Sewerage self-financing construction

Last Updated October 10, 2024

What is self-financing construction of sewerage?

Person except sewer manager receives approval from sewer manager and performs construction about sewer facility on public roads at own expense.
For example, if three houses are built where one existing house was located, three mounting pipes will be required, but in most cases, two of them will be self-financing (new construction), and one will be existing. Use the mounting pipe. If you change the position of the existing mounting pipe due to the layout of the building, this will also be your own expense (removal / new construction).

About each procedure from application to completion and application style, please confirm on homepage of sewer River Bureau sewer self-financing construction.

(http://translate-en.city.yokohama.lg.jp/kankyo/gesui/jihikoji/20170316120054.html)
↑Click here for the procedure and application form for self-financing construction.

Application for sewerage self-financing construction (reference)

You must submit an “Application for Approval of Construction of Sewerage Facilities” to each Public Works Office before construction and receive approval from The Mayor of Yokohama, the public sewerage administrator.

"Application for approval of construction of sewerage facilities" (No. 12 style)

The following documents (1-8) are usually attached to the application for self-financing construction of the mounting pipe.
1.Guide map (copy of map, etc.)
2.Layout diagram (with the exterior shape of the building and the position of the mounting pipe)

Layout drawing

3.Floor plan (The extension of the mounting pipe is from the inside of the basin to the center of the sewer main. 1st place below decimal point (in meter)
→Refer to the installation pipe laying diagram of Yokohama City Sewerage Design Standard Map (tube edition) (to the Yokohama City Sewerage River Bureau page)

4.Cross-section (The extension of the mounting pipe is from the inside of the basin to the center of the sewer main. 1st place below decimal point (in meter)
Attention: For construction with a pipe diameter of 250 mm or more, a longitudinal drawing is required.

5.Cross-sectional view of pavement excavation (commensurate with the type of pavement at the relevant location) Please check the pavement type in Public Works Office. )

Reference diagram of the pavement excavation section

6.Public sewer ledger map (copy)

7.Drainage equipment plan confirmation application (confirmed duplicate) copy complete

8.Road excavation site road surface restoration work implementation pledge accompanying the construction of public sewerage facilities

Notification of commencement of sewerage self-financing construction (reference)

Those who have received a letter of approval from Public Works Office should submit a schedule to the Public Works Office when they start construction of sewerage facilitiesregistration form.

"Notice of start of construction of sewerage facilities" (No. 14 style)

Please attach the schedule.

Notification of completion of sewerage self-financing construction and inspection (reference)

Upon completion of such work, the applicant must submit “registration form Completion of Construction of Public Sewerage Facilities” to the Public Works Office promptly and undergo a document inspection and on-site inspection at the construction site.

Completed construction of sewerage facilities, etc. registration form (No. 17 style)

Completion of mounting pipes The following documents (1 to 5) are usually attached to registration form.
1.Guide map

2.A copy of the public sewer ledger map with the offset entered (the offset (distance) from the connection basin and the upstream human hole to the connection basin)

3.Floor plan (The extension of the mounting pipe is entered from the inside of the basin to the center of the sewer main. 1st place below decimal point (in meter)

4.Cross-section (The extension of the mounting pipe is entered from the inside of the basin to the center of the sewer main. 1st place below decimal point (in meter)

5.Photographs of construction

If there is no defect in the contents of the self-financing construction (if it is a workmanship or content that can be taken over as a facility in Yokohama City), after the completion inspection, a certificate of completion inspection (one with the mayor's seal stamped) will be issued to the applicant.

Inquiries to this page

Public Works Office Tsurumi, Tsurumi-ku

Telephone: 045-510-1669

Telephone: 045-510-1669

Fax: 045-505-1318

Email address: tr-doboku@city.yokohama.lg.jp

Return to the previous page

Page ID: 715-180-705

Menu of ward

  • LINE
  • Twitter
  • Instagram
  • YouTube