Sotetsu Main Line (Hoshikawa Station-Tennocho Station) Continuous Overpass Project

Last Updated March 22, 2024

Sotetsu Main Line (Hoshikawa Station-Tennocho Station) Continuous Overpass Project

We have summarized the effects of railway elevated maintenance!

We have created a pamphlet that summarizes the specific maintenance effects of the elevated railways, so please take a look.

Brochure
Pamphlet for railway elevated maintenance

After 19 years, the project is finally completed! !

Related roads were opened on March 31, 2022, and finally "Business Completed"!

On March 31, 2022, related roads such as the Hoshikawa Station Station Square and the Hoshikawa Station Stop Line, which had been promoted at the same time as the start of the 2002 Sotetsu Main Line (Hoshikawa Station-Tennocho Station) continuous grade separation project, were opened. The business has been completed.
With the opening of related roads, the traffic functions in the area will be strengthened, pedestrian safety and convenience will be improved, and the effects of the continuous grade separation project will be maximized.

Related road map



Business Overview and Process

Business Overview

Business entity

Yokohama-shi

Enforced entities

Sagami Railway Co., Ltd.

Extension of enforcement

About 1.9 km on the Sotetsu Main Line (near Tennocho Station-near Hoshikawa Station)

Structural Model

Elevated system

Number of railroad crossings removed

9 locations

Business Period

FY2014 to FY2013 (completed)


The area around Tennocho Station and Hoshikawa Station is positioned as the center of Hodogaya Ward, and our future goal is to create a connected and integrated city that combines business, commerce, culture, exchange and administrative functions.
However, the Sotetsu Main Line, which crossed the ward, caused chronic traffic congestion and regional division due to railroad crossings.
For this reason, in a section of approximately 1.9 km, including Tennocho Station and Hoshikawa Station, we implemented a continuous grade separation project aimed at removing nine railroad crossings, improving the living environment by facilitating local traffic and integrating the area. Elimination of railroad crossing accidents.
In addition, along with the elevated railway through the continuous grade separation project, the Hoshikawa Station Square and surrounding roads have been developed as part of community development along the railway.
 

Business Overview


Process

2002

Decision of city planning, approval of city planning business, start of construction

2006

Completed relocation of the detention line to Nishiyokohama

2007

Temporary up line switching, Hoshikawa Station Temporary Line 4 switching, Hoshikawa Station Temporary Free Passage and Temporary Station Building Service Start

2008

Switching of Temporary Line 3 at Hoshikawa Station

2009

Temporary down line switching, Hoshikawa Station Temporary Line 2 switching

2010

Switch to Hoshikawa Station Temporary Line 1 and start construction of the main railway structure

2016

Switching underline viaducts

2018

Switching up line viaducts

2021

Completion of related road opening project


Hoshikawa-Tennocho nowadays

Please see the transition from before the start of the business section to the elevated entire line (2018).
Hoshikawa-Tennocho Imago (PDF: 8,422KB)

Starten News

As a tool for public relations activities, we issue milestones in business and construction in cooperation with the constructor, Sagami Railway Co., Ltd.

Download Hoshiten News No. 41 (PDF: 1,718KB)

Collective download of Hoshiten News (first issue to 41st) (PDF: 36,081KB)

Contact information

Inquiry about business
Construction Section of Construction Department, City of Yokohama, Road and Highway Bureau Construction Department
TEL: 045-671-2792 FAX: 045-663-8993

Inquiry about construction 
Construction Section, Sagami Railway Co., Ltd. Facility Department
TEL: 045-335-6733 FAX: 045-335-6735

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Construction Section of Construction Department, Road and Highway Bureau Construction Department

Telephone: 045-671-2792

Telephone: 045-671-2792

Fax: 045-663-8993

Email address: do-tetsudou@city.yokohama.lg.jp

Return to the previous page

Page ID: 394-433-085

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews