- Yokohama-shi Top Page
- Living and Procedures
- Community Development and Environment
- Environmental Conservation
- Environmental Conservation Initiatives
- Environmental assessment
- Business in Yokohama City
- 42.Environmental Impact Assessment Procedure for Yokohama Shonan Road
- 42.Post-survey results report on the Yokohama Shonan Road Project (initial)
Here's the text.
42.Post-survey results report on the Yokohama Shonan Road Project (initial)
Last Updated January 27, 2023
Post-Survey Results Report (Initial)
About Yokohama Shonan road [from Taya-cho, Sakae-ku, Yokohama-shi Higashimata-cho, Totsuka-ku, Yokohama-shi] post-survey result report (initial), please see the following PDF file.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Main part
- Chapter 1 Business Plan
- 1.1 Name of the target business
- 1.2 Name and address of the business operator
- 1.2.1 Name of Business Operator
- 1.2.2 Address, a business operator
- 1.3 Outline of the target business
- 1.4 Regarding the timing of submission of the post-survey result report
- 1.5 Positioning of this report and future plans
- 1.6 Trustee of post-survey
- Chapter 2 Results of Post-Survey
- 2.1 Ex-post survey items
- 2.2 Pre-construction survey (Kojaku district)
- 2.2.1 Air pollution
- 2.2.2 Land subsidence
- 2.2.3 Plants and animals
- 2.2.4 Cultural assets
- 2.3 Pre-construction survey (tunnel area)
- 2.3.1 Air pollution
- 2.3.2 Land subsidence
- 2.3.3 Water elephant
- 2.3.4 Plants and animals
- 2.3.5 Cultural assets
- 2.4 Investigation during construction (initial) (Kojaku district)
- 2.4.1 Air pollution
- 2.4.2 Noise
- 2.4.3 Vibration
- 2.4.4 Land subsidence
- 2.4.5 Waste
- 2.4.6 Water elephant
- 2.4.7 Plants and animals
- 2.4.8 Local Communities
- 2.4.9 Cultural assets
- 2.5 During construction (initial) survey (tunnel area)
- 2.5.1 Air pollution
- 2.5.2 Land subsidence
- 2.5.3 Water elephant
- 2.5.4 Plants and animals
- 2.5.5 Cultural assets
Remarks
- About map issued by Geographical Survey Institute used in PDF file
- Source: Created by processing electronic topographic map 25000 (GSI)
- If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.
Status of Procedures
Please refer to “42. Yokohama Shonan Road Environmental Impact Assessment Procedure” for the status of procedures for this project.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 880-248-024