Construction by-products

Last Updated September 2, 2024

For those who have received orders for construction work ordered by Yokohama City

Disposal guidelines for construction by-products discharged from Motoichi construction

About registration of construction by-product information exchange system (COBRIS)

The construction of a contract amount of 1 million yen or more (tax included) that uses recycled resources ordered by Motoichi or generates construction by-products is operated by the Nihon Kensetsu Information Center (JACIC) (outside site). This is the work subject to registration of the "information exchange system (COBRIS)".

Responding to the revision of the Ministerial Ordinance of the Promotion of Effective Utilization of Resources

Following a large-scale landslide disaster that occurred in Atami City, Shizuoka Prefecture in July 2021, residential land development and specific embankment regulation law (embankment regulation law) were formulated. Various efforts are being made to prevent disasters associated with.
Along with this, as the ministerial ordinance of the Law for Promotion of Effective Utilization of Resources was revised as an approach on the generation side of construction-generated soil, the contractor of Motoichi ordering construction would like the following measures.

Documents related to the Construction By-product Information Exchange System (COBRIS)

For construction contracted on or after January 1, 2023, the contractor will post the "Recycled Resource Utilization Plan" and "Recycled Resource Utilization Promotion Plan" in an easy-to-see place at the construction site before carrying out earth and sand from the site. please.
In addition, for construction contracted on or after May 26, 2023, the contractor describes the status of procedures related to soil contamination measures when changing land characteristics, such as the permission of the embankment control law at the place where the construction is generated soil is carried out, and post it in an easy-to-see place on the construction site before carrying out earth and sand.

About document which we confirmed from primary export destination of earth and sand to final export destination

Create a document confirming from the primary export destination of earth and sand to the final export destination (excluding (1) to (3) below) and keep it for 5 years.
(1)Inter-construction diversion
(2)Places managed by the national or local governments (Daikoku Wharf Relay Station, Sachiura Relay Station, etc.)
(3)Stockyard (outside site) registered by the Minister of Land, Infrastructure, Transport and Tourism (Yokohama Improvement Land Center, etc.)
In addition, grant of "receipt" (PDF: 992KB) to manager of export destination (if the export destination is the construction site, prime contractor construction company pertaining to the construction site, etc.) Ask for and keep the receipt or a copy of it until 5 years have passed since the completion date of the construction.

For those who carry out construction soil more than 100m3 from outside the city to Yokohama city

In order to contribute to the formation of a sound recycling-oriented society by promoting the effective use of construction soil generated during construction work as a resource and preventing sediment-related disasters caused by improper landfill, It is necessary to provide information widely to those involved in construction work.
When carrying out more than 100 m3 of construction soil from public works sites outside Yokohama to Yokohama city, please fill out the form below and attach a map of the export route, and send it to the person in charge of the Green Environment Bureau Parks and Green Space Preservation Divisionrequired items.
[Download Form]

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Green Environment Bureau Park Green Area Parks and Green Space Preservation Division Construction Site

Telephone: 045-671-3692

Telephone: 045-671-3692

Fax: 045-664-2588

Email address: mk-hasseido@city.yokohama.lg.jp

Return to the previous page

Page ID: 122-858-903