Menu

Close

Here's the text.

Boundary survey of roads, etc.

Last update date April 2, 2024

1.What is Boundary Survey?

Boundary survey is to clarify the boundaries between roads, rivers, and waterways (hereinafter referred to as "roadways, etc.") managed by Yokohama City and the land in contact with them. According to the boundary survey, when the boundary is undecided, the relevant landowner and the city witness to determine the boundary when the boundary is undecided, the boundary has already been determined, but the boundary mark is unclear at the site There is a "Boundary Restoration" to check again when it becomes.

The drawings that have been finalized and created in this way can be viewed in Public Works Office in each ward in the "Boundary Survey Map for Roads".※

Boundary surveys such as road waterways have been applied at the Public Works Office of each ward, but boundary surveys such as city boundaries are conducted by the Road Investigation Division, and this has been determined by the Road Investigation Division.

Application destination for boundary survey and drawing browsing destination
Classification of boundary survey Application destination for boundary survey and drawing browsing destination
Boundary survey of city roads and waterways (excluding city borders) Public Works Office in each ward ※
Boundary survey of city borders Road Investigation Division (city hall 22nd floor)
Boundary Marks Boundary Marks and Public Standard Point Maps (PDF: 851KB)

※About boundary investigation figure such as road waterways, we list in road ledger reading system sequentially, and, about 13 of 18 wards, city hall the second floor [Yokohama building information center] and city hall 22nd floor [road investigation section] section]. (As of January 30, 2024)
Q I would like to view the boundary survey map of roads and waterways.

2. About boundary investigation application such as road waterways of city border

When it becomes necessary to carry out boundary investigation in owner of land in contact with road waterway of city border, we submit the next documents to Road Investigation Division and apply.

(1) Boundary survey application (first style) such as roads and waterways (word: 44KB)

(2) Local guide map

(3) A copy of the official map near the application site (within three months from the date of issue, reflecting the local situation at the time of application)

(4) Land entry certificate or entry summary (issued within 3 months for the lot number of the application site)

(5) Application registration form (No. 2 style) (word: 44KB)

(6) Power of Attorney (when delegating the authority to witness and consent regarding the boundary survey to a person other than the applicant)

※Attachments etc. will be checked when submitting the application form, so you cannot apply by mail, fax, or e-mail.

※The consent of the owner of the land adjacent to the application With the registration form, the applicant shall explain the purpose of conducting a boundary survey with the owner of the adjacent land prior to the application, and obtain the consent of the witness. The document confirming this consent is "registration form consent of the owner of the application adjacent land". This confirms that you will respond to the witness consultation and do not agree to the boundaries.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Road and Highway Bureau Road Department Road Investigation Division

Phone: 045-671-2774

Phone: 045-671-2774

Fax: 045-550-4954

Email address: do-dorochosa@city.yokohama.jp

Return to the previous page

Page ID: 900-657-610

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews