Overview of Nishiya Water Purification Plant Facilities

Last Updated October 15, 2024

Nishiya Water Purification Plant Nishiya Water Purification Plant

The Nishiya Water Purification Plant uses Sagamiko as its water source. Founded in 1915, the water purification capacity at that time was 73,360 cubic meters per day. Following the completion of the eighth expansion work in 1980, the current water purification capacity is 356,000 cubic meters per day (about 1.1 cups of Yokohama Stadium). The purified water is mainly supplied to Tsurumi, Kanagawa, West, Middle, South, and Hodogaya wards.

outline of Nishiya Water Purification Plant
Location: 522, Kawashimacho, Hodogaya-ku, Yokohama-shi
Site area 151,668 square meters
Standard processing capacity 356,000 cubic meters per day
Water source Sagamiko
Sinking pond Sidestream type (with slope plate) 4 ponds of 90,000 cubic meters per day
Filtration pond The first rapid filtration pond has 10 ponds of 116 square meters, and the second rapid filtration pond has 16 ponds of 90 square meters.
Reservoir Total effective water storage 180,500 cubic meters (currently No. 1 Reservoir is suspended)
Wastewater treatment facilities Processing capacity is 7,600 kilograms per day (dry weight)

Nishiya water purification plant floor plan (it may be different from actual because it is under Nishiya redevelopment project.)

No. 1 Mizui

This is where the raw water of Sagamiko arrives at the water purification plant first. The amount of water is adjusted here and sent to the sinking pond.
Arriving Mizui

2 Sinking Pond

A flocculant (polyaluminum chloride) is injected into raw water, and the suspended matter becomes a large lump (flock) and settles.
Sinking pond

3 filtration pond

Fine suspended matter that was not removed in the sinking pond is removed through a layer of sand and gravel.
Filtration pond

4 Reservoir

Tap water is stored and the amount of water is adjusted according to water demand. The upper part of Reservoir No. 3 is lent to Yokohama FC as a soccer ground.
Reservoir

5 Washing tank

This is an aquarium for cleaning the filter pond.
(Reservation capacity of 1,000 cubic meters)
Washing tank

6 Wastewater treatment

The wastewater after the water purification treatment is concentrated and separated into water and sludge by a dehydrator. In addition, solar power generation is carried out by covering the wastewater treatment pond.
Wastewater treatment

7 Water Treatment Experimental Facility

We are conducting research and research on new water treatment technologies.
Water treatment experiment facility

8 Registered Cultural Properties

In June 1997, four reservoirs, one reservoir water purification Inoueya, and one reservoir reservoir water distribution Inoueya built in 1915 became registered cultural properties of the country.
Registered Cultural Properties

9 Fresh drinking fountain

We have set up a drinking fountain so that visitors to the water purification plant can drink the freshly made water.
Fresh drinking fountain

Pyeong


For inquiries regarding water supply, please contact the Water Works Bureau Customer Service Center.

Water Works Bureau Customer Service Center

Telephone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.

Inquiries to this page

Nishiya Water Purification Plant, Water Works Bureau Water Purification Department

Telephone: 045-371-5335

Telephone: 045-371-5335

Fax: 045-371-8969

Email address: su-nishiyajosui@city.yokohama.lg.jp

Return to the previous page

Page ID: 189-490-609

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews