Introduction of sewerage office construction

Last Updated December 8, 2021

About each construction

Shield construction

This construction method is often used for relatively large and long tunnel construction.
Tunnels are drilled while digging a steel excavator called shield machines underground, and assembling concrete and steel blocks called segments are assembled behind to create tunnel walls. If this is the case, the surface is bumpy, so the inside may be rounded with concrete. A shaft is required to carry in shield machines and removal of earth and sand.

Reference photo
Shield machine
(Rotate the tip (blue part) to dig the soil.)

After assembling segments
(Primary Coverage)

Shield machine


1



Promotion work

Excavation is made by a digging machine that digs from the starting shaft, connecting a propulsion pipe behind the digging machine, and pushing the propulsion pipe into the ground with a jack.
A shaft is required for bringing in a digging machine and removing earth and sand.

Reference photo
Shaft construction
(While drilling the soil with a liner plate etc. while excavating the soil.)

Drilling machine

Propulsion machines


2


Drilling status
(Press the tube is pushed into the ground with a jack.)
Progress of jurisdiction

Status of promotion


Progress of jurisdiction



Construction of rainwater regulating pond (construction work of Tachibananooka multipurpose rainwater regulating pond construction work (part 9))

We carry out rainwater regulating pond construction work to temporarily store rainwater and reduce inundation damage.
Excavation of earth and sand, install a concrete box-shaped structure (precast block), and then backfilling.

Reference photo
SurveyingPanoramic viewDrilling work

We conduct surveys using drones.

This is a photo of the panoramic view.

Drilling work

Placement of foundation concreteCompletion of foundation concretePrecast block installation status

Placement of foundation concrete

Completion of foundation concrete

Precast block installation status

Precast block installation completedCompleted construction of edge wallsInside the regulating pond

Precast block installation completed

Completed construction of edge walls

Inside the regulating pond


Construction of water treatment facilities

A large-scale concrete structure will be built to build sewage facilities.
Many types of work are required, such as earth retaining work, excavation work, reinforcing bars, formwork, and concrete work, and the construction period is also long.
Even after the structure is completed, equipment work will be carried out to install machines that treat sewage and construction work to build buildings on the ground (management buildings, etc.) will be performed.

Reference photo
Piling work
(The steel pipe that forms the basis of the structure is driven into the foundation.)
Earth retaining work (Yaita Works)
(Long iron plates are continuously embedded in the ground.)
Piling workSteel sheet pile construction
Earth retaining work
(It's a wall shape after hitting the sheet pile is finished.)
Drilling work
After casting steel sheet pileDrilling work
Reinforcing barsConcrete work
Reinforcing barsConcrete work

Anticorrosion work

Hydrogen sulfide is generated in a closed sewage treatment facility, and the concrete of the facility is gradually corroded.
In order to prevent corrosion, the concrete surface is coated with acid-resistant materials.
In existing facilities where corrosion has already progressed, the corroded concrete is cut, repaired with mortar, and then coated with corrosion-proof material.

Reference photo
DredgingLower cleaningDeterioration part removal
DredgingLower cleaningDeterioration part removal
Primer application before cross section repairCorrosion anticorrosion coating (section repair)Corrosion anticorrosion coating (primer application before base adjustment)
Primer application before cross section repairCross-section repairPrevious primer application before base adjustment
Corrosion anticorrosion coating (basement adjustment)Corrosion prevention coating (overcoating)Corrosion prevention coating (top)
Basement adjustmentOvercoating

Pipe rehabilitation work

We make new pipe in old sewer pipe and plan improvement of pipe and earthquake resistance.
It may be carried out at night when the amount of sewage is low.

Reference materials
Manufacturing
(A new material is wrapped around the surface of the old pipe.)
Supporters
(To prevent the new pipe from deforming the new tube.
We have installed materials to be reinforced.)

Manufacturing


Supporters


Back-filling work
(The mortar is injected between the old pipe and the surface material.)
Completed

Back-filling work


Completed


For inquiries to this page

Sewerage River Bureau Sewerage Pipeline subordinate water office

Phone: 045-337-3010

Phone: 045-337-3010

Fax: 045-337-3013

Email address: gk-gesuidojimusho@city.yokohama.lg.jp

Return to the previous page