Menu

Close

Here's the text.

Sludge treatment and effective utilization PFI business

Last Updated July 20, 2022

Topic

March 2022 With the completion of the renewal of the sludge incinerator through this project and the completion of all facilities including sludge fuel conversion facilities and improved soil plants that have already started operation, a switch-on ceremony was held on Wednesday, June 15, 2022. The ceremony was held as one of the commemorative events of "150 years of introduction of modern sewerage in Yokohama / 60 years of sewage treatment start".

Opening movie thumbnail
▲Opening Movie (YouTube)

2D code
You can also see it from the 2D code.

Reduce greenhouse gas emissions by approximately 8,200 tons-CO2 years! Completed construction of Hokubu Sludge Treatment Plant sludge treatment and effective use facility!

Business Overview

 Yokohama City collects sludge generated during the process of treating sewage at two sludge recycling centers in the city. We have been working to make effective use of resources, such as effectively utilizing biogas and sludge incineration ash generated during the treatment process.
 In this project, along with the renewal of sludge incinerators and improved soil plants in Hokubu Sludge Treatment Plant, the treatment process was added to incineration to promote measures against global warming and further effective utilization of resources. ※In addition to maintaining 1, maintenance and operation will be performed, including the improved soil plant currently operated by the PFI project.
 In carrying out the project, it will be implemented in a PFI project that can utilize private technical capabilities and funds.
*1 A facility that manufactures bio-derived fuels that replace fossil fuels using sludge generated during the sewage treatment process as raw materials. The conversion of the system from incineration to the production of fuel chemicals is expected to significantly reduce greenhouse gases generated during the sludge incineration process.

Business name

Hokubu Sludge Treatment Plant Sludge Treatment and Effective Utilization Project

Business Purpose

 The purpose of this project is to renew sludge incinerators and improved soil plants, and to use fuel conversion facilities for effective use of products generated during the final process of sewage treatment from the viewpoint of global warming countermeasures and effective use of resources. The purpose of this project is to maintain and manage sludge incinerators and improved soil plants. In addition, in implementing the project, the project will be more economical and consider reducing the environmental impact by utilizing the unique technologies and ingenuity of private businesses.

Business location

In Hokubu Sludge Treatment Plant, 1-6 Suehirocho, Tsurumi-ku, Yokohama
In the 8 improved soil plant at 1-6 Suehirocho, Tsurumi-ku, Yokohama

Business schedule (planned)

April 7, 2015
Announcement of implementation policy, required standard (draft), and monitoring basic plan (draft)
April 7-20, 2015
Acceptance of questions and opinions regarding the implementation policy, requirements standard (draft), monitoring basic plan (draft)
May 14, 2015
Announcement of answers to questions and opinions regarding implementation policies, etc.
July 9, 2015
Selection and publication of specific businesses
July 14, 2015
Tender notice, bid manual, required standard book, monitoring basic plan, successful bidder determination standard, collection of styles,
Publication of basic agreement (draft) and business contract (draft)
August 19, 2015
Announcement of answer to questions regarding bid manuals, etc. (Primary)
September 25, 2015
Announcement of answer to questions regarding bid manuals (secondary)
October 9-16, 2015
Acceptance of bid participation qualification confirmation application
November 13-20, 2015
Acceptance of bid documents
February 5, 2016
Announcement of successful bidders
March 29, 2016
Conclusion of basic agreement with successful bidder
August 31, 2016
Conclusion of business contracts

Announcement of Implementation Policy, etc. (April 7, 2015)

pdf image Implementation Policy (PDF: 640KB)

pdf image Requirement standard (draft) (PDF: 8,363KB)

pdf image Basic Monitoring Plan (draft) (PDF: 588KB)

xls image Form -1 (Excel: 25KB)

xls image Form -2 (Excel: 29KB)

xls image Form -3 (Excel: 29KB)

Announcement of answers to questions regarding implementation policies, etc. (May 14, 2015)

pdf image Answers to questions regarding the implementation policy (PDF: 209KB)

pdf image Answer to questions regarding the required standard (draft) (PDF: 287KB)

pdf image Basic Monitoring Plan (draft) Answers to questions about others (PDF: 131KB)

Announcement of selection of specific business (July 9, 2015)

pdf image Selection of specific business (PDF: 481KB)

Announcement of tender manuals, etc. (July 14, 2015)

pdf image Bid manual (PDF: 689KB)

pdf image Requirement Standards (PDF: 8,758KB)

pdf image Basic Monitoring Plan (PDF: 576KB)

pdf image Successful bidder determination criteria (PDF: 426KB)

pdf image Collection of styles (text) (PDF: 272KB)

doc image Collection of styles (word-related) (word: 472KB)

xls image Collection of styles (excel: 176KB)

pdf image Basic Agreement (draft) (PDF: 291KB)

pdf image Business contract (draft) (PDF: 583KB)

Answer of question (primary) about bid manuals and publication of revised version of bid manuals (August 19, 2015)

pdf image Answer of question (primary) about bid manual (PDF: 210KB)

pdf image Answer of question (primary) about requirements standard book (PDF: 245KB)

pdf image Answer of question (primary) about monitoring basic plan (PDF: 116KB)

pdf image Answer of question (primary) about collection of styles (PDF: 170KB)

pdf image Answer of question (primary) about basic agreement (draft) (PDF: 120KB)

pdf image Answer of question (primary) about business contract (draft) (PDF: 194KB)

pdf image No. 3 incinerator inspection and repair history (PDF: 3,528KB)

*There is no announcement this time about the answer to the question regarding the winning bidder determination criteria.

pdf image Basic Monitoring Plan (revised version) (PDF: 394KB)

pdf image Collection of styles (revised version) (PDF: 223KB)

doc image Collection of styles (word related) (revised version) (word: 471KB)

xls image Collection of styles (excel) (revised version) (Excel: 177KB)

pdf image Business contract (draft) (revised version) (PDF: 423KB)

pdf image Monitoring Basic Plan Change Comparison Table (PDF: 116KB)

Answer to questions (secondary) regarding bid manuals, etc. and publication of revised versions of bid manuals, etc. (September 25, 2015)

pdf image Answer of question (secondary) about bid manual (PDF: 137KB)

pdf image Answer of question (secondary) about requirements standard book (PDF: 166KB)

pdf image Answer of question (secondary) about monitoring basic plan (PDF: 108KB)

pdf image Answer of question (secondary) about collection of styles (PDF: 154KB)

pdf image Answer of question (secondary) about business contract (draft) (PDF: 174KB)

pdf image Bid manual (revised version) (PDF: 456KB)

pdf image Business contract (draft) (revised version) (PDF: 423KB)

pdf image Bid manual change comparison table (for the second) (PDF: 108KB)

Announcement of report on the determination of successful bidders (February 5, 2016)

 As we received selection of the best proposer by utilization business examination committee such as Yokohama citizen funds and decided successful bidder, we announce as follows.

pdf image Report on the determination of the successful bidder (PDF: 523KB)

 We were conducting negotiations for a business contract with a group led by JFE Engineering Co., Ltd., which was determined as the winning bidder, but we have concluded a business contract because the consultation has been completed.

Overview of Business Contracts
ItemsContents
The other party of the business contractKazutoshi Ohashi, Representative Director, Yokohama Bay Link Co., Ltd.
Contract amount41,864,793,142 yen (tax included)
Contract periodFrom August 31, 2016 to March 31, 2016
Processing methodLow-temperature carbonized fuel conversion system, circulating fluidized bed type
Planned amount124,000t/year (400t/day, 310 days a year)

pdf image About contents of business contract (PDF: 175KB)

Secretariat

City of Yokohama, Environmental Planning Bureau
Sewerage Facilities Department Sewerage Equipment Section
〒231-0005 6-50-10 Honcho, Naka-ku, Yokohama City Hall, 28th floor
TEL 045-671-2852
FAX 045-550-4094

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Sewer River Bureau Sewerage Facilities Department Equipment Section

Telephone: 045-671-2851

Telephone: 045-671-2851

Fax: 045-550-4094

Email address: gk-setsubi@city.yokohama.lg.jp

Return to the previous page

Page ID: 637-482-884

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews