- Yokohama-shi Top Page
- Asahi Ward Top Page
- Living and Procedures
- Community Development and Environment
- Public Works Office
- Roads
- Road self-financing construction
Here's the text.
Road self-financing construction
Last update date December 19, 2023
What is road self-financing construction?
If a person other than the road manager performs construction related to the road, it must be approved by the road manager.
Application details for main road self-financing construction
- Construction of sidewalks, L-shaped, and curbs for vehicle entry
- Relocation or removal of car stops and tree-planting basins for vehicle entry
- Relocation of curved mirrors, street trees, etc. (telephone poles are permitted by NTT, telephone poles are permitted by Tokyo Electric Power Company)
- Devaluation work for setting designated roads
- Repair and restoration of damaged pavement
- Road maintenance associated with development and residential land development
- In addition, when changing the form of a road structure
Documents to be submitted
attached documents
- Guide map (specify the location with a copy of a house map, etc.)
- Floor plan (illustrates the construction site and the details of the enforcement to those that show the entire site)
- Vertical Crossing
- Structural diagram
Road Structure Standard Maps (City of Yokohama, Road and Highway Bureau)
L-shaped gutters, U-shaped gutters, asphalt concrete pavement, ground boundary blocks, etc.
“Yokohama City Sewerage Design Standard Map (Tube)” (City of Yokohama, Environmental Planning Bureau)
LU-type gutters, LO-type gutters, rainwater basins (city culverts), etc.
- Photographs of the current situation
- Copy of road ledger or copy of boundary survey map of road waterway (available in Public Works Office)
Road ledger map information "Yokohama no Michi" (outside site)
- Copy of official map
- Construction estimate (reference level)
2.Notification of start (after issuance of approval letter, before construction)
3.Notification of completion (after completion of construction)
Flow of procedures for applying for self-financing construction
Submission of application form → Field survey → Issuance of Approval Certificates → Submission of start notification → Construction work → Submission of completion notification (attached documents: local guide map, photos during construction and completion) → After the inspection, a letter of acceptance is issued
Inquiries to this page
Asahi Ward Asahi Public Works Office
Telephone: 045-953-8801
Telephone: 045-953-8801
Fax: 045-952-1518
Email address: do-asahiiken@city.yokohama.jp
Page ID: 752-282-246