Kanazawa Wastewater Treatment Plant

Last Updated July 25, 2024

Photographs of Kanazawa Wastewater Treatment Plant

Overview

Resize

Kanazawa Wastewater Treatment Plant is a water reclamation center constructed as part of a sewerage project based on the Yokohama International Port City Construction Project.

It started operation in October 1979 (Showa 54) as the second water reclamation center.
In April 2009, the adjacent Nambu Sludge Treatment Plant was integrated to unify management, and the organization name was changed to Nambu Sewerage Center on April 1, 2010.

The Kanazawa Ward area and Isogo Ward and Konan Ward areas have been designated as separate and combined sewers.

Sewage flows directly or flows into the main water reclamation center via the Kanazawa pumping station, and advanced treatment by the A2O method (high-grade treatment by the standard sludge activity method in some series) is carried out, and after sterilization, from Tomioka River to Tokyo Bay Will be released.


  • Site area: 129,440㎡
  • Planned processing area: 4,913㏊
  • Planned population: 381,600
  • Planned processing capacity: 221,900㎥
  • Sludge treatment: Compressed to Nambu Sludge Treatment Plant for processing

Kanazawa Wastewater Treatment Plant Pamphlet (PDF: 2,715KB)

Characteristics

  1. Water treatment is advanced treatment using the anaerobic-aerobic-aerobic method (A2O method) for the purpose of removing nitrogen and phosphorus. (Excluding some series.)
  2. We have facilities for reusing treated water and are used as cooling water for machinery and cleaning water for in-house. In addition, water is supplied to neighboring Nambu Sludge Treatment Plant and Resources and Waste Recycling Bureau Kanazawa plants as miscellaneous water.
  3. Jurisdiction facilities include the Kanazawa pumping station (sewage relay / rainwater drainage pumping station) and the Rokuura pumping station (rainwater drainage pumping station). In each case, a remote monitoring control device is used to operate and monitor from the water reclamation center to save labor.
  4. In the Torihama and Fukuura districts, there are Torihama Daiichi Plant Drainage Treatment Plant and Fukuura Plant Drainage Treatment Plant as pre-treatment facilities for factory drainage for the purpose of pollution control in the city, and plating from companies that use them. We treat wastewater jointly.
    (The Torihama Daini Plant Drainage Treatment Plant was abolished on March 31, 2013.)

Pumping stations under jurisdiction

Kanazawa Pumping Station

Photographs of Kanazawa Pumping Station

  • Site area: 14,710㎡
  • Planned drainage area: 390㏊
  • Planned drainage capacity: 65.1m3 per second
  • Start of operation: March, 1981

Rokuura Pumping Station

Photograph of Rokuura Pumping Station

  • Site area: 3,000㎡
  • Planned drainage area: 102㏊
  • Planned drainage capacity: 11.4m3 per second
  • Start of operation: November, 1973

Pretreatment facilities for factory wastewater

Torihama Daiichi Plant Drainage Treatment Plant

Photo of Torihama Daiichi Plant Drainage Treatment Plant

  • Ciane-based wastewater plan treatment volume: 60 per day㎥
  • Chromium-alkaline wastewater treatment plan treatment volume: 340 per day㎥
  • Public sewer system: August, 1978
  • Start of operation: May, 1973

Fukuura Plant Drainage Treatment Plant

Photos of the Fukuura Plant Drainage Treatment Plant

  • Ciane-based wastewater plan treatment volume: 130 per day㎥
  • Planned chromium-based wastewater treatment volume: 75 per day㎥
  • Projected alkaline wastewater treatment volume: 1,320 per day㎥
  • Public sewer system: April, 1998
  • Start of operation: May, 1982

Access

If you are coming from Namikikita Station on the Kanazawa Seaside Line

Kanazawa Wastewater Treatment Plant is a 5-minute walk from Namikikita Station on the seaside line.

Photo of the ticket gate at Namiki-Kita Station

(1) Exit the ticket gate at the seaside line "Namikikita" station and proceed to the left.


Photo on the 2 stairs at the exit of Namiki-Kita Station

(2) Go down the stairs of "Exit 2".


Photo below the 2 stairs at the exit of Namiki-Kita Station

(3) After going down the stairs, go straight to the intersection.


Photo of the intersection of Koura 1-chome

(4) Please go to the right at the intersection of "Koura 1-chome".


Photograph of Main Gate of Kanazawa Wastewater Treatment Plant

(5) After a while, you will reach the main gate of Kanazawa Wastewater Treatment Plant. Thank you very much. The office is on the second floor up the stairs.


You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Sewer River Bureau Sewerage Facilities Department Nambu Sewerage Center

Telephone: 045-773-3096

Telephone: 045-773-3096

Fax: 045-776-1689

Email address: gk-nambugesuido@city.yokohama.lg.jp