Q&As

Last update date April 1, 2022

Q
1 When should I submit a report?
A

1 Building confirmation application (plan notice) It is up to 21 days before the scheduled date.
(If an optional report is made on a non-specified building less than 2,000 m2, until before the scheduled start date of construction)

Q
2 Is a power of attorney required for notification? Also, do you have a form?
Q
3 A copy of the registration form of the Energy Conservation Act is to be attached to the registration form, but it cannot be submitted at the same time.
A

3 Notifications based on the Energy Conservation Law must be made 21 days before the scheduled start date of construction. However, in order to use the calculation results when evaluating CASBEE Yokohama, please submit the calculation results at the same time as possible.
Even if it is difficult to submit a report at the same time, the notification of CASBEE Yokohama will be submitted up to 21 days before the scheduled date of the building confirmation application, so please follow the deadline. (In this case, the plan sheet may be a temporary number, etc. Please submit a notification of the Energy Conservation Law as soon as it is ready. )

Q
4 What should I do if the plan contents are changed?
A

4 If there is a change in the plan contents, at least 15 days before the scheduled date of change confirmation application (plan notification) scheduled date and the scheduled start date of construction according to the content. ), Please attach the books and data related to the change, and submit the Building Environmental Consideration Plan Change registration form (2 copies).

Q
5 What kind of procedures are required when the construction is completed?
A

5 Please submit specific building construction completion registration form (two copies) within 15 days after construction is completed. In addition, there is no completion inspection.

Q
6 Notification when there are multiple buildings on the site
A

6 Judge whether or not each building is subject to notification, and create a registration form for each building. In addition, when conducting an evaluation, set the site of "virtual closed space" related to construction work for the building to be notified, and evaluate it. Please contact us for more information.

Q
7 About notification in the case of extension
A

7 Determine whether the area of the extension is subject to notification, and submit a report. In addition, when conducting an evaluation, in principle, set a site of a "virtual closed space" related to construction work for the extension part and evaluate it. Please contact us for more information.

Q
8 Do we have to evaluate wood use and SDGs evaluation?
A

Both are optional.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Building Planning Division, Housing and Architecture Bureau Building Guidance Department

Phone: 045-671-4526

Phone: 045-671-4526

Fax: 045-550-3513

Email address: kc-casbee@city.yokohama.jp

Return to the previous page

Page ID: 209-129-614

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews