Menu

Close

Here's the text.

Approval of Energy Conservation Standards (Article 41)

Last update date April 1, 2024

Energy Conservation Standards Compliance Certification and Labeling System

  • It is a certification that proves that the building currently being built conforms to the building energy consumption performance standard (energy saving standard).
  • Once certified, you can display the conformity certification mark (e mark).

Article 36 Certification Mark

Labeling the certification mark for conformity with energy conservation standards

  • Certified owners should perform appropriate maintenance so that the building will continue to conform to energy conservation standards.
  • When you change owner, please submit owner change notice of building.

About procedure of certification application

Standard procedures are applied to Yokohama City after receiving a technical examination on the certification criteria in advance by the "examination body".

36 Application Flow

≪Reviewing body≫
・Registered energy-saving judging body: Registered building energy consumption performance assessment organization prescribed in the Building Energy Conservation Law
・Registered Housing Performance Evaluation Facility: Registered house performance evaluation organization prescribed in the Act on Promotion of Housing Quality Assurance

※Regarding the entire building, of the following documents pertaining to energy-saving performance issued by a third-party organization at the time of new construction, those that prove that they are equal to or greater than conforming to the "Building Energy Consumption Performance Standards" , Will be treated as equivalent to those that have undergone a technical review by the examination body. However, only if the designer has confirmed that the standards still conform to the standards.

  • Notice (copy) of energy saving performance improvement plan certification
  • Plan certification letter of advice (copy) such as low-carbon buildings
  • Construction Housing Performance Evaluation Report (Copy)
  • Notice of conformity (copy) for energy saving notification
  • Precautions for Certification
    • The scope of certification is for the entire building.
    • Please apply when all construction is completed.
    • The applicant will be the owner of the building.
    • If you have undergone a technical review by an examination organization in advance, the certification fee in Yokohama City is free.
Standard processing period (Estimated from application for certification until issuing a certification notice)
Where a certificate of conformity with the technical review has been obtained by the examination body15th

※Other than the above, please refer to the standard processing period of Housing and Architecture Bureau.

Application for certification
Building Environment Section, Building Planning Division, City of Yokohama, Housing and Architecture Bureau
Address10 City Hall 25th Floor, 6-50 Honcho, Naka-ku, Yokohama
Telephone045-671-4526

About certification application fee

About application documents

Please bind all copies and one copy to A4 size file and submit.

  1. Application for certification (Form 37) (outside site)
  2. Power of Attorney When the applicant delegates the procedure to another person
  3. Books stipulated in the table of Article 1 of the Law Enforcement Regulations (PDF: 181KB)
  4. Other books that the mayor deems necessary

 ・ Depending on the type of certificate of conformity, etc., the attached documents specified by the rules may not be required.

seal is no longer required for applications.
※The seal of Power of Attorney is not required. (Please determine the necessity of seal between delegates and delegates.)

About certification standards

Please refer to laws and regulations for the certification criteria.

Other forms

About procedure to affect certification application, please confirm summary of Yokohama-shi.

Other forms

Notification of owner change of building (2 of summary third style) (outside site)
(When changing the owner of a building)

Notification of withdrawal (Summary No. 4 style) (outside site)
(When withdrawing the application before certification)

Authorization cancellation application (2 of summary No. 5 style) (external site)
(When the building is lost or no longer meets the standards)

Report (Summary No. 8 style) about standard conformity authorization building (outside site)
(When a report is requested by Yokohama City)

Re-grant application (summary eleventh style) (outside site)
(If you wish, such as when the certificate is lost or the name is changed.)

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Building Planning Division, Housing and Architecture Bureau Building Guidance Department

Phone: 045-671-4526

Phone: 045-671-4526

Fax: 045-550-3513

Email address: kc-casbee@city.yokohama.jp

Return to the previous page

Page ID: 882-748-945

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews