Menu

Close

Here's the text.

Recognition of Energy Conservation Standards (Article 41)

Last Updated December 18, 2024

Energy Conservation Standards Compliance Certification and Labeling System

  • It will be certified to prove that the building currently built conforms to the Building Energy Consumption Performance Standards (Energy Conservation Standards).
  • Once certified, the conformity certification mark (e mark) can be displayed.

Article 36 Certification Mark

Indication of Energy Conservation Standards Conformity Certification Mark

  • Authorized owners should perform appropriate maintenance so that the building continues to conform to energy saving standards.
  • When you change owner, please submit owner change notice of building.

About procedure of certification application

For the standard procedure, apply to Yokohama City after undergoing a technical examination on the certification criteria in advance by the "examination organization".

36 Application Flow

≪Examining body≫
・Registered Energy Conservation Judgment Organization: Registered building energy consumption performance evaluation organization prescribed in the Building Energy Conservation Law
・Registered housing performance evaluation organization: Registered house performance evaluation organization prescribed in the Act on Promotion of Housing Quality Assurance

※Regarding the entire building, among the following documents related to energy-saving performance issued by a third-party organization at the time of new construction, those that prove that they are equal to or greater than that of conforming to the "Building Energy Consumption Performance Standards" Is treated as equivalent to the one that has undergone a technical review by the examination body. However, only when the designer, etc. has confirmed that the standards still conform to the standards.

  • Notice (copy) of energy-saving performance improvement plan certification
  • Low-carbon building new construction plan certification letter (copy)
  • Construction house performance evaluation report (copy)
  • Notice of conformity (copy) for energy saving notification, etc.
  • Notes on Application for Certification
    • The scope of certification is the entire building.
    • Please apply when all construction is completed.
    • The applicant will be the owner of the building.
    • If you have undergone a technical review by the examination organization in advance, the certification fee in Yokohama is free.
Standard processing period (Estimated from application for certification to issuance of certification notice)
If you have received a certificate of conformity with the technical suitability examination by the examination body15th

※Other than the above, please refer to the standard processing period page of Housing and Architecture Bureau.

Application for certification
Building Environment Section, Building Planning Division, City of Yokohama, Housing and Architecture Bureau Building Guidance Department
Address25th floor of 10 City Hall at 6-50 Honcho, Naka-ku, Yokohama City
Telephone045-671-4526

About certification application fee

About application documents

Please bind and submit all copies of the first copy and the second copy in A4 version file.

  1. Application for certification (Form 37) (outside site)
  2. Power of Attorney When the applicant delegates the procedure to another person
  3. Books specified in the table of Article 1 of the Enforcement Regulations (PDF: 181KB)
  4. Other books deemed necessary by the mayor

 ・ Depending on the type of conformity certificate, etc., the attached books specified in the rules may not be required.

seal is no longer required for applications.
※seal, a power of attorney, is not required. (Please determine the necessity of seal between the delegates and the delegates.)

Certification standards, etc.

Please refer to laws and regulations, notices, etc. for the certification criteria.

Other forms, etc.

About procedure to affect authorization application, please confirm summary of Yokohama-shi.

Other forms, etc.

Notification of owner change of building (2 of summary third style) (outside site)
(When changing the owner of a building)

Notification of withdrawal (Summary No. 4 style) (outside site)
(When withdrawing the application before certification)

Authorization cancellation application (2 of summary fifth style) (outside site)
(When the building is lost / no longer conforms to the standards)

Report (summary eighth style) about standard conformity authorization building (outside site)
(When Yokohama City asks for a report.)

Re-grant application (summary eleventh style) (outside site)
(If you wish, such as when the certificate is lost or when the name is changed)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Building Planning Division, Housing and Architecture Bureau Building Guidance Department

Telephone: 045-671-4526

Telephone: 045-671-4526

Fax: 045-550-3568

Email address: kc-casbee@city.yokohama.lg.jp

Return to the previous page

Page ID: 882-748-945

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews