Outline of Nishiya Water Purification Plant Facility

Last Updated March 15, 2022

Nishiya Water Purification Plant Nishiya Purification Plant

The Nishiya Water Purification Plant uses Sagamiko as its water source. Founded in 1915, the water purification capacity at that time was 73,360 m3 per day. After that, several remodelings were carried out, and with the completion of the 8th expansion work in 1980, the current water purification capacity has reached 356,000 m3 per day (about 1.1 cups of Yokohama Stadium). The purified water is supplied mainly to Tsurumi, Kanagawa, West, Naka, South, and Hodogaya wards.

outline of Nishiya Water Purification Plant
Location 522, Kawashimacho, Hodogaya-ku, Yokohama-shi
Site area 151,668m2
Standard processing capacity 356,000m3/day
Water sources Sagamiko
Sinking pond Side flow type (with slope plate) 90,000m3/day × 4 pond
Filtration pond No. 1 rapid filtration pond 116m2 × 10 pond No. 2 Rapid filtration pond 90m2 x 16 pond
Distribution reservoir Total effective water storage capacity 180,500m3 (currently suspended No. 1)
Wastewater treatment facilities Processing capacity 7.6t/day (dry weight)

Nishiya water purification plant floor plan (may be different from the actual one because it is under Nishiya redevelopment project.)

Floor plan

Mechanisms of Water Treatment Plant

1st item Mizui

This is where Sagamiko raw water is first to arrive at the water purification plant. The amount of water is adjusted here and sent to the sinking pond.
Riku Mizui

2 Sinking Pond

Agglomerator (poly aluminum chloride) is injected into the raw water, and the suspended matter becomes a large particle lump (flock) and settles down.
Sinking pond

3 Filtration pond

Fine suspended matter that has not been removed in the sinking pond are removed through a layer of sand and gravel.
Filtration pond

4 Reservoir

Tap water is stored and the amount of water is adjusted according to water demand. In addition, the upper part of the No. 3 Reservoir is lent to Yokohama FC as a soccer ground.
Distribution reservoir

5 Cleaning water tank

This water tank is used to clean the filter pond.
(water storage capacity: 1,000 m3)
Cleaning water tank

6 Wastewater Treatment

The wastewater after the water purification process is concentrated and separated into water and sludge by a dehydrator. In addition, the wastewater treatment pond is covered to generate solar power.
Wastewater treatment

7 Water Treatment Experimental Facility

We are conducting research on new water purification treatment technology.
Water treatment experimental facilities

8 Registered Cultural Properties

Four reservoirs, one reservoir water purification Inoue house, and one distribution reservoir water distribution Inoue house built in 1915 became registered cultural properties of the country in June 1997.
Registered Cultural Properties

9 Freshly made drinking fountain

A drinking fountain has been set up so that visitors to the water purification plant can drink freshly made water.
Freshly made drinking fountain

Hamapyeong


For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.

Water Works Bureau Customer Service Center

Phone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.

For inquiries to this page

Water Works Bureau Water Purification Plant Nishiya Water Purification Plant

Phone: 045-371-5335

Phone: 045-371-5335

Fax: 045-371-8969

Email address: su-nishiyajosui@city.yokohama.jp

Return to the previous page

Page ID: 189-490-609

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews