles

Last update date April 1, 2024

Special Specifications

List of special specifications for park green space construction

The special specifications to be posted in the latest "List of Park and Green Space Construction Special Specifications" are as follows.

  1. Special Specifications for tree planting insurance
  2. Special specifications concerning the removal of soil generated from construction outside the city
  3. Special Specifications for soil certification
  4. Special Specifications for Improvement of Site Environment
  5. Special specifications concerning type D (Desshu) grounding work
  6. Special specifications for intermediate technology inspection
  7. Special specifications concerning electronic delivery of completed construction documents
  8. Special specifications concerning measures such as estimation accompanying the enforcement of the Asbestos Disorder Prevention Regulations
  9. Special Specifications for Submission of Completion Materials
  10. Special specifications (park layer version) for submission of materials related to completion
  11. Special specifications concerning remote clinical practice at construction sites

For “6. Special Specifications for Intermediate Technical Inspection”, please refer to April 2024 in “Other Special Specific Specifications” below.

Other Special Specifications

Park and green space construction construction management standards and photo management standards

Standards

Park and green space construction construction management list

It is a "park and green space construction construction management table" for use for confirmation of construction management items between the ordering party and the contractor.
Please check the notes and use it.

Precautions

  1. The use of this list is optional. This form is also not stipulated.
  2. It is assumed to be attached to the construction work plan.
  3. Not all items of the two management standards (construction management standards and photo management standards) are not supported. Please be careful when using it.
  4. For information on how to use the two management standards, check the respective standards.

Park and green space construction inspection document preparation document preparation document construction simplification correspondence (draft)

Notice

  • Revised in April 2024. In addition, we changed name of "park green tract of land construction inspection document making point" to "park green tract of land construction inspection document making document". For details, please refer to "Park green space construction inspection document making document". 
  • In the partial revised version in March 2023, the concept at the time of application of the "List of Construction Documents (Civil Engineering)" and "Guide to Simplify Construction Documents (Civil Work)" was changed. Specifically, depending on the time of invitation of contract application (public notice, nomination notice and estimate notice), applicable “list of construction documents (civil engineering work)” and “guide for simplification of construction documents (civil engineering work)” and “Guide for simplification of construction documents (civil engineering work)” The annual version of the version changes. For details, please refer to the following link.
  • Since the partial revision in August 2021, no excerpted versions of the table has not been created. Please refer to the table in the inspection document preparation guidelines.

Reference

  • "List of Construction Documents" (civil engineering work) and "Guide to Construction Documents" (civil engineering work) are available"List of Construction Documents (Simplified Construction Documents / Review of seal)" PagePlease take a look at it.
  • The date of the announcement of the construction is as follows:Yokohama bid doorway (outside site)You can check it from here. Go to the search screen from the "Bid / Contract Results" of the construction in "Bid / Contract Information", search for the relevant construction, and display the "Bid / Contract Result Details (Construction)" page. The date of the announcement is described in the “Bid Participation Eligibility, etc.” column of the “Contract Results” on the “Bid / Contract Result Details (Construction)” page.

Purchased souvenir proof

VE proposal form for VE-related work after contracting

Outline of construction and facility list

New construction and maintenance

Precautions

Please disable the macro and use it.

Redevelopment and facility improvement

Precautions

For the "renovation work" style, please contact the supervisor in charge of the construction.

Related materials

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Parks and Green Space Preservation Division, Green Environment Bureau (in charge of technical supervision)

Phone: 045-671-3433

Phone: 045-671-3433

Fax: 045-664-2588

Email address: mk-midorigijutsu@city.yokohama.lg.jp

Return to the previous page

Page ID: 614-801-275

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews