Introduction of sewerage office construction
Last Updated December 8, 2021
About each construction
Shield construction
This construction method is often used for relatively large and long tunnel construction.
Tunnels are drilled while digging a steel excavator called shield machines underground, and assembling concrete and steel blocks called segments are assembled behind to create tunnel walls. If this is the case, the surface is bumpy, so the inside may be rounded with concrete. A shaft is required to carry in shield machines and removal of earth and sand.
Shield machine (Rotate the tip (blue part) to dig the soil.) | After assembling segments |
---|---|
| |
Promotion work
Excavation is made by a digging machine that digs from the starting shaft, connecting a propulsion pipe behind the digging machine, and pushing the propulsion pipe into the ground with a jack.
A shaft is required for bringing in a digging machine and removing earth and sand.
Shaft construction (While drilling the soil with a liner plate etc. while excavating the soil.) | Drilling machine |
---|---|
| |
Drilling status (Press the tube is pushed into the ground with a jack.) | Progress of jurisdiction |
| |
Construction of rainwater regulating pond (construction work of Tachibananooka multipurpose rainwater regulating pond construction work (part 9))
We carry out rainwater regulating pond construction work to temporarily store rainwater and reduce inundation damage.
Excavation of earth and sand, install a concrete box-shaped structure (precast block), and then backfilling.
Surveying | Panoramic view | Drilling work |
---|---|---|
Placement of foundation concrete | Completion of foundation concrete | Precast block installation status |
Precast block installation completed | Completed construction of edge walls | Inside the regulating pond |
Construction of water treatment facilities
A large-scale concrete structure will be built to build sewage facilities.
Many types of work are required, such as earth retaining work, excavation work, reinforcing bars, formwork, and concrete work, and the construction period is also long.
Even after the structure is completed, equipment work will be carried out to install machines that treat sewage and construction work to build buildings on the ground (management buildings, etc.) will be performed.
Piling work (The steel pipe that forms the basis of the structure is driven into the foundation.) | Earth retaining work (Yaita Works) (Long iron plates are continuously embedded in the ground.) |
---|---|
Earth retaining work (It's a wall shape after hitting the sheet pile is finished.) | Drilling work |
Reinforcing bars | Concrete work |
Anticorrosion work
Hydrogen sulfide is generated in a closed sewage treatment facility, and the concrete of the facility is gradually corroded.
In order to prevent corrosion, the concrete surface is coated with acid-resistant materials.
In existing facilities where corrosion has already progressed, the corroded concrete is cut, repaired with mortar, and then coated with corrosion-proof material.
Dredging | Lower cleaning | Deterioration part removal |
---|---|---|
Primer application before cross section repair | Corrosion anticorrosion coating (section repair) | Corrosion anticorrosion coating (primer application before base adjustment) |
Corrosion anticorrosion coating (basement adjustment) | Corrosion prevention coating (overcoating) | Corrosion prevention coating (top) |
Pipe rehabilitation work
We make new pipe in old sewer pipe and plan improvement of pipe and earthquake resistance.
It may be carried out at night when the amount of sewage is low.
Manufacturing (A new material is wrapped around the surface of the old pipe.) | Supporters (To prevent the new pipe from deforming the new tube. We have installed materials to be reinforced.) |
---|---|
| |
Back-filling work (The mortar is injected between the old pipe and the surface material.) | Completed |
| |
For inquiries to this page
Sewerage River Bureau Sewerage Pipeline subordinate water office
Phone: 045-337-3010
Phone: 045-337-3010
Fax: 045-337-3013
Email address: gk-gesuidojimusho@city.yokohama.lg.jp
Page ID: 835-173-184