Q&As

Last Updated April 1, 2022

Q
1 By when should I submit the notification?
A

1 Building confirmation application (plan notice) Up to 21 days before the scheduled date.
(When making voluntary reports on non-specific buildings less than 2,000m2, up to the scheduled start date of construction)

Q
2 Is a power of attorney required for notification? Also, do you have a format?
Q
3. A copy of the Energy Conservation Law registration form is to be attached to the registration form, but it cannot be submitted at the same time.
A

3 Notifications based on the Energy Conservation Law are made up to 21 days prior to the scheduled start of construction, but since the calculation results are used when evaluating CASBEE Yokohama, please submit them at the same time as possible.
Even if it is difficult to submit a report at the same time, the report of CASBEE Yokohama will be made up to 21 days before the scheduled date of application for building confirmation, so please follow the deadline. (In this case, the plan sheet may be a temporary numerical value, etc. Please submit the notification of the Energy Conservation Law as soon as it is ready. )

Q
4 If the plan contents are changed, what should I do?
A

4 If there is a change in the contents of the plan, please submit a change confirmation application (plan notification) at least 15 days prior to the scheduled date of construction start (changes such as the name of the building, the owner, etc., immediately after the change) Please attach the books and data related to the change and submit the registration form (2 copies of the main and secondary copies).

Q
5 What kind of procedures are available when the construction is completed?
A

5 Within 15 days after the completion of the construction, please submit the specified building construction completion registration form (2 copies of the main and secondary copies). There is no completion inspection.

Q
6. Notification when there are multiple buildings on the site
A

6 We will determine whether each building is subject to notification and create a registration form for each building. In addition, when performing an evaluation, set a site for "virtual closed space" related to construction work for the building subject to notification and evaluate it. Please contact us for more information.

Q
7 About notification in case of extension
A

7 Judgment is made to determine whether the area of the extension part is subject to notification and submit a report. In addition, when conducting an evaluation, in principle, set a site for "virtual closed space" related to construction work for the extension part and evaluate it. Please contact us for more information.

Q
8 Do we have to evaluate wood use and SDGs?
A

8 Both are optional.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Building Planning Division, Housing and Architecture Bureau Building Guidance Department

Telephone: 045-671-4526

Telephone: 045-671-4526

Fax: 045-550-3568

Email address: kc-casbee@city.yokohama.lg.jp

Return to the previous page

Page ID: 209-129-614

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews