Sagami Railway Main Line (Hoshikawa Station to Tennocho Station) Continuous Overpass Project

Last updated March 22, 2024

Sagami Railway Main Line (Hoshikawa Station to Tennocho Station) Continuous Overpass Project

We have summarized the effects of railway elevated maintenance!

We have created a pamphlet that summarizes the specific maintenance effects of the elevated railways.

Brochure
Brochure for the effect of railway overpass

After 19 years, the project has finally been completed! !

The related road was opened on March 31, 2022, and it was finally "Project Completed"!

Related roads such as the Hoshikawa Station Square and the Hoshikawa Stop Line, which were being promoted at the same time as the Sagami Railway Main Line (Hoshikawa Station-Tennocho Station) continuous grade separation project in 2002, were opened on March 31, 2022.
The opening of related roads will strengthen the traffic functions of the area, improve pedestrian safety and convenience, and maximize the effects of the continuous grade separation project.

Related Road Guide Map



Business Overview and Background

Business Overview

Business entity

Yokohama-shi

Effective body

Sagami Railway Co., Ltd.

Extension of enforcement

Sagami Railway Main Line approximately 1.9 km (near Tennocho Station-near Hoshikawa Station)

Structural model

Elevated system

Number of railroad crossings

9 locations

Business period

FY14 to FY2003 (completed)


The area around Tennocho Station and Hoshikawa Station are positioned as the center of Hodogaya Ward, and the future goal is to create a connected and integrated city that combines business, commerce, culture, exchange, administrative functions, etc. .
However, the Sagami Railway Main Line, which crossed the ward, caused chronic traffic congestion and regional divisions due to railroad crossings.
For this reason, in a section of about 1.9 km in length including Tennocho Station and Hoshikawa Station, a continuous grade separation project was implemented for the purpose of removing nine railroad crossings, including Tennocho Station and Hoshikawa Station, and improving the living environment by facilitating local traffic and integrating the area. We worked to eliminate railroad crossing accidents.
In addition, along with the elevated railways through the continuous grade separation project, Hoshikawa Station Square and surrounding roads have been improved as part of community development along the railway.
 

Business Overview


Process

2002

City planning decision, city planning business approval, construction start

2006

Completed relocation of the detention line to Nishiyokohama

2007

Temporary up line switching, Hoshikawa Station Temporary Line 4, Hoshikawa Station Temporary Free Passage and Temporary Station Building Service Start

2008

Hoshikawa Station Temporary Line 3 Switching

2009

Temporary down line, switchover, Hoshikawa Station Temporary Line No. 2

2010

Switching to the Temporary Line 1 at Hoshikawa Station and construction of the railway body structure

2016

Switching down viaduct

2018

Switching up viaduct

2021

Completion of related road opening projects


Hoshikawa-Tennocho

Please see the transition from the business section before the start of the business to the whole line elevated (2018).
Hoshikawa-Tennocho Imamachi (PDF: 8,422KB)

Starten News

As a tool in public relations activities, we issue milestones in business and construction in cooperation with the builder, Sagami Railway Co., Ltd.

Download Hoshiten News No. 41 (PDF: 1,718KB)

Batch download of Hoshiten News (first issue to 41) collectively (PDF: 36,081KB)

Contact information

Inquiries about business
Construction Division, City of Yokohama, Road and Highway Bureau Construction Department (in charge of railway crossing)
TEL: 045-671-2792 FAX: 045-663-8993

Inquiries about construction 
Construction Division, Sagami Railway Co., Ltd. Facility Department
TEL: 045-335-6733 FAX: 045-335-6735

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Construction Division, Road and Highway Bureau Construction Department (in charge of railway crossing)

Phone: 045-671-2792

Phone: 045-671-2792

Fax: 045-663-8993

Email address: do-tetsudou@city.yokohama.lg.jp

Return to the previous page

Page ID: 394-433-085

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews