- Yokohama-shi Top Page
- Nishi Ward Top Page
- Disaster Prevention and anti-crime program
- Disaster Prevention and Disasters
- Partial suspension of operation of the Nishi Ward River Water Level Information Transmission System
Here's the text.
Partial suspension of operation of the Nishi Ward River Water Level Information Transmission System
Last update date November 22, 2023
Since 2005, Nishi Ward has installed and operated speakers at five locations along the river to alert local residents when water levels rise. This time, the operation of the speaker (one place) installed at Ishizaki Bridge will be temporarily suspended due to the construction of nearby facilities (Sakuragi pumping station). We apologize for any inconvenience this may cause, but we appreciate your understanding and cooperation.
1 Speaker to stop
One speaker installed at Ishizaki Bridge (on the site of Sakuragi Pumping Station)
※Four speakers other than Ishizaki Bridge will be operated as usual.
■Location map of speakers and water level gauges
2 Operational suspension period
From Friday, November 24, 2023 to around April 2024 (planned)
3 Response during operation suspension period
When evacuation information is issued due to the flood, information will be transmitted using area mail to mobile phones and on-board speakers using public relations vehicles.
For inquiries to this page
Nishi Ward General Affairs Department General Affairs Division
Phone: 045-320-8310
Phone: 045-320-8310
Fax: 045-322-9902
Email address: ni-somu@city.yokohama.jp
Page ID: 432-453-419