Menu

Close

Here's the text.

Air Pollution Control Law General Dust Generation Facility

Last Updated April 10, 2024

(Article 3 of the Air Pollution Control Law Enforcement Order, Appendix 2)

 Appendix No. 2
Item numberType of facilitiesScale of the facility
Coke ovenRaw material processing capacity must be 50 tons or more per day.
Minerals (including cokes, excluding asbestos) The same shall apply hereinafter. ) Or debris deposition siteThe area must be at least 1,000 square meters.
Belt conveyors and bucket conveyors (limited to those used for minerals, debris or cement, excluding sealed ones)The width of the belt must be 75 cm or more, or the internal volume of the bucket must be 0.03 cubic meters or more.
Crushers and attritors (limited to those used for minerals, rocks or cement, excluding wet and sealed)The rated output of the prime mover must be 75 kilowatts or more.
Sieves (limited to those used for minerals, rocks or cement, excluding wet and sealed)The rated output of the prime mover must be 15 kilowatts or more.

Inquiries to this page

Atmosphere and Sound Environment Division, Environmental Protection Department, Green Environment Bureau

Telephone: 045-671-3843

Telephone: 045-671-3843

Fax: 045-550-3923

Email address: mk-taikikisei@city.yokohama.lg.jp

Return to the previous page

Page ID: 768-258-089

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews