[Results] [Public proposal proposal for specific procurement contracts] Renewable energy introduction projects at the Resources and Waste Recycling Bureau Shinmeidai disposal site and four other sites
Last Updated December 1, 2023
denryoku_proposal
Title
Renewable energy introduction projects at the Resources and Waste Recycling Bureau Shinmeidai disposal site and four other sites
Proposal results
Order information
Date of public notice
Eligibility
Events (electricity, etc.)
Location classification
Corporate size
Other Conditions
All of the following conditions shall be satisfied. In addition, we correspond to this when city demands presentation of document which can confirm that we meet qualification requirements. (1) to (8) must be satisfied by one representative company.
(1) Person who has registration of any of the following conditions in Yokohama-shi general competitive bidding qualified person list (article, trust) in Reiwa 5.6. In addition, if it has not yet been listed in the list of qualified general competitive bidding qualifications, but at the time of submitting the application form for participation, if you are currently applying for any of the following events, the date to identify the contract candidate By the time, it is deemed to be a registered person, provided that the registration has been completed.
A. “327: Maintenance of electrical equipment Subscription A: Indoor electricity”
B. “350: Other outsourcing, etc.” * concerning the installation or operation of energy equipment * must be described.
※ESCO Business, Virtual Power Plant (VPP) Business, Electric Power Sales Contract (PPA) Business, etc.
C “501: Electricity and City Gas Substance A: Electricity Supply”
(2) From the deadline for submitting the application form for participation (September 5, 2023) to the specific date of the contract candidate, suspension measures under the provisions of the "Summary of Measures for Suspension of Yokohama City Nomination (April 1, 2004)" Those who have not received
(3) Gangsters stipulated in Article 2, item 2 of the Yokohama City Gangster Exclusion Ordinance (December 2011 Yokohama City Ordinance No. 51), gangsters stipulated in item 4 of the same Article, etc. Not be a person who is deemed to have a close relationship with a gangster management governing corporation, etc. or a gangster prescribed in Article 7 of the Ordinance (including cooperating businesses included in the system for carrying out this business).
(4) Persons who have not violated Article 23, Paragraph 1 or Paragraph 2 of the Kanagawa Prefectural Gangster Exclusion Ordinance (2010 Kanagawa Prefectural Ordinance No. 75) (including cooperating businesses included in the system for implementing this work) )
(5) Do not fall under the provisions of Article 167-4 of the Local Autonomy Law Enforcement Ordinance (Government Ordinance No. 16 of 1947).
(6) In accordance with the Bankruptcy Law (Act No. 75 of 2004), no petition for commencement of bankruptcy proceedings has been filed and no decision has been made to commence.
(7) Have not been subject to suspension of bank transactions.
(8) A petition for commencement of rehabilitation proceedings pursuant to the Corporate Rehabilitation Act (Act No. 172 of 1952) or a petition for rehabilitation proceedings pursuant to the Civil Rehabilitation Act (Act No. 225 of 1999) has not been filed (rehabilitation or rehabilitation proceedings) Excluding those who have been decided and who have recognized by Yokohama City that there is no risk of falling into unperformance).
(9) Have a business performance similar to this project (two projects have been implemented for the design and introduction of photovoltaic power generation facilities on the roof or roof of high-pressure facilities during the period from FY2018 to FY2022). However, the actual results do not have to be business results in Motoichi. In addition, the results of cooperating companies included in the system for implementing this work may be used.
(10) A person with the following qualifications can be included in the system to carry out this work.
Oh, first-class architect of structural design according to the Architect Law (Law No. 202 of 1950)
(i) Chief Engineer of Electricity (Type 3 or higher)
Date of hearing
Date of hearing (time, etc.)
※The interview has been completed.
Scheduled to be held in early November 2023.
Details will be announced separately.
About application
Documents to be submitted
※Application for participation has been closed.
Businesses that intend to participate in this proposal must submit a participation intention application form (Form 1) and a written oath (Form 2).
Place of submission
※Application for participation has been closed.
〒231-0005 6-50-10 Honcho, Naka-ku, Yokohama City Hall, 23rd floor
Facility Division, City of Yokohama, Resources and Waste Recycling Bureau Proper Treatment Planning Department
In charge: Tanii, on the water
Telephone: 045-671-2517
Email address: sj-denki@city.yokohama.jp
How to apply
※Application for participation has been closed.
Bring or mail (registered registered mail, registered mail)
・In the case of mailing, be sure to contact the submission address after shipping.
・In the case of bringing, please contact the person in charge at the Resources and Waste Recycling Bureau Facility Division (Yokohama City Hall 23F) between 9:00 am and noon on weekdays and from 1:00 pm to 5:00 pm after telephone contact in advance.
Submission period
※Application for participation has been closed.
Tuesday, September 5, 2023 5:00 pm (must arrive)
Application deadline
Related materials
Related materials
※Application for participation has been closed.
Question answer
If you have any questions about the contents of these guidelines, etc., submit a questionnaire (Form 3) as follows. Questions and answers will be notified to all persons who have confirmed that they are qualified for the proposal.
If you do not have any questions, you do not need to submit a questionnaire.
(1) Submission deadline: 5:00 pm on Wednesday, September 20, 2023 (must arrive)
※Questions after the deadline will not be accepted at all.
(2) How to submit: E-mail
(3) Destination: The same as where to submit the application
(4) Answer: Answer by e-mail by 5:00 pm on Wednesday, September 27, 2023.
Notification of eligibility confirmation and submission request
[Notice of Participation Eligibility Confirmation Results]
Confirm that the applicant who submitted the application form satisfies the qualifications of the proposer, and notify all applicants who intend to participate in the proposal qualification confirmation result notification. At the same time, a proposal-related document submission request will be issued to all persons who have confirmed that they are satisfied with the proposal qualifications.
Notification date: Notification by e-mail by 5:00 pm on Tuesday, September 12, 2023
[Request for Submission]
If you are qualified to make a proposal, please carefully check the proposal preparation procedure and submit the proposal.
(1) Number of copies submitted: 9 copies (primary copy, 8 copies)
(2) Submission address :The same as where to submit the application
(3) Submission deadline: 5:00 pm on Wednesday, October 18, 2023 (must arrive)
(4) How to submit: Bring or mail (registered registered mail, registered mail)
・In the case of mailing, be sure to contact the submission address after shipping.
・In the case of bringing, please contact the person in charge at the Resources and Waste Recycling Bureau Facility Division (Yokohama City Hall 23F) between 9:00 am and noon on weekdays and from 1:00 pm to 5:00 pm after telephone contact in advance.
Other Documents and Communications
Implementation of local information
(1) Implementation site
Newmeidai disposal site 7th wastewater treatment facility and Kanagawa Transportation Office planned area, electric room
(2) Date and time of implementation
Either from 9:00 am to 5:00 pm on Wednesday, September 13, 2023, from 9:00 am to 5:00 pm on Thursday, September 14, 2023, the detailed time will be notified by the proposer confirmation result notification. Notify.
(3) Acceptance method
Those who wish to provide local guidance must declare their wish to participate in the local guidance when submitting the application form.
(4) Notes
・Photographing other than places permitted by the Secretariat is prohibited.
・It is forbidden to use the information obtained through local guidance for any purpose other than participating in this proposal.
・The number of participants in the local guide is limited to 5 people.
・Questions and answers at the time of local guidance are not accepted in principle. We will respond based on the "Questionnaire (Form 3)".
Ordering Division
Items | Information for each item |
---|---|
Section in charge | City of Yokohama, Resources and Waste Recycling Bureau Facility Division |
Address | 〒231-0005 6-50-10, Honcho, Naka-ku, Yokohama-shi |
Phone number | 045-671-2517 |
Fax | 045-664-9490 |
Other contact information | sj-denki@city.yokohama.jp |
Contract Section
The same as the Ordering Division
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Facility Division, Resources and Waste Recycling Bureau Proper Treatment Planning Department
Telephone: 045-671-2518
Telephone: 045-671-2518
Fax: 045-664-9490
Email address: sj-shisetsu@city.yokohama.lg.jp
Page ID: 958-875-699