Menu

Close

Here's the text.

Points to note when construction starts

Last Updated March 1, 2022

When we perform the following construction in Yokohama-shi, prior consultation and report may be necessary.

Notice

•In order to prevent the spread of COVID-19 infection, we will continue to accept some services at the counter by mail, e-mail, etc. even after the state of emergency.
•When mailing or e-mailing, please call each person in charge in advance.
•Specifically, please confirm "guidance of procedure about Building Guidance Division window for prevention of spread of infection in new coronavirus infectious disease" (PDF: 307KB).


 

  • Type of construction
    Root cutting work with a height of more than 3m
  • Laws and Regulations
    Yokohama City Building Standard Law Enforcement Detailed Regulations
  • Necessary work and notification destination
    Submission of the retaining work construction plan at least 7 days before the start of construction
    Building Guidance Division Structural Section

Reinforced concrete work (including precast concrete work) or steel-framed reinforced concrete work (only for properties confirmed by Yokohama City)

  • Type of construction
    RC, SRC, 3rd floor or higher or floor area of 500 m2 or more
  • Laws and Regulations
    Yokohama City Building Standard Law Enforcement Detailed Regulations
  • Necessary work and notification destination
    Submission of a reinforced concrete construction work plan at least 7 days before the start of construction
    Building Guidance Division Structural Section

Steel-frame construction or steel-frame reinforced concrete construction (Yokohama-shi confirmation property only)

  • Type of construction
    3rd floor or higher or floor area of 500m2 or more S or SRC
  • Laws and Regulations
    Yokohama City Building Standard Law Enforcement Detailed Regulations
  • Necessary work and notification destination
    Submission of steel frame construction work plan at least 7 days prior to the start of construction
    Building Guidance Division Structural Section

Drainage and drilling work associated with construction work

Construction work that generates noise and vibration during construction work

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Housing and Architecture Bureau Building Guidance Department, Building Guidance Division

Telephone: 045-671-4536

Telephone: 045-671-4536

Fax: 045-681-2437

Email address: kc-kozo@city.yokohama.jp

Return to the previous page

Page ID: 713-207-085

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews