- Yokohama-shi Top Page
- Business
- Menu by field
- Roads and rivers
- Rivers
- To businesses (River Management Division)
- About permission application about specific city river inundation damage measures law
Here's the text.
About permission application about specific city river inundation damage measures law
About permission application about specific city river inundation damage measures law
Last Updated March 31, 2024
In June 2003, the Tsurumi River basin was designated as a specific urban river basin in April 2005 and the Sakaigawa basin was designated as a specific city river basin in February 2014. This law determines the basin based on the magnitude of damage to rivers that flow through urban areas and are remarkably urban river basins based on the magnitude of damage in the event of floods and the difficulty of large-scale river maintenance. It is specified as a river basin. (Tsurumi River is designated by the Minister of Land, Infrastructure, Transport and Tourism, and the Sakai River is designated by the Governor of Kanagawa Prefecture.)
River managers, sewer managers, and local governments in the basin play a role in jointly formulating a “basin flood countermeasures plan” with the aim of creating a town (basin) that is resistant to flood damage, and is effective to enhance safety. Implement effective and efficient flood damage countermeasures. In addition, residents and businesses in the basin are responsible for making efforts to store and infiltrate rainwater, and if they perform rainwater infiltration inhibiting activities, obtain permission.
About confirmation of specific city river basin (Tsurumi River basin, Sakaigawa basin)
About confirmation of specific city river basin (Tsurumi River basin, Sakaigawa basin), please see the following basin map and town name list.
Act on Countermeasures against Flood Damage to Specified Urban Rivers
Please see the page of the Ministry of Land, Infrastructure, Transport and Tourism website for details on the Act on Countermeasures against Flood Damage to Specified Urban Rivers.
Tsurumi River Basin
For details on the Tsurumi River basin, please see the following Tsurumi River basin leaflet and the homepage of the Keihin River Office of the Ministry of Land, Infrastructure, Transport and Tourism.
Sakaigawa Basin
For details on the Sakaigawa basin, please see the following Kanagawa Prefecture website and the reference map of the Sakaigawa basin.
Form for permission application for rainwater infiltration inhibition
List of examination required documents and entry examples | PDF(PDF:1,771KB) |
---|
Permit Application Flow and required documents | ― | PDF(PDF:287KB) |
---|
Permit application | Word (word: 18KB) | PDF(PDF:115KB) |
---|
Plan manual | Excel (Excel: 32KB) | PDF(PDF:12KB) |
---|---|---|
Related Forms 4 to 7 (Reference Materials) | ― | PDF(PDF:20KB) |
Procedure documents after permission for rainwater infiltration
registration form (Submission: 1 copy) | Word (word: 25KB) | PDF(PDF:10KB) |
---|---|---|
Permitted sign | Word (word: 18KB) | PDF(PDF:10KB) |
Application for permission to change (if the content is changed) | Word (word: 18KB) | PDF(PDF:11KB) |
---|---|---|
Notification of change (if the construction period is changed) | Word (word: 22KB) | PDF(PDF:11KB) |
Completed registration form | Word (word: 13KB) | PDF(PDF:98KB) |
---|---|---|
Management implementation plan | Word (word: 20KB) | PDF(PDF:133KB) |
Abolished registration form | Word (word: 14KB) | PDF(PDF:164KB) |
---|
Forms of prior consultation on rainwater infiltration inhibition
Prior consultation registration form | Word (word: 17KB) | PDF(PDF:107KB) |
---|---|---|
Related Forms 1 to 3 | Excel (Excel: 33KB) | PDF(PDF:22KB) |
Preliminary consultation flow and required documents | ― | PDF(PDF:15KB) |
---|
Reservoir Capacity Calculation System
The regulating pond capacity calculation system and manual can be downloaded from the Ministry of Land, Infrastructure, Transport and Tourism website below.
The rainfall intensity used in the regulating pond capacitance calculation system is as follows.
- In the case of System Ver1 Rainfall intensity (Excel: 25KB)
- In the case of System Ver2
About plan certification system for rainwater storage and infiltration facility maintenance (in specific city river basin)
Along with the revision of the Act on Countermeasures against Flood Damage to Specified Urban Rivers, a plan certification system was established for the development of rainwater storage and infiltration facilities that meet the conditions such as capacity of a certain size or more and appropriate maintenance methods performed by private businesses etc. .
(Inquiry about development consultation, telephone: 045-671-2898)
In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
For inquiries to this page
Committee, River Department, River Department, River Department, Sewerage River Bureau
Phone: 045-671-2898
Phone: 045-671-2898
Fax: 045-664-5873
Email address: gk-ike@city.yokohama.jp
Page ID: 618-853-258