Menu

Close

Here's the text.

Precautions for Construction

Last Updated March 1, 2022

When we perform the following construction in Yokohama-shi, prior consultation and report may be necessary.

Notice

•In order to prevent the spread of the new coronavirus infection, we will continue to accept some duties at the counter by mail or e-mail after the state of emergency.
•When mailing or e-mailing, please call each person in charge in advance.
•Specifically, please confirm "guidance of procedure about Building Guidance Division window for prevention of spread of infection by new coronavirus infection" (PDF: 307KB).


 

  • Construction type
    Root cutting work with a height of more than 3m
  • Laws and Regulations
    Yokohama City Building Standard Law Enforcement Detailed Regulations
  • Required work and notification destination
    Submission of a mountain retaining construction plan at least 7 days before the start of construction
    To the Building Guidance Division

Reinforced concrete work (including precast concrete work) or steel reinforced concrete work (Yokohama-shi confirmation property only)

  • Construction type
    RC construction and SRC buildings with a floor area of 500 m2 or more
  • Laws and Regulations
    Yokohama City Building Standard Law Enforcement Detailed Regulations
  • Required work and notification destination
    Submission of a reinforced concrete construction construction plan at least 7 days before construction starts
    To the Building Guidance Division

Steel frame construction or steel reinforced concrete construction (in Yokohama-shi property only)

  • Construction type
    S and SRC structures with 3 floors or more or floor area of 500 m2 or more
  • Laws and Regulations
    Yokohama City Building Standard Law Enforcement Detailed Regulations
  • Required work and notification destination
    Submission of steel frame construction construction plan 7 days before construction start
    To the Building Guidance Division

Drainage and drilling work associated with construction work

Construction work that generates noise and vibration associated with construction work

  • Construction details
    Work that generates significant noise and vibration among construction work in designated areas (specific construction work type)
  • Laws and Regulations
    Noise Control Law, Vibration Control Law, ordinances related to conservation of Yokohama City Living Environment
  • Required work and notification destination
    Submission of registration form at least 7 days prior to the commencement of specific construction work
    Environmental Planning Bureau Atmosphere and Sound Environment Division TEL: 045(671)2485

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Building Guidance Division, Housing and Architecture Bureau Building Guidance Division

Phone: 045-671-4536

Phone: 045-671-4536

Fax: 045-681-2437

Email address: kc-kozo@city.yokohama.jp

Return to the previous page

Page ID: 713-207-085

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews