- Yokohama-shi Top Page
- Business
- Menu by field
- Environment, parks and sewers
- Living Environment conservation
- Air and odor
- Air Pollution Control Law
- General dust generation facilities
- Procedures for general dust generation facilities
Here's the text.
Procedures for general dust generation facilities
Last Updated April 10, 2024
Provides an overview of notification procedures and standards based on the Air Pollution Control Law for general dust generation facilities.
1 Outline of the notification procedure
When setting up or changing general dust generation facilities, or when the corporate representatives listed in the notification of general dust generation facilities are changed, a notification procedure based on the Air Pollution Control Law is required. (Guide for notification pertaining to general dust generation facilities (PDF: 733KB))
In submitting a notification pertaining to a general dust generation facility based on the Air Pollution Control Law, if the facility falls under the designated facility of the Ordinance on conservation, etc. of Yokohama City Living Environment (hereinafter referred to as the “Ordinance”), The procedure is also required, so please check at the section in charge.
Laws and regulations | Facilities | Procedures | Contents |
---|---|---|---|
Air Pollution Control Law | General dust generation facilities | Notification | Installation, change, name change, succession, abolition, etc. |
Ordinance on conservation, etc. of Yokohama City Living Environment | Designated facilities (PDF: 218KB) | Permission application or notification | Installation, change, name change, succession, abolition, etc. |
2. Regulatory Standards
In addition to the standards related to the structure of general dust generation facilities stipulated in the Air Pollution Control Law, it is also necessary to comply with the regulations related to the conservation, etc. of the Yokohama City Living Environment. For details, please refer to the section in charge.
- Standards pertaining to general dust generation facilities stipulated in the Air Pollution Control Law
→Appendix No. 6 of the Enforcement Regulations of the Air Pollution Control Law (Standards for Structure of General Dust Generation Facilities) - Regulations based on the Ordinance on conservation, etc. of Yokohama City Living Environment (Article 25)
→Ordinance Enforcement Regulations Attached Table 9 (Regulation Standards for Dust)Etc.
3 About notification procedure about general dust generation facility
For details on reports, etc., be sure to check in advance at the section in charge. For the notification, please fill out the prescribed form with required items and submit the attached documents explaining the details. Also, please unify the size of the registration form documents to A4 and fold large drawings to A4.
In addition, we may not be able to accept documents if there are incomplete documents, so please allow enough time for submission.
(1) Notification of installation of general dust generation facilities
Subsidiary provisions | Article 18 of the Air Pollution Control Law |
---|---|
Style | Installation of general dust generation facilities (use, change) registration form [Form No. 3 (Attachment 1, Attachment 2, Attachment 3, Attachment 4)] (External site) |
Number of copies submitted | 2 copies of primary and secondary copies |
Submission deadline | Before installation |
Remarks | Attachments 1 to 4 should be selected and attached according to the general dust generation facility pertaining to the notification. In the case of notification, be sure to consult with the section in charge in advance. |
[attached documents]
Depending on the content of the notification, in addition to the materials shown here, there may be cases where it is necessary or unnecessary, so please check at the counter at the time of notification. In addition, multiple contents may be summarized in one drawing, but be careful not to make the contents difficult to understand.
Documents | Remarks |
---|---|
Overview of the contents of the notification | In addition to the reasons for notification, etc., please summarize how to use the general dust generation facility, an overview of the dust generation and its treatment method, and an overview of the production process (flowsheet, etc.). |
Guide map | Please attach a map that shows the location of the establishment where the general dust generation facility is installed. |
Floor plan of business sites | Mark general dust generation facilities, equipment related to dust treatment, etc. with a color pen, etc., and enter the facility number and facility name. |
Layout of general dust generation facilities (floor plan, elevation) | Mark the target facility with a color pen, etc., and enter the facility number and facility name. |
Structural diagram of general dust generation facilities | In the case of a sedimentary field, make it so that the area of the place used as a sedimentary field can be calculated. Attach the belt width for a belt conveyor, and the volume of the bucket inside for a bucket conveyor. |
Specifications, catalogs, etc. of general dust generation facilities | Please attach something that can confirm the size requirements of the general dust generation facility.
|
Layout of equipment related to dust treatment (floor plan, elevation) | Please state the name of the main equipment. When installing watering equipment, please also indicate the position of the faucet and the range of watering. |
Structural diagram of facilities related to dust treatment | |
Specifications, catalogs, etc. of equipment related to dust treatment | Attach a copy that shows the performance of the equipment related to dust treatment (watering capacity, dust collection efficiency, etc.). |
Materials related to the prevention of scattering of dust | Please summarize the measures to prevent the scattering of dust. |
Others | Please attach necessary instructions according to the content of the notification. |
(2) Notification of changes in general dust generation facilities
Subsidiary provisions | Article 18 of the Air Pollution Control Law |
---|---|
Style | Installation of general dust generation facilities (use, change) registration form [Form No. 3 (Attachment 1, Attachment 2, Attachment 3, Attachment 4)] (External site) |
Number of copies submitted | 2 copies of primary and secondary copies |
Submission deadline | Before the change |
Remarks | Attachments 1 to 4 should be selected and attached according to the general dust generation facility pertaining to the notification. In the case of notification, be sure to consult with the section in charge in advance. |
[attached documents]
Depending on the content of the notification, in addition to the materials shown here, there may be cases where the same thing as attached documents in “(1) Notification of Installation of General Dust Generation Facility” is required or unnecessary. Please check at the counter at the time of notification. In addition, multiple contents may be summarized in one drawing, but be careful not to make the contents difficult to understand.
Documents | Remarks |
---|---|
Overview of the contents of the notification | Please summarize the changes in addition to the reasons for notification. |
Guide map | Please attach a map that shows the location of the establishment pertaining to the notification. |
Floor plan of business sites | Mark general dust generation facilities to be changed, facilities related to dust treatment, etc. with color pens, etc., and enter the facility number and facility name. |
Layout of general dust generation facilities (floor plan, elevation) | Mark the facilities to be changed with a color pen, etc., and enter the facility number and facility name. |
Drawings showing changes | Please show the drawings before and after the change of the items to be changed. Mark the target facilities and the parts to be changed with a color pen etc. |
Explanatory materials for changes | Mark the parts to be changed with a color pen or the like. If necessary, please attach the materials before and after the change. |
Others | Please attach necessary instructions according to the content of the notification. |
(3) Notification of change in name, etc.
Subsidiary provisions | Article 18-13 of the Air Pollution Control Law |
---|---|
Style | Name Change registration form (outside site) |
Number of copies submitted | 2 copies of primary and secondary copies |
Submission deadline | Within 30 days from the date of change |
Details of notification | Changes related to the following:
|
(4) Notification of abolition of general dust generation facilities
Subsidiary provisions | Article 18-13 of the Air Pollution Control Law |
---|---|
Style | Abolished use of general dust generation facilities registration form [Form No. 5] (outside site) |
Number of copies submitted | 2 copies of primary and secondary copies |
Submission deadline | Within 30 days from the date of abolition |
Details of notification | Abolition of general dust generation facilities |
Remarks | Make sure that all general dust generation facilities installed at the establishment have been abolished or some general dust generation facilities have been abolished. If necessary, please attach a document that shows the new situation associated with the abolition of the facility (such as what the facility is to be updated). |
(5) Notification of succession of general dust generation facilities
Subsidiary provisions | Article 18-13 of the Air Pollution Control Law |
---|---|
Style | Succession registration form (outside site) |
Number of copies submitted | 2 copies of primary and secondary copies |
Submission deadline | Within 30 days from the date of succession |
Details of notification | Succession of general dust generation facilities |
Remarks | Make sure that all general dust generation facilities installed at the establishment are succeeded or that some general dust generation facilities have been succeeded. In the case of succession of some facilities, please attach a document that can identify the facilities that have been succeeded as necessary. |
4 Notification Address and Inquiries
Please refer to "Information for Inquiry and Notification Desk".
In addition, depending on the content of the notification and consultation, it may take some time to confirm, so please come with plenty of time.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Atmosphere and Sound Environment Division, Environmental Protection Department, Green Environment Bureau
Telephone: 045-671-3843
Telephone: 045-671-3843
Fax: 045-550-3923
Email address: mk-taikikisei@city.yokohama.lg.jp
Page ID: 924-122-072