Menu

Close

Here's the text.

Yumegaoka, Izumi

Last Updated January 5, 2024

Notice

Current status of district

The area around Shimo-Iida Station on the Yokohama Municipal Subway and Yumegaoka Station on the Sotetsu Izumino Line are positioned as districts that promote "initiatives for the formation of urban areas that foster new liveliness and exchanges" in the Izumi Ward Plan.
In this district, the "Izumi Denen Daiichi District Land Readjustment Preparatory Association" was established in 1999, and local landowners played a central role, and the study of town development using the land readjustment method implemented by the union, and further commercialization. In December 2007, the "Izumi Yumegaoka Land Readjustment Union Establishment Preparatory Meeting" was launched to conduct specific examinations. After that, we proceeded with the study and consensus building, and in September 2013, the maintenance of urban infrastructure facilities such as station squares and land use utilizing the location characteristics were finalized. On June 13, 2014, "transfer to urbanization area" and "land readjustment project" by union enforcement were decided on city planning.
On August 15, 2014, the establishment of "Izumi Yumegaoka Land Readjustment Association" was approved.
In addition, the association examined a detailed future land use plan and compiled the contents. According to this land use plan, "Izumi Yumegaoka district city planning" was decided on March 15, 2018.

Outline of Business

Business Overview
Business NameYokohama International Port Capital Construction Project Izumi Yumegaoka District Land Readjustment Project
EnforcerIzumi-Yumegaoka Land Readjustment Union
Enforcement areaShimoiida-cho, Izumi-cho and Izumi-Chuo-Minami 5-chome, Izumi-ku
Operating areaApprox. 23.9ha
Effective periodFY2014 to FY6 (including clearing period)
Total operating expensesApprox. 11.7 billion yen

Public facilities
Plan

  • Widening maintenance (width 18-21m) of city planning road 3.4.3 ring Route 4 (width 18-21m)
  • Maintenance of city planning roads 3.4.54 Shimo-Iida Line maintenance (width 14-19m) (approximately 3,900 square meters including maintenance of station square)
  • Maintenance of divided roads (width 4.5 to 11.5m)
  • Maintenance of parks, maintenance of rainwater regulating ponds, etc.
OthersIzumi-Yumegaoka Land Readjustment Association Secretariat
Phone: 045(800)5722

(The plan may be reviewed depending on the progress of the business.)

Enforcement area map
Click here to open the enforcement area map (PDF: 306KB)

District Planning System
Click here to move to the plan / plan drawing.

Article 76 Administrative Procedures

In the land readjustment project area, procedures based on Article 76 of the Land Readjustment Act are required when changing land characteristics or constructing, renovating or expanding buildings and other structures.
Please refer to the following administrative procedures and attach required documents to the permission application form and apply to the Urban Development Bureau Urban Area Maintenance Promotion Section.

Procedure Guidelines

Form for application documents

Form for application documents
ProcedureStyle
Permit application (No. 1 style)PDF(PDF:60KB)WORD (word: 37KB)
Notification of completion (No. 4 style)PDF(PDF:42KB)WORD (word: 34KB)
Withdrawal Form (No. 5)PDF(PDF:43KB)WORD (word: 21KB)
Form (No. 6 style)PDF(PDF:43KB)WORD (word: 21KB)
Notification of change (No. 7 style)PDF(PDF:42KB)WORD (word: 21KB)

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Urban Development Division, Urban Development Bureau Urban Development Department

Phone: 045-671-4009

Phone: 045-671-4009

Fax: 045-664-7694

Email address: tb-seibisuishin@city.yokohama.jp

Return to the previous page

Page ID: 244-478-286

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews