Here's the text.
Yumegaoka, Izumi
Last Updated January 5, 2024
Notice
- "About general inspection of business plan (the sixth change) of land readjustment project (PDF: 215KB)
- About "establishment authorization of Izumi Yumegaoka land readjustment association" (PDF: 539KB)
- About "Izumi Yumegaoka district land readjustment project city planning decision" (PDF: 555KB)
Current status of district
The area around Shimo-Iida Station on the Yokohama Municipal Subway and Yumegaoka Station on the Sotetsu Izumino Line are positioned as districts that promote "initiatives for the formation of urban areas that foster new liveliness and exchanges" in the Izumi Ward Plan.
In this district, the "Izumi Denen Daiichi District Land Readjustment Preparatory Association" was established in 1999, and local landowners played a central role, and the study of town development using the land readjustment method implemented by the union, and further commercialization. In December 2007, the "Izumi Yumegaoka Land Readjustment Union Establishment Preparatory Meeting" was launched to conduct specific examinations. After that, we proceeded with the study and consensus building, and in September 2013, the maintenance of urban infrastructure facilities such as station squares and land use utilizing the location characteristics were finalized. On June 13, 2014, "transfer to urbanization area" and "land readjustment project" by union enforcement were decided on city planning.
On August 15, 2014, the establishment of "Izumi Yumegaoka Land Readjustment Association" was approved.
In addition, the association examined a detailed future land use plan and compiled the contents. According to this land use plan, "Izumi Yumegaoka district city planning" was decided on March 15, 2018.
Outline of Business
Business Name | Yokohama International Port Capital Construction Project Izumi Yumegaoka District Land Readjustment Project |
---|---|
Enforcer | Izumi-Yumegaoka Land Readjustment Union |
Enforcement area | Shimoiida-cho, Izumi-cho and Izumi-Chuo-Minami 5-chome, Izumi-ku |
Operating area | Approx. 23.9ha |
Effective period | FY2014 to FY6 (including clearing period) |
Total operating expenses | Approx. 11.7 billion yen |
Public facilities |
|
Others | Izumi-Yumegaoka Land Readjustment Association Secretariat Phone: 045(800)5722 |
(The plan may be reviewed depending on the progress of the business.)
Enforcement area map
Click here to open the enforcement area map (PDF: 306KB)
District Planning System
Click here to move to the plan / plan drawing.
Article 76 Administrative Procedures
In the land readjustment project area, procedures based on Article 76 of the Land Readjustment Act are required when changing land characteristics or constructing, renovating or expanding buildings and other structures.
Please refer to the following administrative procedures and attach required documents to the permission application form and apply to the Urban Development Bureau Urban Area Maintenance Promotion Section.
Procedure Guidelines
- Land Readjustment Act Article 76 Administrative Procedures (PDF: 297KB)
- List of required documents (PDF: 124KB)
Form for application documents
Procedure | Style | |
---|---|---|
Permit application (No. 1 style) | PDF(PDF:60KB) | WORD (word: 37KB) |
Notification of completion (No. 4 style) | PDF(PDF:42KB) | WORD (word: 34KB) |
Withdrawal Form (No. 5) | PDF(PDF:43KB) | WORD (word: 21KB) |
Form (No. 6 style) | PDF(PDF:43KB) | WORD (word: 21KB) |
Notification of change (No. 7 style) | PDF(PDF:42KB) | WORD (word: 21KB) |
In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
For inquiries to this page
Urban Development Division, Urban Development Bureau Urban Development Department
Phone: 045-671-4009
Phone: 045-671-4009
Fax: 045-664-7694
Email address: tb-seibisuishin@city.yokohama.jp
Page ID: 244-478-286