Menu

Close

Here's the text.

4 Construction-related standards and styles

Last Updated August 7, 2024

Special Specifications

List of Park Green Space Construction Special Specifications

The special specifications to be published in the latest "List of Special Specifications for Park Green Space Construction" are as follows.

  1. Special Specifications for Tree Planting Insurance
  2. Special specifications for the removal of soil generated by construction outside the city
  3. Special Specifications for Soil Certification
  4. Special Specifications for Improvement of Site Environment
  5. Special Specifications for Type D (Dish) grounding work
  6. Special Specifications for Intermediate Technical Inspection
  7. Special specifications for electronic delivery of completed construction documents
  8. Special specifications related to measures such as estimation due to the enforcement of the Asbestos Disorder Prevention Regulations
  9. Special specifications for submission of materials related to completion
  10. Special specifications (park layer version) for submission of materials related to completion
  11. Special specifications for remote presence at construction sites
  12. Designated Safety Management Designated Construction Specifications

Please refer to the following “Other Special Specifications” in April 2024 for “6. Special Specifications for Intermediate Technical Inspection”.

Other Special Specifications

Park green space construction management standards and photo management standards

Standards

List of Park Green Space Construction Management

It is "park green tract of land construction management table" for use in confirmation of construction management item between ordering party and contractor.
Please check the notes and use it.

Notes

  1. Use of this list is optional. This form is not defined.
  2. It is assumed that it will be attached to the construction work plan.
  3. It does not correspond to all items of the two management standards (construction management standards and photo management standards). Please be careful when using it.
  4. Please check the respective standards for how to use the two management standards.

Park green space construction inspection document preparation document simplification correspondence (draft)

Notice

  • It was revised in April 2024. In addition, we changed name of "park green tract of land construction inspection documents making point" to "park green tract of land construction inspection documents making document". As for the details, please confirm "park green tract of land construction inspection documents making document". 
  • In the partially revised version in March 2023, the concept at the time of application of the "List of Construction Documents (Public Works)" and "Guide to Simplification of Construction Documents (Public Works)" was changed. Specifically, at the time of invitation to apply for a contract (public notice, nomination notice and estimate notice), the applicable “List of Construction Documents (Public Works)” and “Guide to Simplification of Construction Documents (Public Works)” The annual version of "is changed. For details, please refer to the following link.
  • The excerpt version of the table has not been created since the partial revision in August 2021. Please check the table in the inspection document preparation procedure.

Reference

  • "List of documents related to construction" (civil engineering work) and "Guide to construction documents" (civil engineering work) are:“List of Construction Documents (Simplification of Construction Documents, Review of seal)” pagePlease take a look at it.
  • The date of public notice of construction work shall be stated.The door of Yokohama Bidding (outside site)You can check it out. Go to the search screen from the "bid / contract result" of the construction in "bid / contract information", search for the relevant construction, and display the "bid / contract result details (construction)" page. The public notice date is listed in the "Bid Participation Qualifications" column of "Contract Results" on the "Bid / Contract Results Details (Construction)" page.

Proof of purchase souvenirs

VE proposal format for construction subject to VE after contract

Overview of Construction and List of Facilities

New construction and maintenance

Notes

Please disable the macro and use it.

Redevelopment and facility improvement work

Notes

For the "renovation work" style, please contact the supervisor in charge of the work.

Related materials

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Green Environment Bureau Parks and Green Space Preservation Division (in charge of technical supervision)

Telephone: 045-671-3433

Telephone: 045-671-3433

Fax: 045-664-2588

Email address: mk-midorigijutsu@city.yokohama.lg.jp

Return to the previous page

Page ID: 614-801-275

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews