Menu

Close

Here's the text.

Scenic Area Ordinance Q & A

Last Updated November 8, 2024

Q
Do you have any documents that summarize the criteria?
A

There is a "Guide to Scenic Areas". We can download from homepage "1, act, permission standard that needs permission in scenic area".

Q
Can I use mitigation of the corner lot of the building coverage rate?
A

Relaxation of the building coverage rate according to the Building Standards Law, such as relaxation of corner lots, cannot be applied.

Q
Is there an application fee?
A

I don't need it.

Q
How long is the screening period?
A

The standard is 15 days. About buildings such as buildings, please submit permission application before submitting confirmation application.

Q
In what case do you need to do?
A

[Building of Buildings, etc.]
Construction, extension, renovation or relocation of a building, with a total floor area of that part exceeding 10 m2

[Development of residential land, etc.]
Changes in the characteristics of land with an area of more than 60m2, cuts and embankments that produce glue exceeding 1.5m

[New construction of structures, etc.]
New construction, renovation, extension or relocation of outdoor structures such as retaining walls, towers, elevated water tanks, billboards and the like, which are more than 1.5m in height.

Cutting of wood and bamboo
Cutting wood and bamboo with a height of more than 5m on the site where the building is located, cutting wood and bamboo on land where there is no building (excluding normal management activities for childcare of wood and bamboo such as thinning, pruning, branching, etc.) )

※In addition to the above procedures, there are changes in the color of buildings, reclamation or reclamation of the water surface, collection of debris, waste or recyclable resources outdoors.

Q
Do I need to submit a report?
A

I need it.
When construction is completed, please submit notice of act completion (the 17th style) in scenic area immediately. Please refer to the following for required documents.

[Building of Buildings, etc.]
Completion map (if there is a minor change), photos of scaled plantings (those that know the number of plants and tree height, planting location), overall photos of buildings, etc. (those that know form and color), Copy of inspection certificate (Building Standards Law)

[Development of residential land, etc.]
Completion map (if there is a minor change), photos of scaled planting, etc. (when the number of plants and tree height, and planting location are known), overall photos of the land development site, copy of the certificate of inspection (development activities, residential land When subject to the Regulation Law for Land Development)

[New construction of structures, etc.]
Completion map (when there is a minor change), photographs of structures, etc. (when the form and design are understood), photographs of planting, etc. (when necessary as a retaining wall design), copy of inspection certificate (development activities, When subject to the Regulation Law for Residential Land Development, Building Standards Law)

Cutting of wood and bamboo
Completion map (if there is a minor change), photos after logging and photos of replanting trees with scales (the number of plants planted, the height of trees, and the location of planting)

Q
I would like to confirm whether the planned site corresponds to a scenic area.
A

To confirm whether it corresponds to a scenic area, check with i-Mappi (outside site) (outside site) or check
Please refer to City Planning Division (045-671-3510).

Inquiries to this page

Building Planning Division, Housing and Architecture Bureau Building Guidance Department

Telephone: 045-671-4526

Telephone: 045-671-4526

Email address: kc-fuchi@city.yokohama.lg.jp

Return to the previous page

Page ID: 303-952-309

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews