Menu of ward

Close

Here's the text.

Road self-financing construction

Last update date December 19, 2023

What is road self-financing construction?

If a person other than the road manager performs construction related to the road, it must be approved by the road manager.

Application details for main road self-financing construction

  • Construction of sidewalks, L-shaped, and curbs for vehicle entry
  • Relocation or removal of car stops and tree-planting basins for vehicle entry
  • Relocation of curved mirrors, street trees, etc. (telephone poles are permitted by NTT, telephone poles are permitted by Tokyo Electric Power Company)
  • Devaluation work for setting designated roads
  • Repair and restoration of damaged pavement
  • Road maintenance associated with development and residential land development
  • In addition, when changing the form of a road structure

Documents to be submitted

attached documents

  • Guide map (specify the location with a copy of a house map, etc.)
  • Floor plan (illustrates the construction site and the details of the enforcement to those that show the entire site)
  • Vertical Crossing
  • Structural diagram

Road Structure Standard Maps (City of Yokohama, Road and Highway Bureau)
L-shaped gutters, U-shaped gutters, asphalt concrete pavement, ground boundary blocks, etc.
“Yokohama City Sewerage Design Standard Map (Tube)” (City of Yokohama, Environmental Planning Bureau)
LU-type gutters, LO-type gutters, rainwater basins (city culverts), etc.

  • Photographs of the current situation
  • Copy of road ledger or copy of boundary survey map of road waterway (available in Public Works Office)

Road ledger map information "Yokohama no Michi" (outside site)

  • Copy of official map
  • Construction estimate (reference level)

2.Notification of start (after issuance of approval letter, before construction)

3.Notification of completion (after completion of construction)

Flow of procedures for applying for self-financing construction

Submission of application form → Field survey → Issuance of Approval Certificates → Submission of start notification → Construction work → Submission of completion notification (attached documents: local guide map, photos during construction and completion) → After the inspection, a letter of acceptance is issued

Inquiries to this page

Asahi Ward Asahi Public Works Office

Telephone: 045-953-8801

Telephone: 045-953-8801

Fax: 045-952-1518

Email address: do-asahiiken@city.yokohama.jp

Return to the previous page

Page ID: 752-282-246

Menu of ward

  • LINE
  • Twitter
  • YouTube