Menu of ward

Close

  1. Yokohama-shi Top Page
  2. Nishi Ward Top Page
  3. Disaster Prevention and anti-crime program
  4. Disaster Prevention and Disasters
  5. Partial suspension of operation of the Nishi Ward River Water Level Information Transmission System

Here's the text.

Partial suspension of operation of the Nishi Ward River Water Level Information Transmission System

Last update date November 22, 2023

 Since 2005, Nishi Ward has installed and operated speakers at five locations along the river to alert local residents when water levels rise. This time, the operation of the speaker (one place) installed at Ishizaki Bridge will be temporarily suspended due to the construction of nearby facilities (Sakuragi pumping station). We apologize for any inconvenience this may cause, but we appreciate your understanding and cooperation.

1 Speaker to stop

One speaker installed at Ishizaki Bridge (on the site of Sakuragi Pumping Station)
※Four speakers other than Ishizaki Bridge will be operated as usual.

Installation location map
■Location map of speakers and water level gauges

2 Operational suspension period

 From Friday, November 24, 2023 to around April 2024 (planned)

3 Response during operation suspension period

 When evacuation information is issued due to the flood, information will be transmitted using area mail to mobile phones and on-board speakers using public relations vehicles.

For inquiries to this page

Nishi Ward General Affairs Department General Affairs Division

Phone: 045-320-8310

Phone: 045-320-8310

Fax: 045-322-9902

Email address: ni-somu@city.yokohama.jp

Return to the previous page

Page ID: 432-453-419

Menu of ward

  • LINE
  • Twitter
  • Instagram
  • YouTube