Summary of harborside district

Last update date June 10, 2019

Harbor takes place, oasis of place, production of distribution and various roles as faubourg.
It is necessary for the land area of constant area of the sea and the rear to be used integrally to play these roles.
Therefore it is "harborside district" that appointed such land level based on the Town Planning and Zoning Act.

When is appointed in harborside district

We cannot build structure which does not fit purpose of share ward

In Yokohama-shi, we establish ward in harborside district for 4 horns of mercantile port ward, industry Minato-ku, marina Minato-ku, arranging scenery public welfare Minato-ku and prohibit construction of structure which does not meet purpose of each share ward by "regulations about regulation of structure in share ward in Yokohama Port harborside district" (the outside site) and change of use.

Report is necessary for constant act

When do new establishment and enlargement of factory of (the total of floor space 2,500m2 or more or plottage 5,000m2 or more) or business ground more than constant scale by 2 of harbor method Article 38 in harborside district, area of the sea facility, canal, water kyo or drainage kyo, construction of waste disposal and treatment facility when improve, please report next within 60 days before start of construction.

  1. Position, type and plottage, floor space
  2. Quantity and transportation plan of freight accompanied with operation
  3. Quantity and processing plan of refuse which operation causes

These contents may have you change plan when you interfere with case that is not appropriate and the use, maintenance of harbor in light of harbor plan remarkably.

Procedure for structure construction in harborside district

About report (2 of harbor method Article 38) of act in harborside district

It is new establishment of factory of (more than 5,000 square meters of plottage or 2,500 square meters of total of floor space or more) or business ground and notice which is necessary when we build more more than constant scale in harborside district.

Flow of report

  1. We talk about construction plan with Port and Harbor Bureau administration of property Section 1
  2. Contents confirmation (temporary submission) of submission document
  3. Submission (until construction start of construction 60 days ago)
  4. (when admitted that we do not adapt to standard to establish in limit, law within 60 days from day when we accepted report change of plan we may urge.)

About report of structure construction in Yokohama Port harborside district

It is notice to confirm whether facility to build adapts to "the regulations about regulation of structure in share ward in Yokohama Port harborside district".

Flow of notice

  1. We talk about construction plan with Port and Harbor Bureau administration of property Section 1
  2. Contents confirmation (temporary submission) of submission document
  3. Submission
  4. We return notice (copy) which sealed in proper identification stamp
  5. We submit to building certification application organization such as Housing and Architecture Bureau as attached documents of building certification application
  6. The start of construction

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Port and Harbor Bureau harbor administration of property part administration of property Lesson 1

Telephone: 045-671-7085