Sewerage self-financing construction

Last Updated July 18, 2024

It is construction that person except public sewer manager performs construction about sewer facilities on public roads at own expense after receiving approval of public sewer manager.
For example, a new residential land is created with a writing brush, etc., and a new mounting pipe is required when a built-for-sale house is built. In this case, the installation pipe will be constructed by self-financing construction (new construction). In addition, if you change the position of the existing mounting pipe due to the layout of the building, it will be self-financing work (removal / new construction).

Please select the construction of your own construction from a contractor (industry: civil engineering business) that has been licensed by the Construction Business Law. But about installation pipe construction, we can choose from drainage designation construction shop which the mayor of the sewer regulations Article 32 appointed.

Application for sewerage self-financing construction

You must submit an application for approval of construction of sewerage facilities to Public Works Office before construction, and obtain approval from The Mayor of Yokohama, the public sewerage administrator.

Application forms are distributed at each Public Works Office and other locations. Please contact Public Works Office for more information about required documents.

The following documents (1-6) are usually attached to the mounting pipe. Please contact us for more information.

  1. Guide map (copy of house map, etc.)
  2. Layout diagram (with the exterior shape of the building and the position of the mounting pipe)
  3. Floor plan (The extension of the mounting pipe is entered from the inside of the basin to the center of the main pipe. No. 1 decimal point (in meters)
    Refer to the standard diagram of mounting pipe laying in Yokohama City Sewerage Bureau Design Standard Map
  4. Longitudinal drawing (The extension of the mounting pipe is entered from the inside of the basin to the center of the main pipe.) No. 1 decimal point (in meters)
    Refer to the standard diagram of mounting pipe laying in Yokohama City Sewerage Bureau Design Standard Map
  5. Excavation cross section (commensurate with the pavement type at the location)
  6. A copy of the drainage equipment plan confirmation application (a set of duplicates with confirmation marks).

If drainage construction does not occur, or if a drainage contractor has not been determined due to development activities, please contact Public Works Office about required documents.

Notification of start of sewerage self-financing construction

Those who have received a letter of approval from Public Works Office must submit to Public Works Office along with the schedule to registration form when they start construction work.

In case of delay

When we are going to extend construction period for unavoidable reason, we must submit construction period extension registration form such as construction of public sewer facility to the mayor with schedule. (Yokohama City Sewerage Ordinance, Article 17, Paragraph 5)
The "unavoidable reason" herein may, in principle, be as follows.

  • In cases where negotiations with local residents are difficult and construction is delayed.
  • When construction is delayed due to relocation, cut, protection, etc. of underground buried objects.
  • When an unexpected accident occurs at the design stage of soft ground, spring water, etc., resulting in a change in the construction method, etc., and construction is delayed due to this.
  • When construction is delayed due to natural disasters, land changes, etc.

If there is a change

When we change construction periods for unavoidable reason or are going to change facility contents at the time of approval application, we must submit change registration form such as public sewer facility construction to the mayor. Please check with Public Works Office for necessary drawings.
The handling when we are going to change facility contents at the time of application for approval is as follows in principle. However, please consult with Public Works Office in advance about minor changes.

Table
Details of changesProcedure
Those that require submission of change registration formWhat should be corrected in the book
(Minor changes)
Area of catchment area and pipe diameter of main pipe, pipe type
Change of area of 10% or more
×
Change of area less than 10%
Extension of the main pipeIncrease or decrease of 10 meters or moreChange less than 10 meters
Construction method×
GradientWhen the difference from the planned gradient is 20% or moreIf the difference from the planned gradient is less than 20%
Planned bottom heightWhen the difference between the pipe bottom height of the original plan is 20 cm or more, or the soil cover is shallowWhen the difference from the pipe bottom height of the original plan is less than 20 cm and the soil cover becomes deeper.
Private use position of pipe pit, rainwater masu×
Water collection, location and quantity of connection, pipe type of mounting pipe, extension×

Notification of completion and inspection

The applicant must submit the completed registration form to the responsible Public Works Office as soon as the completion of the construction of public sewerage facilities.

Please attach the following documents (1-5) for the mounting pipe.

  1. Guide map
  2. Ledger offset diagram
  3. Floor plan (The extension of the mounting pipe is entered from the inside of the basin to the center of the main pipe. No. 1 decimal point (in meters)
  4. Longitudinal drawing (The extension of the mounting pipe is entered from the inside of the basin to the center of the main pipe.) No. 1 decimal point (in meters)
  5. Photographs of construction

If there is no defect in the contents of the self-financing construction (if it can be taken over as a facility in Yokohama City), after the completion inspection, a certificate of completion inspection (with the mayor's seal or Public Works Office's seal stamped) will be issued to the applicant. I will do it.

Application download

Application for sewerage self-financing construction

Inquiries to this page

Midori Ward Green Public Works Office

Telephone: 045-981-2100

Telephone: 045-981-2100

Fax: 045-981-2112

Email address: md-doboku@city.yokohama.lg.jp

Return to the previous page

Page ID: 183-839-648

Menu of ward

  • LINE
  • Twitter
  • YouTube