- 86.Ex-post investigation plan for the Sotetsu Main Line (near Tsurugamine Station) Continuous Overpass Project (under construction)
Here's the text.
86.Ex-post investigation plan for the Sotetsu Main Line (near Tsurugamine Station) Continuous Overpass Project (under construction)
Last Updated November 15, 2022
[Post-survey plan (under construction)]
Please see the following PDF file for the Sotetsu Main Line (near Tsurugamine Station) Continuous Overpass Project Post-Survey Plan (under construction).
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Main part
Post-survey plan (under construction) (PDF: 15,564KB)
- Chapter 1 Plans for Target Businesses
- 1.1 Name and address of the b s operator
- 1.2 Name of the target business
- 1.3 Type and scale of the target business
- 1.4 Target project implementation area
- 1.5 Overview of the Target Business
- 1.6 Progress of Implementation of Target Projects
- 1.7 Construction plan for construction
- Chapter 2 Matters concerning the implementation of post-survey
- 2.1 Concept of post-survey
- 2.2 Items and methods of post-survey described in the evaluation report
- 2.3 Examination of matters related to the contents of the post-survey described in the evaluation report
- 2.4 When to conduct a post-survey and when to submit a post-survey result report
- 2.5 Trustee of post-survey
Remarks
- About map issued by Geographical Survey Institute used in PDF file
- Source: Geographical Survey Institute 25,000 1 Topographic map
- Created by processing electronic topographic map 25000 (GSI)
- If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.
Status of Procedures
For the procedure status of this project, please refer to “86. Sotetsu Main Line (near Tsurugamine Station) Continuous Overpass Project Environmental Impact Assessment Procedures”.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 275-625-640