Menu

Close

Here's the text.

86.Environmental Impact Assessment Report for the Sotetsu Main Line (near Tsurugamine Station) Continuous Overpass Project

Last Updated November 15, 2022

Environmental Impact Assessment Report

(Tentative name) Please see the following PDF file for the Sotetsu Main Line (near Tsurugamine Station) Continuous Overpass Business Environmental Impact Assessment Report.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.

Main part

  • First, Table of Contents
  • Chapter 1 Matters for which the contents of the preparation documents were changed by comprehensively examining the examination documents, etc.
  • Chapter 2 Plan contents of projects subject to city planning
    • 2.1 Overview of projects subject to city planning
    • 2.2 Purpose of Projects subject to city planning
    • 2.3 History of the Plan
    • 2.4 Contents of projects subject to city planning
    • 2.5 Global Warming Countermeasures
    • 2.6 conservation of Biodiversity
    • 2.7 Green conservation and Creation
    • 2.8 Construction plan
    • 2.9 Tsurugamine Station North Exit Area Town Development Plan
  • Chapter 3 Overview of Regions and Regional Characteristics
    • 3.1 Setting of surveyed areas
    • 3.2 Regional overview 
      • 3.2.1 Weather conditions
      • 3.2.2 Topography, geology, and ground conditions
      • 3.2.3 Water Cycle
      • 3.2.4 Plants and Animals
      • 3.2.5 Population and Industry Situation
      • 3.2.6 Land Use
      • 3.2.7 Transportation and Transportation
      • 3.2.8 Status of Public Facilities, etc.
      • 3.2.9 Status of Cultural Properties, etc.
      • 3.2.10 Pollution, etc.
      • 3.2.11 Situation of Disasters
      • 3.2.12 Status of Waste
      • 3.2.13 Status of laws and regulations
    • 3.3 Overview of regional characteristics in the surveyed areas, etc.
  • Chapter 4 Contents of consideration based on consideration guidelines
    • 4.1 Contents of consideration that we examined environmental information and consideration mayor opinion comprehensively and changed
    • 4.2 Overview of Environmental Information
    • 4.3 Opinion of the mayor listed in consideration mayor statement of position and opinion of city planning decision-maker
  • Chapter 5 Extracting Environmental Impact Factors and Selection of Environmental Impact Assessment Items
    • 5.1 Extraction of environmental impact factors
    • 5.2 Selection of environmental impact assessment items
  • Chapter 6 Surveys, Forecasts and Evaluations of Environmental Impact Assessment Items
    • 6.1 Greenhouse gas
    • 6.2 Biodiversity (animals)
    • 6.3 Biodiversity (plants)
    • 6.4 Biodiversity (ecosystem)
    • 6.5 Water circulation (underground water level)
    • 6.6 Water circulation (river form and flow rate)
    • 6.7 Waste and construction soil
    • 6.8 Air quality
    • 6.9 Water quality
    • 6.10 Noise
    • 6.11 Vibration
    • 6.12 Ground
    • 6.13 Safety (land stability)
    • 6.14 Safety (underground buried objects)
    • 6.15 Community (traffic congestion, pedestrian safety)
    • 6.16 Landscape
    • 6.17 Places for contact activities
  • Chapter 7 Comprehensive Assessment of Environmental Impacts
  • Chapter 8 Matters concerning the implementation of post-survey
    • 8.1 Concept of post-survey
    • 8.2 Selection of post-survey items
    • 8.3 Details of the post-survey
  • Chapter 9 Target Areas
  • Chapter 10 Opinions, Opinions, etc. on the Preparatory Document
    • 10.1 Preparatory briefing session holding situation, question, summary of opinion and answer of city planning decision-maker
    • 10.2 Summary of statement of position for preparation and opinion of city planning decision-maker
    • 10.3 Opinion of the mayor listed in examination book and opinion of city planning decision-maker
    • 10.4 Supplementary materials submitted to the examination committee
  • Chapter 11 Method Matters that comprehensively examined the mayor's statements of opinion, etc. and changed the contents of the method book
  • Chapter 12 Opinions, Opinions, etc. on Method Statement
    • 12.1 Method book briefing session holding situation, question, summary of opinion and explanation of company
    • 12.2 Summary of statement of position for method book and opinion of city planning decision-maker
    • 12.3 Method Opinion of the mayor listed in the mayor statement of position and opinion of city planning decision-maker

Materials

  • Contents
  • Chapter 1 Business Plan Related
    • 1.1 Global warming countermeasures (reduction of greenhouse gases resulting from the implementation of projects)
    • 1.2 Construction process
    • 1.3 Number of vehicles operated for construction
  • Chapter 2 Survey, Forecast and Evaluation
    • 2.1 Greenhouse gas
    • 2.2 Biodiversity (animals)
    • 2.3 Biodiversity (plants)
    • 2.4 Water circulation (underground water level)
    • 2.5 Air quality
    • 2.6 Noise
    • 2.7 Vibration
    • 2.8 Ground
    • 2.9 Community (traffic congestion, pedestrian safety)

Status of Procedures

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau

Telephone: 045-671-2495

Telephone: 045-671-2495

Fax: 045-663-7831

Email address: mk-eikyohyoka@city.yokohama.lg.jp

Return to the previous page

Page ID: 522-187-614

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews